infiniti g20 head gasket torque sequense

You search PDF repair manual about infiniti g20 head gasket torque sequense, if there are search results will appear below. If search results do not exist, please search by others keyword.



  infiniti g20 head gasket torque sequense Direct Download speed 5432 Kb/s

  infiniti g20 head gasket torque sequense Full Version speed 8172 Kb/s



2001 Pontiac Sunfire L4-2.2L VIN 4 Cylinder Head Removal And Installation Manual

0

Filed Under (Pontiac Manuals) by admin on 11-06-2012

download
Cylinder Head Replacement * Tools Required * J28467-360 Engine Support Fixture * J36660-A Torque Angle Meter. Removal Procedure 1. Disconnect the negative battery cable. 2. Relieve the fuel system pressure. 3. Drain cooling system . 4. Remove the alternative fuel module assembly. Remove the drive belt . 5. Remove the air cleaner outlet duct and resonator assembly. 6. Support engine using floor jack and block of wood. 7. Remove the engine mount . 3. Remove the intake manifold . 9. Remove the exhaust manifold 10. Disconnect the Engine Coolant Temperature Sensor ( ECT ) electrical connection. 11. Remove the valve rocker arm cover. Important: When removing valve train components keep them in order. Do this to ensure that the components are installed in the same locations and with the same mating surfaces as when removed. 12. Remove the rocker arms and pushrods. 13. Remove the generator. 14. Remove the generator rear brace. 15. Remove the power steering pump. Position the pump aside with the lines attached. 16. Remove the radiator inlet pipe. 17. Remove the ignition coil assembly. 18. Remove the accessory bracket. 19. Disconnect the secondary ignition wires from the spark plugs . 20. Remove the cylinder head bolts. 21. Remove the cylinder head. 22. Clean the following components: * Head gasket surface * Valve rocker arm cover gasket surface * Threads Installation Procedure Important: Install the cylinder head gasket with the words THIS SIDE UP showing. Do not use sealer on the gasket. 1. Install the cylinder head gasket to the block. 2. Use a socket in order to push the cylinder head gasket over the rear dowel pin Important: Install the cylinder head gasket with the words THIS SIDE UP showing. Do not use sealer on the gasket. 1. Install the cylinder head gasket to the block. 2. Use a socket in order to push the cylinder head gasket over the rear dowel pin

Related Content:

01 sunfire head gasket, 2004 kia sorento head gasket, 02 Buick rendezvous head gasket install you tube, What all should be done to a Pontiac Montana when fixing a head gasket leak?, how to fix the head gasket on a 2001 Pontiac Grand Prix, how to remove a kia 2 7 bakkie 2007 model air manifold gasket, how to replace saab 93 turbo head gasket, i changed the head gasket on my 2005 buick rendezvous now motor is shaking, installing 400 pontiac heads, labor time 2002 f150 head gaskets

1999 Ford Escort/ Tracer Cylinder Head Removal And Installation Manual

0

Filed Under (Ford Manuals) by admin on 24-04-2012

download
Removal 1. Disconnect the battery ground cable (14301). For additional information, refer to Section 414-01 . 2. WARNING: Fuel supply lines will remain pressurized for long periods of time after engine shut down. This pressure must be relieved before disconnecting any fuel lines or fuel system components. Relieve the fuel system pressure. For additional information, refer to Section 310-00 . 3. Remove the engine air cleaner outlet tube. For additional information, refer to Section 303-03 . 4. Remove the timing belt. For additional information, refer to Timing Drive Components—Timing Belt in this section. 5. Remove the vacuum hoses at the: * positive crankcase ventilation (PCV) valve (6A666). * throttle body (9E926). * intake manifold (9424). * fuel pressure sensor. 6. Disconnect the fuel charging wiring (9D930) electrical connectors at main engine connector. 7. Disconnect the crankshaft position (CKP) sensor electrical connector. 8. Disconnect the fuel line. For additional information, refer to Section 303-04 . 9. Remove the power steering pump (3A674) and bracket as an assembly. For additional information, refer to Section 211-02 . 10. Remove the generator (GEN). For additional information, refer to Section 414-02 . 11. Remove the oil level indicator tube (6754). For additional information, refer to Oil Level Indicator and Tube in this section. 12. Disconnect the heater hoses. For additional information, refer to Section 412-02 . 13. Lower the vehicle. 14. Disconnect the upper radiator hose (8260) from the thermostat housing water hose connection. For additional information, refer to Section 303-03 . 15. Remove the camshafts (6250). For additional information, refer to Camshaft in this section. 16. Remove the ignition coil (12029) and bracket. For additional information, refer to Section 303-07 . 17. Remove the water thermostat housing. For additional information, refer to Section 303-03 . 18. Disconnect the knock sensor electrical connector. 19. Remove the generator bracket-to-cylinder head bolt. 20. Remove the bolts and the cylinder head (6049). 21. Remove the cylinder head gasket and discard. Installation WARNING: Do not smoke or carry lighted tobacco or open flame of any type when working on or near any fuel related components. Highly flammable mixtures are always present and may be ignited, resulting in possible personal injury. 1. CAUTION: Do not use abrasive grinding discs to remove gasket material; use only plastic manual scrapers. Do not scratch or gouge the aluminum sealing surfaces. Clean all gasket material from the mating surfaces on the cylinder head and cylinder block. Clean out the bolt holes in the cylinder block. Inspect the cylinder head for flatness. For additional information, refer to Section 303-00 . 2. Install a new head gasket on the cylinder block. 3. CAUTION: Do not attempt to install the cylinder head assembly without assistance. Installation of the cylinder head assembly requires two people or possible injury may occur. CAUTION: The bolts are torque-to-yield and must be replaced or engine damage may occur. Tighten the bolts in three stages in the sequence shown. * Stage 1: Tighten the bolts to 15-25 Nm (12-18 lb-ft). * Stage 2: Tighten the bolts to 35-45 Nm (26-33 lb-ft). * Stage 3: Tighten the bolts an additional 105 degrees. 4. Install the generator bracket-to-cylinder head bolt. * Tighten to 20 Nm (15 lb-ft). 5. Connect the knock sensor electrical connector. 6. Install the thermostat housing. For additional information, refer to Section 303-03 . 7. Install the ignition coil and bracket. For additional information, refer to Section 303-07 . 8. Install the camshafts. For additional information, refer to Camshaft in this section. 9. Connect the upper radiator hose. For additional information, refer to Section 303-03 . 10. Raise and support the vehicle. For additional information, refer to Section 100-02 . 11. Install the heater hoses. For additional information, refer to Section 412-02 . 12. Install the generator and bracket assembly. For additional information, refer to Section 414-02 . 13. Install the power steering pump and bracket assembly. For additional information, refer to Section 211-02 . 14. Connect the fuel lines. For additional information, refer to Section 310-00 . 15. Connect the crankshaft sensor electrical connector.

Related Content:

fleetwood sedona manuals, Honda Civic 2003 number #3 Cylinder pattern, 2001 mitsubishi 3 0 cylinder torque specs, Workshop Manual (WSM) Section 303-04, 4 8 head bolt tightening sequence, workshop information system saab, where is the knock sensor on a 2006 toyota tundra 4 7 v-8 truck, trailblazer front frame section, throttle postioning system in ford five hundred, pdf Ford manual Section 501-02

2000-2004 Toyota Tundra 4.7L V-8 Two and Four Wheel Drive Installation Manual

0

Filed Under (Toyota Manuals) by admin on 27-03-2012

download
1. Place vehicle in a location where the floor is solid and flat, with adequate lighting. Do not attempt to work on a hot engine. Heat causes metal to expand and makes removal of fasteners difficult at best. Disconnect the battery cables from the battery. Raise the front of the vehicle to obtain adequate access to the bottom exhaust manifold flanges. Use large-base jack stands to support the vehicle. Do not rely on the jack! Block the tires to prevent the vehicle from rolling off the jack stands. 2. Spray WD-40 or some type of penetrating oil on all accessible fasteners and fittings before attempting to remove them. 3. From underneath the vehicle disconnect the exhaust system from the exhaust manifolds by unbolting the (3) bolts at the collectors. Then unbolt the driver side catalytic converter from the exhaust assembly and temporarily remove it from the vehicle. PASSENGER SIDE 4. On the passenger side remove the (4) bolts attaching the heat shields to the factory manifold. 5. Next, carefully unplug the O2 sensor from its harness. 6. Now remove the nuts attaching the factory manifold to the cylinder head. With the manifold out of the way remove the mounting studs from the cylinder head. 7. Using a small wire brush or similar instrument, clean any carbon deposits left on the head surface. Be careful not to gouge the aluminum head. 8. Transfer the O 2 sensor from the factory manifold to the new passenger side header. Apply a small amount of anti seize to the threads for the sensor before installing it in the new header. Use caution not to drop or damage the sensor, they are fragile. 9. Now you are going to install the new JBA Header, but first there is some preparation of the hardware required. Apply anti seize to the threads of the new fasteners. Install the new JBA Header using the supplied gasket and fasteners. Torque to 23 ft./lbs. DRIVER’S SIDE 10. Just like you did in step (4) remove the (4) bolts attaching the heat shields to the driver side factory mani- fold. 11. Next, carefully unplug the O2 sensor from its harness. Unbolt the dipstick bracket from the head and remove the dipstick tube. 12. Remove the nuts attaching the factory manifold to the cylinder head. With the manifold out of the way remove the mounting studs from the cylinder head. 13. Using a small wire brush or similar instrument, clean any carbon deposits left on the head surface. Be careful not to gouge the aluminum head. 14. Transfer the O 2 sensor from the factory manifold to the new driver side header. Apply a small amount of anti seize to the threads for the sensor before installing it in the new header. Use caution not to drop or damage the sensor, they are fragile. 15. As you did on the passenger side, prepare the hardware before installing the driver side header. Apply anti seize to the threads of the new fasteners. Install the new JBA Header using the supplied gasket and fasteners. Torque to 23 ft./lbs. Re-install the dipstick tube. 16. Install the driver side catalytic converter. 17. Connect the exhaust system to the new headers using hardware and gaskets supplied. Reconnect O2 sensors. 18. Check to insure adequate clearance between header and shifter cable (small cable that runs from firewall, to brace on fender well, to transmission) . More clearance can be gained by adjusting (bending) brace on fender well. 19. Recheck everything

Related Content:

2004 honda civic head bolt torque, 4y toyota head torque

1995 Ford Truck F 150 2WD Pickup New Cylinder Head Bolt Repair Manual

0

Filed Under (Ford Manuals) by admin on 20-02-2012

download
ORQUE SPECIFICATIONS FOR THE NON-FLANGED STANDARD HEX HEAD BOLTS, TIGHTEN IN TWO (2) STEPS AS FOLLOWS: 1. Tighten all bolts in sequence (Figure 2) to 75-88 N-m (55-65 lb.ft.). 2. Tighten all bolts in sequence (Figure 2) to 88-98 N-m (65-72 lb.ft.). FOR ALL TORQUE TO YIELD HEX HEAD BOLTS, TIGHTEN IN THREE (3) STEPS AS FOLLOWS: 1. Tighten all bolts in sequence (Figure 2) to 34-47 N-m (25-35 lb.ft.). 2. Tighten all bolts in sequence (Figure 2) to 61-75 N-m 45-55 lb.ft.). 3. Tighten all bolts in sequence (Figure 2) an additional 1/4 turn (85-95 degrees). NOTE: WHEN THE CYLINDER HEAD BOLTS HAVE BEEN TIGHTENED FOLLOWING THESE PROCEDURES, IT IS NOT NECESSARY TO RETIGHTEN THE BOLTS AFTER EXTENDED OPERATION. CAUTION: TORQUE-TO-YIELD CYLINDER HEAD BOLTS MUST BE REPLACED WITH NEW BOLTS. DO NOT REUSE TORQUE-TO-YIELD BOLTS. TORQUE-TO-YIELD BOLTS MAY ONLY BE USED ONE (1) TIME. PART NUMBER PART NAME F3ZZ-6065-E Cylinder Head Bolt

Related Content:

1999 2 5 ford ranger head bolt torque, D-17 manfold bolt torqe, ranger 1999 3 0 head torque diagram, torque angle specs 3100 1998 buick, torque sequence 300m 3 5 heads

2003 Chevrolet Impala LS MULTIFUNCTION TURN SIGNAL SWITCH REPLACEMENT

0

Filed Under (Chevrolet Manuals) by admin on 06-01-2012

download
1. Disable the SIR system. Refer to SIR Disabling and Enabling Zone 3 in SIR. 2. Remove the upper and lower trim covers. Refer to Steering Column Trim Covers Replacement . 3. Remove the wire harness assembly (1) from the wire harness strap (2). 4. Disconnect the turn signal and multifunction switch assembly connector from the SIR system coil connector. 5. Slide the 2 connectors (2) of the turn signal and multifunction switch assembly out of the bulkhead connector (1) 6. Remove the 2 pan head tapping screws (1) and (3) from the turn signal and multifunction switch assembly (2). 7. Remove the turn signal and multifunction switch assembly (2) from the steering column tilt head assembly. 1. Install the turn signal and multifunction switch assembly (2) onto the steering column tilt head assembly. 2. Screw the 2 pan head tapping screws (1) and (3) into the turn signal and multifunction assembly (2). Tighten * Tighten the top pan head tapping screw (1) to 3 N.m (27 lb in). * Tighten the side pan head tapping screw (3) to 7 N.m (62 lb in).

Related Content:

how to adjust the directional switch on an implala 1962, 00 impala turnsignal problems, 1962 impala blinker switch, 2006 impala haynes repair manual, 62 corvette turn signal adjustment, haynes repair manual 2007 chevrolet impala pdf

Chevrolet V8 With General Duty Oval Port Cylinder Heads STREET TUNNEL RAM INTAKE MANIFOLD INSTALLATION INSTRUCTIONS

0

Filed Under (Chevrolet Manuals) by admin on 28-12-2011

download
CAMSHAFT AND HEADERS: The Street Tunnel Ram manifold is compatible with aftermarket camshafts and headers. Use Edelbrock Torker-Plus camshaft #5062 for more low RPM torque, or the Edelbrock Performer RPM camshaft #7162 for more high RPM power. Header primary tube diameter should be 1-7/8″. This may vary depending upon your particular engine specifications. PREP AND TUNING FOR POWER: 1. Specific applications may show an increase in performance through additional carburetor tuning. 2. Aftermarket distributor curve kits and aftermarket ignitions may be used with the Street Tunnel Ram intake manifold. 3. Use modified or high performance cylinder heads such as our Performer RPM, and port match the intake manifold to the heads. 3. The engine’s compression ratio should be at least 9.5:1 to work properly with Torker-Plus or Performer RPM camshafts. INSTALLATION PROCEDURE INTAKE MANIFOLD BASE 1. Use only recommended intake gaskets set when installing this intake manifold. 2. Fully clean the cylinder head intake flanges and the engine block end seal surfaces. 3. Apply Edelbrock Gasgacinch sealant P/N 9300 to both cylinder head flanges and to the cylinder head side of the gaskets, allow to air dry, and attach the intake gaskets. 4. Do not use cork or rubber end seals. Use RTV silicone sealer instead. Apply a ¼” high bead across each block end seal surface, overlapping the intake gasket at the four corners. This method will eliminate end seal slippage. 5. Install the intake manifold hold-down bolts. Hand tighten all bolts to approximately 5 ft./lbs. to center the manifold on the engine. WARNING: There is no gasket support for the manifold under the four bolt holes which are numbered 13,14,15, and 16 in Figure 1 below. Damage to the manifold will occur if these four bolts are over tightened. Hand tighten these bolts with a 6″ box-end wrench. DONOT use a torque wrench. 6. Torque all of the remaining manifold bolts in two steps by the sequence shown in Figure 1 to 25 ft/lbs. INTAKE MANIFOLD TOP 1. Apply Edelbrock Gasgacinch sealant P/N 9300 to the gasket mating surface and install the gasket and manifold top. 2. Install and tighten the supplied hold down bolts to 15-18 ft./lbs.

Related Content:

what should i torque the carb to the intake at

305-400 C.I.D. Chevrolet V8 STREET TUNNEL RAM INTAKE MANIFOLD INSTALLATION INSTRUCTIONS

0

Filed Under (Chevrolet Manuals) by admin on 27-12-2011

download
INSTALLATION PROCEDURE INTAKE MANIFOLD BASE 1. Use only recommended intake gaskets set when installing this intake manifold. 2. Fully clean the cylinder head intake flanges and the engine block end seal surfaces. 3. Apply Edelbrock Gasgacinch sealant P/N 9300 to both cylinder head flanges and to the cylinder head side of the gaskets, allow to air dry, and attach the intake gaskets. 4. Do not use cork or rubber end seals. Use RTV silicone sealer instead. Apply a ¼” high bead across each block end seal surface, overlapping the intake gasket at the four corners. This method will eliminate end seal slippage. 5. Install the intake manifold hold-down bolts (We offer an Intake Manifold Bolt Kit #8504 that includes small-head silver Cadmium-plated bolts and matching hardened washers). Apply a small amount of RTV silicone to the threads of the eight inner bolts (1,2,3,4,5,7,9, & 11) (See Figure 1) . This will prevent oil weepage, as generally these are not blind holes in the cylinder head. 6. Torque all of the manifold bolts in two steps by the sequence shown in Figure 1 to 25 ft/lbs. INTAKE MANIFOLD TOP 1. Apply Edelbrock Gasgacinch sealant P/N 9300 to the gasket mating surface and install the gasket and manifold top. 2. Install and tighten the supplied hold down bolts using a liquid thread-locking compound on the bolt threads. As an extra safety precaution, we suggest you drill a small safety wire hole in the head of each bolt and safety wire them together. Edelbrock Corporation expressly disclaims any liability for any and all consequential damages.

2001 Toyota Echo Transmission and Drivetrain Removal And Installation Manual

0

Filed Under (Toyota Manuals) by admin on 10-03-2012

download
REMOVAL 1. REMOVE HOOD HINT: At the time of installation, please refer to the following item. Adjust the hood. 2. REMOVE WIPER ARM HINT: At the time of installation, please refer to the following item. Adjust the installation position of the wiper arms 3. REMOVE RH AND LH COWL TOP VENTILATOR LOUVERS 4. REMOVE NO. 2 CYLINDER HEAD COVER Remove the 4 nuts and No. 2 cylinder head cover. Torque: 7.0 Nm (71 kgf-cm, 62 inch lbs.) 5. REMOVE BATTERY AND AIR CLEANER CASE ASSEMBLY WITH AIR HOSE 6. DISCONNECT WIRE HARNESS FROM TRANSAXLE Remove the set bolt of the wire harness clamp. 7. DISCONNECT CONTROL CABLE a. Remove the 2 clips and washers. b. Remove the 2 clips and disconnect the control cables from the transaxle. 8. DISCONNECT CLUTCH RELEASE CYLINDER a. Remove the set bolt of the clutch line. Torque: 4.9 Nm (50 kgf-cm, 43 inch lbs.) b. Remove the 2 set bolts of the clutch release cylinder. Torque: 12 Nm (120 kgf-cm, 9 ft. lbs.) 9. DISCONNECT GROUND CABLE Remove the set bolt of the ground cable from the engine left mounting bracket. 10. DISCONNECT BACK-UP LIGHT SWITCH AND VEHICLE SPEED SENSOR CONNECTORS 11. REMOVE 2 TRANSAXLE UPPER SIDE MOUNTING BOLTS Torque: 33 Nm (340 kgf-cm, 25 ft. lbs.) 12. REMOVE STARTER SET BOLT Torque: 39 Nm (400 kgf-cm, 29 ft. lbs.) 13. ATTACH ENGINE SLING DEVICE TO ENGINE HANGER Zoom Sized for Print Zoom Sized for Print Zoom Sized for Print a. Remove the bolt. b. Install the 2 No. 1 engine hangers with the bolts in the correct direction. Parts No.: No. 1 engine hanger: 12281-21010 Bolt: 91642-81025 Torque: 40 Nm (400 kgf-cm, 29 ft. lbs.) c. Attach the engine chain hoist to the engine hangers. CAUTION: Do not attempt to hang the engine by hooking the chain to any other part. 14. RAISE VEHICLE CAUTION: Make sure that the vehicle is securely supported. 15. REMOVE LH ENGINE UNDER COVER 16. DRAIN TRANSAXLE OIL Oil grade: API GL-4 or GL-5 Viscosity: SAE 75W-90 Capacity: 1.9 liters (2.0 US qts, 1.7 Imp. qts) Torque: 39 Nm (400 kgf-cm, 29 ft. lbs.) 17. REMOVE RH AND LH FRONT DRIVE SHAFTS 18. REMOVE SUSPENSION MEMBER a. Remove the 2 set nuts and bolt of the engine rear mounting insulator from the suspension member. b. Disconnect the sliding yoke. c. Power steering: Disconnect the pressure feed and return tubes. d. Power steering: Disconnect the tube clamp

Related Content:

torque clutch converter solenoid problems 2001 isuzu rodeo, 2006 nissan navara d40 cylinder head bolt tightening

2000 Toyota Celica GT-S L4-1762cc 1.8L DOHC MFI – Removal and Installation Manual

0

Filed Under (Toyota Manuals) by admin on 26-02-2012

download
REMOVAL 1. REMOVE HOOD Torque: 13 Nm (130 kgf-cm, 9 ft. lbs.) 2. REMOVE BATTERY 3. REMOVE ECM AND ECM CASE Torque: 6.9 Nm (70 kgf-cm, 61 inch lbs.) 4. REMOVE ECM BRACKET Torque: Bolt: 18 Nm (185 kgf-cm, 13 ft. lbs.) Nut: 12 Nm (120 kgf-cm, 9 ft. lbs.) 5. REMOVE AIR CLEANER ASSEMBLY 6. REMOVE NO.2 CYLINDER HEAD COVER Torque: 7.0 Nm (71 kgf-cm, 62 inch lbs. 7. REMOVE 2 GROUND CABLES Torque: 18 Nm (185 kgf-cm, 13 ft. lbs.) 8. DISCONNECT CONTROL CABLE FROM CLAMP 9. DISCONNECT INPUT TURBINE SPEED SENSOR CONNECTOR 10. DISCONNECT COUNTER GEAR SPEED SENSOR CONNECTOR 11. REMOVE VEHICLE SPEED SENSOR CONNECTOR 12. REMOVE 2 UPPER SIDE TRANSAXLE MOUNTING BOLTS FROM TRANSAXLE Torque: 64 Nm (650 kgf- cm, 47 ft. lbs.) 13. DISCONNECT SOLENOID CONNECTOR AND PARK/NEUTRAL POSITION SWITCH CONNECTOR Disconnect the solenoid connector and park/neutral position switch connector. 14. DISCONNECT CONTROL CABLE 15. REMOVE BOLT AND DISCONNECT RADIATOR RESERVOIR Torque: 4.9 Nm (50 kgf-cm, 43 inch lbs.) 16. REMOVE STARTER 17. REMOVE LH, RH, CENTER ENGINE UNDER COVERS 18. DRAIN ATF FROM FRONT DIFFERENTIAL CASE Torque: 54 Nm (550 kgf-cm, 40 ft. lbs.) 19. REMOVE LH AND RH DRIVE SHAFTS.

Chevrolet Aluminum Cylinder Heads INSTALLATION INSTRUCTIONS

0

Filed Under (Chevrolet Manuals) by admin on 20-02-2012

download
Before final installation of the cylinder heads, several things need to be checked to assure proper engine operation: 1. Piston to valve clearance – Minimum intake valve clearance should be .080″. Minimum exhaust valve clearance should be .100″. The point of minimum intake valve to piston clearance will usually occur somewhere between 5 and 15º ATDC during valve overlap. The point of minimum exhaust valve to piston clearance will usually occur 15º to 5º BTDC during valve overlap. Re-machining of the piston top eyebrows may be required with some pistons. 2. Proper lifter adjustment and rocker geometry – Check Lifter pre-load. Check clearance of push rod to guideplate. Rocker geometry should be checked making sure that the contact point of the roller remains properly on the valve tip and does not roll off the edge. Visual inspection of the rockers, valve springs, retainers, and pushrods should be made to ensure that none of these components come into improper contact with each other. If problems with valve train geometry occur, simple changes such as pushrod length may have to be made. OTHER ASSEMBLY TIPS When installing the sparkplugs and exhaust headers, be sure to use a high temperature anti-seize compound on the threads to reduce the possibility of thread damage in the future. Do not exceed a torque of 25 ft./lbs. on the intake manifold bolts and lubricate the bolt threads prior to assembly. If pushrod to cylinder head contact is a problem, loosen rocker studs and re-position guideplate as needed for clearance. INSTALLATION: Installation is the same as for original equipment cylinder heads. Consult service manual for specific procedures, if necessary. For 350 and smaller engines, use Fel-Pro head gasket #1003. #1003 has a flattened steel O-ring around each bore and will provide an excellent, long lasting seal. However, it will compress the aluminum and you must use #1003 for subsequent gasket changes to get a good seal. For 400 c.i.d. small blocks, use Fel-Pro #1014. YOU MUST DRILL “STEAM HOLES” IN CYLINDER HEADS FOR 400 ENGINES (see Figure 2). Be sure that the surface of the block and the surface of the head are thoroughly cleaned to remove any oily film before installation. Use alcohol or lacquer thinner on a lint-free rag to clean. Apply Loctite PST or suitable thread sealer to head bolt threads. Torque to 65 ft./lbs. in three steps (30-50-65) following the factory tightening sequence (see Figure 1). A re-torque is recommended after initial start-up and cool-down (allow 2-3 hours for adequate cooling)

Related Content:

aisan heating cooling unit error codes, Fel Pro Gaskets Installation Instructions

Related Content:

01 sunfire head gasket, 2004 kia sorento head gasket, 02 Buick rendezvous head gasket install you tube, What all should be done to a Pontiac Montana when fixing a head gasket leak?, how to fix the head gasket on a 2001 Pontiac Grand Prix, how to remove a kia 2 7 bakkie 2007 model air manifold gasket, how to replace saab 93 turbo head gasket, i changed the head gasket on my 2005 buick rendezvous now motor is shaking, installing 400 pontiac heads, labor time 2002 f150 head gaskets