Skip to content

chevy 350 manifold gasket replacement

You search PDF repair manual about chevy 350 manifold gasket replacement, if there are search results will appear below. If search results do not exist, please search by others keyword.

2002 Chevrolet Chevy Suburban – 4WD Intake Manifold Replacement Manual

download
Removal Procedure Important: The intake manifold, throttle body, fuel rail, and injectors may be removed as an assembly. If not servicing the individual components, remove the manifold as a complete assembly. 1. Remove the throttle body. Refer to Throttle Body Assembly Replacement in Engine Controls – 4.8L, 5.3L, and 6.0L. 2. Remove the fuel injectors. Refer to Fuel Injector Replacement in Engine Controls – 4.8L, 5.3L, and 6.0L. 3. Disconnect the following electrical connectors: 4. Remove the knock sensor harness electrical connector from the intake manifold. 5. Set the electrical harness aside. <- Back Forward -> Document ID# 738735 2002 Chevrolet Chevy Suburban – 4WD Print – Manifold absolute pressure (MAP) sensor (1) – Knock sensor (2) – Exhaust gas recirculation (EGR) valve, if equipped. 6. If equipped, remove the following EGR pipe bolts: 7. If equipped, remove the EGR pipe with valve. 8. If equipped, remove the EGR pipe gasket from the exhaust manifold If equipped with vacuum assisted brakes, remove the vacuum brake booster hose from the rear of the intake manifold.

2001 Chevy Truck S10/ T10 Blazer Intake Manifold Replacement (Upper) Removal And Installation Manual

download
Intake Manifold Replacement (Upper) Notes Intake Manifold Replacement – Upper Removal Procedure Important: The upper intake does not have to be removed to remove the lower intake manifold. 1. Disconnect the breather tube at the air cleaner outlet duct 2. Remove the air cleaner outlet duct retaining wingnut. 3. Disconnect the IAT sensor harness connector 4. Remove the air cleaner outlet duct from the throttle body. 5. Disconnect the accelerator cable from the throttle body 6. Remove the accelerator cable from the accelerator control cable bracket. 7. Disconnect the cruise control cable, if equipped from the throttle shaft and the accelerator cable bracket. 8. Disconnect the vacuum hose from the intake manifold for the vacuum tank. 9. Remove the power brake booster vacuum hose. 10. Disconnect the following electrical connectors: * The A/C compressor clutch (1) * The A/C compressor cutoff switch (5), if equipped * The Throttle Position (TP) sensor (2) * The Idle Air Control (IAC) motor (3) 11. Disconnect the following electrical connectors: * The fuel meter body assembly (1) * The Manifold Absolute Pressure (MAP) sensor(3) * The EVAP canister purge solenoid valve (2) 12. Remove the engine wire harness clip from the accelerator cable bracket. 13. Move the engine wiring harness aside. 14. Remove the accelerator cable bracket from the throttle body and the intake manifold. 15. Remove the accelerator and cruise control cable bracket from the throttle body. Leave the accelerator and cruise control cables on the bracket16. Remove the PCV valve hose assembly from the intake manifold and the valve rocker arm cover. 17. Remove the bracket for the engine wiring harness from the intake manifold stud. 18. Remove the fuel lines from the fuel meter body assembly. 19. Remove the EVAP canister purge solenoid valve.

2002 Chevrolet Impala Intake Manifold Replacement (Lower) Removal And Installation Manual

download
Intake Manifold Replacement (Lower) Notes Intake Manifold Replacement – Lower Removal Procedure 1. Disconnect the negative bakery. 2. Remove the upper intake manifold. 3. Remove the left valve rocker arm cover. 4. Remove the right valve rocker arm cover. 5. Disconnect the Engine Coolant Temperature ( ECT ) sensor electrical connector. 6. Disconnect and remove the fuel injector and the Manifold Absolute Pressure (MAP) sensor wiring harnesses. 7. Remove the fuel pipe clip bolt. 8. Remove the fuel pipe clip. 9. Remove the fuel feed pipe from the fuel injector rail. 10. Remove the fuel return pipe from the fuel injector rail. 11. Remove the fuel injector rail. 12. Remove the power steering pump from the front engine cover and reposition. 13. Remove the heater inlet pipe with heater hose from the lower intake manifold and reposition. 14. Remove the radiator inlet hose from the engine. 16. Remove the lower intake manifold bolts. 17. Remove the lower intake manifold. 18. Remove the valve rocker arms and pushrods. 19. Remove the lower intake manifold gaskets and seals. 20. Clean the lower intake manifold gasket mating surfaces. 21. Remove and clean all the RTV sealant from the lower intake manifold and the engine block (1).

2004 Chevrolet Chevy K Silverado – 4WD Evaporative Emission (EVAP) Canister Vent Solenoid Valve Replacement Pickup

download
Evaporative Emission (EVAP) Canister Vent Solenoid Valve Replacement Pickup Removal Procedure Important Clean the evaporative emission (EVAP) connections and surrounding areas prior to disconnecting the fittings in order to avoid possible system contamination. 1. Raise and suitably support the vehicle. Refer to Lifting and Jacking the Vehicle in General Information. 2. Remove the harness clip from the canister vent solenoid (CVS) line. 3. Disconnect the CVS electrical connector. 2004 Chevrolet Chevy K Silverado – 4WD 4. If the vehicle is equipped with a 6 ft box, disconnect the EVAP CVS line from the canister. 5. Remove the CVS clip from the frame crossmember. 6. Push in the retainer and remove the CVS from the fuel tank clip. 7. If the vehicle is equipped with a 8 ft box, disconnect the EVAP CVS line from the canister. 8. Remove the CVS clip from the frame crossmember. 9. Push in the retainer and remove the CVS from the fuel tank clip. Installation Procedure 1. If the vehicle is equipped with a 8 ft box, install the CVS to the fuel tank until the clip engages. Important On vehicles equipped with a 8 ft box, the CVS line is routed below the frame crossmember. 2. Install the CVS clip to the frame crossmember. 3. Connect the EVAP CVS line to the canister. 4. If the vehicle is equipped with a 6 ft box, install the CVS to the fuel tank until the clip engages. Important On vehicles equipped with a 6 ft box, the CVS line is routed above the frame crossmember. 5. Install the CVS clip to the frame crossmember. 6. Connect the EVAP CVS line to the canister. 7. Connect the CVS electrical connector. 8. Install the harness clip to the canister vent solenoid (CVS) line. 9. Lower the vehicle.

REPLACEMENT TURBO OUTLET ELBOW TO DOWN-PIPE GASKET INSTALLATION MANUAL

download
DESCRIPTION: Kit contains a replacement outlet elbow to downpipe gasket as is used in Edelbrock Turbo Kits #1500, 1501, 1502, 1503, and 1504, for use when removing and replacing the downpipe for exhaust maintenence, engine maintenence, etc. INSTALLATION 1. Remove the down-pipe in the reverse order of installation as shown in your Edelbrock Turbo Kit instructions. 2. Make sure all gasket mating surfaces are clean and free of grease or oil, and make sure any old gasket material has been removed before installing the new gaskets. 3. Install the new gasket and install the down-pipe as shown in your Edelbrock Turbo Kit instructions