free head torque specs dodge dakota

You search PDF repair manual about free head torque specs dodge dakota, if there are search results will appear below. If search results do not exist, please search by others keyword.



  free head torque specs dodge dakota Direct Download speed 5432 Kb/s

  free head torque specs dodge dakota Full Version speed 8172 Kb/s



1999-2006 TOYOTA TUNDRA FRONT LEVELING SYSTEM FOR THE 6-LUG SUSPENSION INSTALLATION INSTRUCTIONS

0

Filed Under (Toyota Manuals) by admin on 04-12-2011

download
1. To begin installation, block the rear tires of the vehicle so that the vehicle is stable and can’t roll backwards. Safely lift the front of the vehicle and support the frame with jack stands. Place jack stands on both the driver and the passenger sides of the vehicle. Next remove the wheels from both sides. 2. Using a 17mm socket, remove the lower sway bar link bolt from both sides. HINT: If the stud turns together with the nut use a hex wrench or vice grips to hold the stud . 4. Next remove the strut’s lower mounting bolt with a 19 mm socket and wrench. NOTE: Once the nut is removed, it may be necessary to use a punch and hammer to free the bolt. 5. Remove the nuts from the three upper strut mounting bolts with a 14 mm ratchet. Be sure to support the strut assembly as the nuts are removed to prevent it from falling. 6. Remove the strut assembly from the vehicle and mount it in a bench vise. Install the steel strut extension on the top of the strut assembly. ** Caution: Use the factory nuts with the factory studs** 7. Run down nuts snug with end wrench. Torque to OEM specs. NOTE: Because of the shape of the steel spacer the strut will be rotated 180° when reinstalled. 8. Place strut back into upper strut mount. Tighten provided nuts snug with a 14mm wrench or ratchet (after install, you will torque to OEM specs). 9. Use a pry bar to position the lower control arm and the strut mount, and then reinstall the mounting bolt. Torque to OEM specs. 10. Place a jack under the lower control arm. Raise the lower control arm to reattach the lower ball joint bolts. Torque the ball joint nuts to OEM specs. 11. Repeat Steps 3 through 10 on the opposite side of the vehicle. 12. Reattach the sway bar link assembly on both sides of the vehicle. Torque to OEM specs. For 2wd trucks skip Step 13. 13. For 4×4 models only it is necessary to lower the differential using the provided spacers and bolts. Install the spacers following the instructions provided with the spacers. 14. Reattach the wheels. Torque to OEM specs. 15. Lower vehicle to the ground and torque strut mounts to OEM specs. 16. Align the vehicle. A certified alignment technician that is experienced with lifted vehicles is recommended to perform the alignment

Related Content:

2007 kia optima harmonic balancer bolt torque, volvo d13 flywheel torque spec, torque specs for 5 7 volvo penta exhaust manifold, torque specs 4 8 chevrolet, rod torque botyom end n14, ax4n pan bolt torque spec, 2006 chrysler 300 rocker torque specs 2 7, lug nut torque on isuzi, 2001 buick lesabre strut torque, cummins n14 torque specs

2004-2008 FORD F150 FRONT LEVELING SYSTEM INSTALLATION MANUAL

0

Filed Under (Ford Manuals) by admin on 19-12-2011

download
Front End Installation: 1. To begin installation, block the rear tires of the vehicle so that the vehicle is stable and can’t roll backwards. Safely lift the front of the vehicle and support the frame with jack stands. Place jack stands on both the driver and the p sides of the vehicle. Next remove the wheel from both sides. assenger s 2. Remove the upper strut mounts with a 15-mm wrench or . m socket. Using a ball cket. Use an socket. You will need a socket to remove the far strut mount 3. Remove the sway bar lower link pin bolt from the bottom of the control arm with an 18 mm socket. 4. Disconnect the tie rod end with a 21 m peen hammer or impact tool, hit the steering knuckle (not the tie rod) until the tie rod pops out. If you use a tie rod pickle fork, be careful not to cut the tie rod boot. A severed tie rod boot will allow dirt and moisture to damage the tie rod end. 5. Remove the upper ball joint nut with a 21 mm so impact tool or ball peen hammer and hit the steering knuckle until the upper control arm pops out.
6. Support the knuckle with a bungee cord or safety wire so not to overextend the CV axel or stretch the brake hydraulic hose. 7. Next remove the struts lower bolt. Using a 27 mm wrench, hold the nut and remove the bolt with a 30 mm socket. 8. Remove the strut assembly. 9. Place the strut extension on the top of the strut, hold the part up to start the nuts onto the factory studs. ** Caution: Use the factory nuts with the factory studs** 10. Run down nuts snug with end wrench. Torque to OEM specs. 11. Place strut back into upper strut mount. Tighten provided nuts snug with wrench or ratchet (after install, you will torque to OEM specs). 12. Use a pry bar to position the lower control arm and the strut mount to reinstall the mounting bolt. Torque to OEM specs. 13. Place a jack under the lower control arm. Raise the lower control arm to reattach the ball joint. A pry bar may be used to hold the upper control arm into position. Torque the ball joint nut to OEM specs. 14. Reattach the tie rod end. Torque to OEM specs. 15. Reattach the sway bar. Torque to OEM specs. 16. Reattach the wheel. Torque to OEM specs. 17. Repeat on opposite side. 18. Lower vehicle to ground and torque strut mounts to OEM specs. 19. Align the vehicle. A certified alignment technician that is experienced with lifted vehicles is recommended to perform the alignment

Related Content:

2000 ford ranger transmission bolt torque specs, torgue spec on 2004 mazda3, torque number sway bar ends 2002 lincoln ls, LOWER CONTROL ARMS TORQUE SPECS ON 2004 PACIFICA, lincoln ls 3 9l connecting rod bearing torque, idler arm torques, how many foot lbs torque on lower control arm bolt lincoln ls, ford e450 wheel torque, ford 4 0 sohc oil pan inserts torque specs, cummins N 14 rod torque

2001 Pontiac Sunfire L4-2.2L VIN 4 Cylinder Head Removal And Installation Manual

0

Filed Under (Pontiac Manuals) by admin on 11-06-2012

download
Cylinder Head Replacement * Tools Required * J28467-360 Engine Support Fixture * J36660-A Torque Angle Meter. Removal Procedure 1. Disconnect the negative battery cable. 2. Relieve the fuel system pressure. 3. Drain cooling system . 4. Remove the alternative fuel module assembly. Remove the drive belt . 5. Remove the air cleaner outlet duct and resonator assembly. 6. Support engine using floor jack and block of wood. 7. Remove the engine mount . 3. Remove the intake manifold . 9. Remove the exhaust manifold 10. Disconnect the Engine Coolant Temperature Sensor ( ECT ) electrical connection. 11. Remove the valve rocker arm cover. Important: When removing valve train components keep them in order. Do this to ensure that the components are installed in the same locations and with the same mating surfaces as when removed. 12. Remove the rocker arms and pushrods. 13. Remove the generator. 14. Remove the generator rear brace. 15. Remove the power steering pump. Position the pump aside with the lines attached. 16. Remove the radiator inlet pipe. 17. Remove the ignition coil assembly. 18. Remove the accessory bracket. 19. Disconnect the secondary ignition wires from the spark plugs . 20. Remove the cylinder head bolts. 21. Remove the cylinder head. 22. Clean the following components: * Head gasket surface * Valve rocker arm cover gasket surface * Threads Installation Procedure Important: Install the cylinder head gasket with the words THIS SIDE UP showing. Do not use sealer on the gasket. 1. Install the cylinder head gasket to the block. 2. Use a socket in order to push the cylinder head gasket over the rear dowel pin Important: Install the cylinder head gasket with the words THIS SIDE UP showing. Do not use sealer on the gasket. 1. Install the cylinder head gasket to the block. 2. Use a socket in order to push the cylinder head gasket over the rear dowel pin

Related Content:

01 sunfire head gasket, 2004 kia sorento head gasket, 02 Buick rendezvous head gasket install you tube, What all should be done to a Pontiac Montana when fixing a head gasket leak?, how to remove a kia 2 7 bakkie 2007 model air manifold gasket, how to replace saab 93 turbo head gasket, i changed the head gasket on my 2005 buick rendezvous now motor is shaking, installing 400 pontiac heads, labor time 2002 f150 head gaskets, pontiac 7k3 heads

2000 Dodge Dakota & Durango Power Windows ADJUSTMENTS

0

Filed Under (Dodge Manuals) by admin on 18-06-2012

download
ADJUSTMENTS WINDOWS Remove door trim panel. See DOOR TRIM PANEL under REMOVAL & INSTALLATION. Loosen bolts holding window to regulator. Raise window fully, seating window in frame. Tighten bolts. Install door trim panel. TROUBLE SHOOTING POWER WINDOWS On Dakota, inspect circuit breaker No. 20 (20-amp) in junction block. On Durango inspect circuit breaker No. 21 (25-amp) in junction block. On all models, junction block is located on left end of instrument panel. Inspect fuse No. 9 (40-amp on Dakota, 50-amp on Durango) in Power Distribution Center (PDC). PDC is located in left front corner of engine compartment. Inspect power window system ground circuit. See WIRING DIAGRAMS . SYSTEM TESTS ALL WINDOWS INOPERATIVE Dakota 1. Check circuit breaker for power window system. See TROUBLE SHOOTING . Replace circuit breaker as necessary. If circuit breaker is okay, go to next step. 2. Disconnect negative battery cable. Remove driver’s front power window switch. See POWER WINDOW SWITCH under REMOVAL & INSTALLATION. Check for continuity between ground and terminal No. 3 (Black wire) at driver power window switch wiring harness connector. If continuity exists, go to next step. If continuity does not exist, repair open in Black wire between driver power window 2000 Dodge Durango 2000 ACCESSORIES & EQUIPMENT’ ‘Power Windows – Dakota & Durango 2000 Dodge Durango 2000 ACCESSORIES & EQUIPMENT’ ‘Power Windows – Dakota & Durango switch connector and ground. See WIRING DIAGRAMS . 3. Connect negative battery cable. Turn ignition on. Measure voltage between ground and terminal No. 5 (Tan wire) at driver’s power window switch wiring harness connector. If battery voltage is present, check driver power window switch. See POWER WINDOW SWITCH under COMPONENT TESTS. If battery voltage is not present, repair open Tan wire between driver power window switch connector and ignition switch. See WIRING DIAGRAMS . See POWER DISTRIBUTION article in WIRING DIAGRAMS. Durango 1. Check circuit breaker for power window system. See TROUBLE SHOOTING . Replace circuit breaker as necessary. If circuit breaker is okay, go to next step. 2. Disconnect negative battery cable. Remove driver’s front power window switch. See POWER WINDOW SWITCH under REMOVAL & INSTALLATION. 3. Check for continuity between ground and terminal No. 5 (Black wire) at driver’s power window switch wiring harness connector. If continuity exists, go to next step. If continuity does not exist, repair open in Black wire between driver’s power window switch connector and ground. See WIRING DIAGRAMS . 4. Reconnect negative battery cable. Turn ignition on. Measure voltage between ground and terminal No. 4 (Tan wire) at driver’s power window switch wiring harness connector. If battery voltage is present, check driver’s power window switch. See POWER WINDOW SWITCH under COMPONENT TESTS. If battery voltage is not present, repair open Tan wire between driver power window switch connector and ignition switch. See WIRING DIAGRAMS . See POWER DISTRIBUTION article in WIRING DIAGRAMS. ONE WINDOW INOPERATIVE

Related Content:

1993 dakota 3 9 fuse diagram, lucas a127 wiring, free 1997 buick regal gs wiring diagrams, dodge durango 2002 suspension layout, abs and Anti Theft Passive 2000 mercury cougar, zimmatic pivot wiring, 1998 Dodge Dakota Service Manual, 2003 s10 airbag wiring diagram, 1996 silverado electrical manual, 97 buick riviera Ignition Switch Diagram

1996-2004 TOYOTA TACOMA FRONT LEVELING SYSTEM FOR THE 6-LUG SUSPENSION INSTALLATION INSTRUCTIONS

0

Filed Under (Toyota Manuals) by admin on 27-10-2011

download
Remove the nuts from the three upper strut mounting bolts with a 14 mm ratchet. Be sure to support the strut assembly as the nuts are removed to prevent it from falling. 96-04 Tacoma 11/07 5. Remove the strut assembly from the vehicle and mount it in a bench vise. Install the provided strut extension on the top of the strut assembly. ** Caution: Use the factory nuts with the factory studs** 6. Run down nuts snug with end wrench. Torque to OEM specs. NOTE: Because of the shape of the provided spacer the strut will be rotated 180° when reinstalled. 7. Place strut back into the upper strut mount. Tighten provided nuts snug with a 14mm wrench or ratchet (after install, you will torque to OEM specs). 8. Use a pry bar to position the lower control arm and the strut mount, and then reinstall the mounting bolt. Torque to OEM specs. HINT: It may be helpful to use a pry bar to press down on the steering knuckle for reinstalling the mounting bolt. 9. Place a jack under the lower control arm. Raise the lower control arm to reattach the lower ball joint bolts. Torque the ball joint nuts to OEM specs. 10. Repeat Steps 2 through 9 on the opposite side of the vehicle. 11. Reattach the wheels. Torque to OEM specs. 12. Lower vehicle to the ground and torque strut mounts to OEM specs. 13. Align the vehicle. A certified alignment technician that is experienced with lifted vehicles is recommended to perform the alignment

Related Content:

2013 TACOMA OEM SUBWOOFER, how to use oem ball joint press, OEM Ball Joint Press Instructions, 1996 Isuzu NPR Specs

1995 Ford Truck F 150 2WD Pickup New Cylinder Head Bolt Repair Manual

0

Filed Under (Ford Manuals) by admin on 20-02-2012

download
ORQUE SPECIFICATIONS FOR THE NON-FLANGED STANDARD HEX HEAD BOLTS, TIGHTEN IN TWO (2) STEPS AS FOLLOWS: 1. Tighten all bolts in sequence (Figure 2) to 75-88 N-m (55-65 lb.ft.). 2. Tighten all bolts in sequence (Figure 2) to 88-98 N-m (65-72 lb.ft.). FOR ALL TORQUE TO YIELD HEX HEAD BOLTS, TIGHTEN IN THREE (3) STEPS AS FOLLOWS: 1. Tighten all bolts in sequence (Figure 2) to 34-47 N-m (25-35 lb.ft.). 2. Tighten all bolts in sequence (Figure 2) to 61-75 N-m 45-55 lb.ft.). 3. Tighten all bolts in sequence (Figure 2) an additional 1/4 turn (85-95 degrees). NOTE: WHEN THE CYLINDER HEAD BOLTS HAVE BEEN TIGHTENED FOLLOWING THESE PROCEDURES, IT IS NOT NECESSARY TO RETIGHTEN THE BOLTS AFTER EXTENDED OPERATION. CAUTION: TORQUE-TO-YIELD CYLINDER HEAD BOLTS MUST BE REPLACED WITH NEW BOLTS. DO NOT REUSE TORQUE-TO-YIELD BOLTS. TORQUE-TO-YIELD BOLTS MAY ONLY BE USED ONE (1) TIME. PART NUMBER PART NAME F3ZZ-6065-E Cylinder Head Bolt

Related Content:

1999 2 5 ford ranger head bolt torque, D-17 manfold bolt torqe, ranger 1999 3 0 head torque diagram, torque angle specs 3100 1998 buick, torque sequence 300m 3 5 heads

1999 Ford Escort/ Tracer Cylinder Head Removal And Installation Manual

0

Filed Under (Ford Manuals) by admin on 24-04-2012

download
Removal 1. Disconnect the battery ground cable (14301). For additional information, refer to Section 414-01 . 2. WARNING: Fuel supply lines will remain pressurized for long periods of time after engine shut down. This pressure must be relieved before disconnecting any fuel lines or fuel system components. Relieve the fuel system pressure. For additional information, refer to Section 310-00 . 3. Remove the engine air cleaner outlet tube. For additional information, refer to Section 303-03 . 4. Remove the timing belt. For additional information, refer to Timing Drive Components—Timing Belt in this section. 5. Remove the vacuum hoses at the: * positive crankcase ventilation (PCV) valve (6A666). * throttle body (9E926). * intake manifold (9424). * fuel pressure sensor. 6. Disconnect the fuel charging wiring (9D930) electrical connectors at main engine connector. 7. Disconnect the crankshaft position (CKP) sensor electrical connector. 8. Disconnect the fuel line. For additional information, refer to Section 303-04 . 9. Remove the power steering pump (3A674) and bracket as an assembly. For additional information, refer to Section 211-02 . 10. Remove the generator (GEN). For additional information, refer to Section 414-02 . 11. Remove the oil level indicator tube (6754). For additional information, refer to Oil Level Indicator and Tube in this section. 12. Disconnect the heater hoses. For additional information, refer to Section 412-02 . 13. Lower the vehicle. 14. Disconnect the upper radiator hose (8260) from the thermostat housing water hose connection. For additional information, refer to Section 303-03 . 15. Remove the camshafts (6250). For additional information, refer to Camshaft in this section. 16. Remove the ignition coil (12029) and bracket. For additional information, refer to Section 303-07 . 17. Remove the water thermostat housing. For additional information, refer to Section 303-03 . 18. Disconnect the knock sensor electrical connector. 19. Remove the generator bracket-to-cylinder head bolt. 20. Remove the bolts and the cylinder head (6049). 21. Remove the cylinder head gasket and discard. Installation WARNING: Do not smoke or carry lighted tobacco or open flame of any type when working on or near any fuel related components. Highly flammable mixtures are always present and may be ignited, resulting in possible personal injury. 1. CAUTION: Do not use abrasive grinding discs to remove gasket material; use only plastic manual scrapers. Do not scratch or gouge the aluminum sealing surfaces. Clean all gasket material from the mating surfaces on the cylinder head and cylinder block. Clean out the bolt holes in the cylinder block. Inspect the cylinder head for flatness. For additional information, refer to Section 303-00 . 2. Install a new head gasket on the cylinder block. 3. CAUTION: Do not attempt to install the cylinder head assembly without assistance. Installation of the cylinder head assembly requires two people or possible injury may occur. CAUTION: The bolts are torque-to-yield and must be replaced or engine damage may occur. Tighten the bolts in three stages in the sequence shown. * Stage 1: Tighten the bolts to 15-25 Nm (12-18 lb-ft). * Stage 2: Tighten the bolts to 35-45 Nm (26-33 lb-ft). * Stage 3: Tighten the bolts an additional 105 degrees. 4. Install the generator bracket-to-cylinder head bolt. * Tighten to 20 Nm (15 lb-ft). 5. Connect the knock sensor electrical connector. 6. Install the thermostat housing. For additional information, refer to Section 303-03 . 7. Install the ignition coil and bracket. For additional information, refer to Section 303-07 . 8. Install the camshafts. For additional information, refer to Camshaft in this section. 9. Connect the upper radiator hose. For additional information, refer to Section 303-03 . 10. Raise and support the vehicle. For additional information, refer to Section 100-02 . 11. Install the heater hoses. For additional information, refer to Section 412-02 . 12. Install the generator and bracket assembly. For additional information, refer to Section 414-02 . 13. Install the power steering pump and bracket assembly. For additional information, refer to Section 211-02 . 14. Connect the fuel lines. For additional information, refer to Section 310-00 . 15. Connect the crankshaft sensor electrical connector.

Related Content:

fleetwood sedona manuals, Honda Civic 2003 number #3 Cylinder pattern, 2001 mitsubishi 3 0 cylinder torque specs, Workshop Manual (WSM) Section 303-04, 4 8 head bolt tightening sequence, workshop information system saab, where is the knock sensor on a 2006 toyota tundra 4 7 v-8 truck, trailblazer front frame section, throttle postioning system in ford five hundred, pdf Ford manual Section 501-02

2000-2004 Toyota Tundra 4.7L V-8 Two and Four Wheel Drive Installation Manual

0

Filed Under (Toyota Manuals) by admin on 27-03-2012

download
1. Place vehicle in a location where the floor is solid and flat, with adequate lighting. Do not attempt to work on a hot engine. Heat causes metal to expand and makes removal of fasteners difficult at best. Disconnect the battery cables from the battery. Raise the front of the vehicle to obtain adequate access to the bottom exhaust manifold flanges. Use large-base jack stands to support the vehicle. Do not rely on the jack! Block the tires to prevent the vehicle from rolling off the jack stands. 2. Spray WD-40 or some type of penetrating oil on all accessible fasteners and fittings before attempting to remove them. 3. From underneath the vehicle disconnect the exhaust system from the exhaust manifolds by unbolting the (3) bolts at the collectors. Then unbolt the driver side catalytic converter from the exhaust assembly and temporarily remove it from the vehicle. PASSENGER SIDE 4. On the passenger side remove the (4) bolts attaching the heat shields to the factory manifold. 5. Next, carefully unplug the O2 sensor from its harness. 6. Now remove the nuts attaching the factory manifold to the cylinder head. With the manifold out of the way remove the mounting studs from the cylinder head. 7. Using a small wire brush or similar instrument, clean any carbon deposits left on the head surface. Be careful not to gouge the aluminum head. 8. Transfer the O 2 sensor from the factory manifold to the new passenger side header. Apply a small amount of anti seize to the threads for the sensor before installing it in the new header. Use caution not to drop or damage the sensor, they are fragile. 9. Now you are going to install the new JBA Header, but first there is some preparation of the hardware required. Apply anti seize to the threads of the new fasteners. Install the new JBA Header using the supplied gasket and fasteners. Torque to 23 ft./lbs. DRIVER’S SIDE 10. Just like you did in step (4) remove the (4) bolts attaching the heat shields to the driver side factory mani- fold. 11. Next, carefully unplug the O2 sensor from its harness. Unbolt the dipstick bracket from the head and remove the dipstick tube. 12. Remove the nuts attaching the factory manifold to the cylinder head. With the manifold out of the way remove the mounting studs from the cylinder head. 13. Using a small wire brush or similar instrument, clean any carbon deposits left on the head surface. Be careful not to gouge the aluminum head. 14. Transfer the O 2 sensor from the factory manifold to the new driver side header. Apply a small amount of anti seize to the threads for the sensor before installing it in the new header. Use caution not to drop or damage the sensor, they are fragile. 15. As you did on the passenger side, prepare the hardware before installing the driver side header. Apply anti seize to the threads of the new fasteners. Install the new JBA Header using the supplied gasket and fasteners. Torque to 23 ft./lbs. Re-install the dipstick tube. 16. Install the driver side catalytic converter. 17. Connect the exhaust system to the new headers using hardware and gaskets supplied. Reconnect O2 sensors. 18. Check to insure adequate clearance between header and shifter cable (small cable that runs from firewall, to brace on fender well, to transmission) . More clearance can be gained by adjusting (bending) brace on fender well. 19. Recheck everything

Related Content:

2004 honda civic head bolt torque, 4y toyota head torque

2003 Chevrolet Impala LS MULTIFUNCTION TURN SIGNAL SWITCH REPLACEMENT

0

Filed Under (Chevrolet Manuals) by admin on 06-01-2012

download
1. Disable the SIR system. Refer to SIR Disabling and Enabling Zone 3 in SIR. 2. Remove the upper and lower trim covers. Refer to Steering Column Trim Covers Replacement . 3. Remove the wire harness assembly (1) from the wire harness strap (2). 4. Disconnect the turn signal and multifunction switch assembly connector from the SIR system coil connector. 5. Slide the 2 connectors (2) of the turn signal and multifunction switch assembly out of the bulkhead connector (1) 6. Remove the 2 pan head tapping screws (1) and (3) from the turn signal and multifunction switch assembly (2). 7. Remove the turn signal and multifunction switch assembly (2) from the steering column tilt head assembly. 1. Install the turn signal and multifunction switch assembly (2) onto the steering column tilt head assembly. 2. Screw the 2 pan head tapping screws (1) and (3) into the turn signal and multifunction assembly (2). Tighten * Tighten the top pan head tapping screw (1) to 3 N.m (27 lb in). * Tighten the side pan head tapping screw (3) to 7 N.m (62 lb in).

Related Content:

how to adjust the directional switch on an implala 1962, 00 impala turnsignal problems, 1962 impala blinker switch, 2006 impala haynes repair manual, 62 corvette turn signal adjustment, haynes repair manual 2007 chevrolet impala pdf, turn flasher internal wiring

EGO DASH TS Bluetooth Hands-Free Car Kit Installation Guide

0

Filed Under (Toyota Manuals) by admin on 03-04-2012

download
EGOCorp USA 8820 Kenamar Drive, Ste. 506 San Diego, CA 92121 Page 1 ofon should 2 Version 1.3 Phone +1 (858) 566-2159 Fax +1 (858) 566-2179 www.egocorpusa.com EGO DASH TS Bluetooth Hands-Free Car Kit Installation Guide WARNING: We recommend disconnecting the vehicles battery prior to the installation. The installatibe only performed by professional installers. Improper installation may void the vehicles and EGO DASH TS warranty. EGO DASH TS Installation Steps 1. Remove head unit (Consult with owner’s and shop manual) 2. Disconnect factory wiring harness from head unit 3. Connect EGO DASH TS Wiring Harness to the head unit Wiring Harness A Locate
amplifier (Most Lexus ? behind glove box; Toyota Land Cruiser ? under drivers or passengers seat). Connect male and female 16-pin connectors between amplifier and the vehicle’s wiring harness. Connect Yellow Mute wire: Lexus ? pin 7 on the 18-pin connector; Land Cruiser ? pin 3 on the 25-pin connector (amplifier). Connect Blue Ignition wire (male bullet connector): Lexus ? pin 16 on the 16-pin connector (female bullet connector); Land Cruiser ? pin 20 on the 25-pin connector (amplifier). Wiring Harness B The normal location of the mute is pin 4 (x) on the 6-pin connector. However, on some rare factory head units, the mute pin might be pin 5. The mute pin on the head unit should show ~ 5 volts when the head unit is turned on. Wiring Harness C Connect the male and female ISO connectors, if they are not already connected. Splice the gray wires (only!) into the loudspeaker wiring, going from the amplifier to the center or door loudspeaker. The 2 female bullet connectors go to the loudspeaker. The 2 male bullet connectors go to the amplifier. The 4 white wires are not used! Connect the yellow mute (“Mute Signal”) cable (male bullet connector) on the ISO Harness coming from the EGO DASH TS brain to “Mute 2″ (white cable – female bullet connector), if not already connected. Wiring Harness D Please contact EGO Technical Support at (858) 566-2170 (9AM-5PM PST) or support@egohandsfree.com . 4. Connect EGO DASH TS Wiring Harness to the vehicle’s wiring harness (One or more of the connectors might be not used, depending on the vehicle’s configuration) 5. Connect the EGO DASH TS Wiring Harness to the EGO DASH TS control box (16pin Molex) 6. Install the EGO DASH TS switch insert into the desired location (knockout) 7. Connect the EGO DASH TS switch with the EGO DASH TS box (Use the included extension cable if necessary) 8. Install the EGO Microphone into the desired location (e.g. the rear view mirror. DO NOT install the microphone on or near vehicles’ safety systems, like the airbag) 9. Test the EGO DASH TS: a. Reconnect the battery and turn on the ignition of the vehicle b. Pair a Bluetooth mobile phone with the EGO DASH TS (Pin code: “0000″) c. Turn on the head unit and select a radio station; Make sure you can hear the radio through the cars’ speakers; Adjust audio volume if necessary

Related Content:

1983 monte carlo window wiring, 2005 ford ficm connector view, 3406e 1lw 40 pin wire, elect repair for cadillac dashboard replacement, kia besta wiring diagram, PIN DATA 2005 скачать, vp44 9 pin connector, what pins are positve and negative on a 40 pin cat ecm

Related Content:

2007 kia optima harmonic balancer bolt torque, volvo d13 flywheel torque spec, torque specs for 5 7 volvo penta exhaust manifold, torque specs 4 8 chevrolet, rod torque botyom end n14, ax4n pan bolt torque spec, 2006 chrysler 300 rocker torque specs 2 7, lug nut torque on isuzi, 2001 buick lesabre strut torque, cummins n14 torque specs