Skip to content

how to overhaul 5r55e transmission

You search PDF repair manual about how to overhaul 5r55e transmission, if there are search results will appear below. If search results do not exist, please search by others keyword.

1999 FORD EXPLORER/ RANGER TRANSMISSION-4R44E OR 5R55E-SLIPPING SHIFT/ DELAYED OR NO ENGAGEMENT REPAIR MANUAL

download
SERVICE PROCEDURE F87Z-7A100-DB Main Control (4.0L EI Explorer) F87Z-7A100-EB Main Control (4.0L SOHC Explorer) 1. Perform normal diagnosis for this concern. XL2Z-7L491-AA Bracket XL2Z-7G383-AA Electronic Pressure Control (EPC) 2. Perform Line Pressure Tests as listed in the Solenoid 1999 Explorer/Mountaineer, Ranger Workshop Manual. OTHER APPLICABLE ARTICLES: NONE WARRANTY STATUS: Eligible Under The 3. If pressures are low, perform Pinpoint Test for Provisions Of Bumper To the EPC solenoid. Bumper Warranty Coverage And Emissions Warranty 4. Inspect the bracket that attaches the Torque Coverage Converter Clutch (TCC), Shift Solenoid B OPERATION DESCRIPTION TIME (SSB), Shift Solenoid D/Coast Clutch Solenoid 991610A Replace Electronic 1.2 Hrs. (SSD/CCS), and EPC solenoids to the main Pressure Control (EPC) control for damage. If the bracket is damaged, Solenoid And Clean Main replace both the bracket and solenoid. Control (Includes Time For 5. If the bracket is not damaged, inspect the Road Test) – 4R44E Or solenoid for the affected date code (refer to the 5R55E following Manufacturing Date Code Chart) and 991610B For Line Pressure And ID marking (Figure 1, Views 1, 2, and 3). If the Pinpoint Tests, Use “A” solenoid is one of the affected, replace it. Time As Outlined In The Warranty And Policy MANUFACTURING DATE CODE Manual Date Code Month/Year DEALER CODING 868xx August 1998 CONDITION 869xx September 1998 BASIC PART NO. CODE 870xx October 1998 7G383 01 871xx November 1998 OASIS CODES: 501000, 502000, 50300

2002 Land Rover Freelander (LN) V6-2.5L Automatic Transmission/Transaxle Service and Repair Manual

download
Automatic Transmission/Transaxle: Service and Repair Gearbox – KV6 – NAS Models JATCO Gearbox – KV6 – NAS models Remove 1. Position the vehicle on a twin-post lift. 2. Tie bonnet back in upright position. 3. Disconnect battery earth lead. 4. Remove engine acoustic cover. 5. Release HO2S multiplug from support bracket on LH camshaft cover, disconnect multiplug. 6. Raise vehicle on lift. 7. Remove rear beam. 8. Remove RH catalytic converter 2002 Land Rover Freelander (LN) V6-2.5L Copyright © 2010, ALLDATA 10.20 Page 3 12. Remove bolt securing front pipe to bracket and remove front pipe. Discard gasket. 13. Remove 3 screws securing LH splash shield and remove shield 14. Release HO2S lead from clip on cylinder block. Remove 4 nuts securing exhaust manifold to cylinder head, remove manifold and discard gasket. 15. Drain fluid from IRD. 16. Drain gearbox fluid. 17. FitLRT-54-026 to the RH drive shaft inboard joint. 18. Using a suitable lever, release drive shaft from IRD. 19. With assistance, pull hub outwards and release drive shaft from IRD. CAUTION: Care must be taken not to damage oil seal when removing drive shaft from IRD. CAUTION: To avoid damage to gaiter or joint, do not allow shaft to hang on joint. 20. Remove LRT-54-026 from RH drive shaft inboard joint.

4T65E Transmission 1-2 Shift Shudder at Light to Moderate Acceleration (Replace Complete Second Clutch Assembly)

download
2001-2004 Buick Regal 2001-2005 Buick Century, LeSabre 2002-2007 Buick Rendezvous 2005-2007 Buick Terraza, LaCrosse, Allure (Canada Only) 2006-2007 Buick Lucerne 2001-2005 Chevrolet Venture 2001-2007 Chevrolet Impala, Monte Carlo 2005-2007 Chevrolet Uplander 2006-2007 Chevrolet Malibu SS, Malibu Maxx SS 2001-2002 Oldsmobile Intrigue 2001-2003 Oldsmobile Aurora 2001-2004 Oldsmobile Silhouette 2001-2005 Pontiac Aztek, Bonneville, Montana 2001-2007 Pontiac Grand Prix 2005-2007 Pontiac Montana SV6 2006-2007 Pontiac G6 GTP 2005-2007 Saturn Relay with 4T65E Automatic Transmission this service kit contains: Second Clutch Housing Fluid Seal Rings (613), a Second Clutch Assembly (617), a Case Cover (Channel Plate) Upper Gasket (430), and a Case Cover (Channel Plate) Lower Gasket (429). In addition to the content of this service kit, four other gaskets not included in this service kit will also be needed to complete the repair, a Control Valve Body Cover (Side Cover) Gasket (54), a Control Valve Body Cover (Side Cover) Inner Gasket (59), a Case Cover Lower Gasket (429), and a Case Cover Upper Gasket (430). These gaskets can be obtained by ordering service kit P/Ns 24206959 and 24206391. Be sure to use ONLY the Second Clutch Assembly and Second Clutch Housing Fluid Seal Rings provided in this service kit. DISCARD the Second Clutch Assembly and Second Clutch Housing Fluid Seal Rings removed from the transmission being serviced. Disassemble ONLY the Oil Pump Assembly from the Case Cover (Complete). DO NOT disassemble the Control Valve Body from the Case Cover. Remove ONLY the Case Cover-to- Case bolts to remove the Case Cover and Valve Body from Transmission Case AS AN ASSEMBLY . To access all Case Cover-to-Case bolts, it is necessary to remove the Pressure Control Solenoid Valve Assembly (322), and 1-2 & 3-4 Shift Solenoid Valve Assemblies (315A, 315B).

1999 Mercury Sable V6-3.0L DOHC A/ T-Cooler Flushing Service Manual

download
SERVICE PROCEDURE Prior methods of cooler flushing have not obtained the level of cooler cleaning and contaminant removal that is required to prevent repeat repairs. The “Turbo-Tank Heated Cooler Line Flusher” uses heated Automatic Transmission Fluid ( ATF ) and a pulsating action to loosen system contamination. Previous equipment used solvents to clean & flush coolers, lines and torque- converters. There are 2 issues with this method: Aerosol Solvents should never be used for several reasons. NOTE YOU MUST IDENTIFY THE RETURN COOLER LINE TO START THE BACK FLUSHING PROCEDURE. A quick way to identify the return cooler line (fluid coming out of the cooler and returning to the transmission) is to locate the return cooler line fitting on the transmission case . Refer to the following lists: Rear Wheel Drive ^Residual solvent contamination can cause damage to friction bonding materials within the transmission (Clutches and Bands). ^Lack of fluid heating and agitation prevents this method from completely removing contamination from lines, in-radiator coolers and auxiliary coolers. ^They do not provide the volume necessary to remove heavy contaminants. ^They evaporate quickly and essentially leave contaminants in pockets, bends, or wherever they are as the solvent dries. ^TORQSHIFT, 4R100, E40D, C6 – The REAR transmission case filling receives the return line. ^4R70W, AODE, AOD – The TOP transmission case filling receives the return line. ^A4LD, 4R44/55E, 5R55E, 5R55N, 5R55W, 5R55S The TOP transmission case filling receives the return line. ^CD4E – The REAR or Pump End transaxle case fitting receives the return line. ^4F27E – The REAR or Cover End transaxle case fitting receives the return line. ^AXOD, AXODE, AX4S, AX4N, 4F50N – The BOTTOM transaxle cooler line fitting receives the return line. 1. Check and top off fluid level of the “Turbo-Tank Heated Cooler Line Flusher” tank with transmission fluid. 2. Allow the fluid in the flusher 15-30 minutes to heat up to 140°F (60°C) before using. 3. Install line adapters into the transmission cooler lines. 4. Attach the flusher’s blue line to the transmission return cooler line quick disconnect. 5. Attach the flusher’s red line to the transmission outlet cooler line quick disconnect. a. Follow equipment instructions, to purge cooler lines and cooler prior to starting flushing procedure (using factory installed purge valve and clear hose on “Turbo-Tank Heated Cooler Line Flusher”). 6. Allow the cooling system to back-flush for 10-15 minutes, then flush the cooler in a forward/normal flow direction for an additional 10-15 minutes

Ford 455C 555C 655C Tractor Loader Backhoe Service Manual

download
Engine Systems Chapter 1 3-Cylinder Diesel Engine 3-Cylinder Diesel Engine – Description and Operation 3-Cylinder Diesel Engine – Overhaul Chapter 2 4-Cylinder Diesel Engine 4-Cylinder Diesel Engine – Description and Operation 4-Cylinder Diesel Engine – Overhaul Chapter 3 Cooling System Cooling System – 3-Cylinder Engine Description and Operation Cooling System – 4-Cylinder Engine Description and Operation Cooling System – Overhaul Chapter 4 Troubleshooting, Specifications and Special Tools Troubleshooting Specifications Special Tools Part 2 Fuel Systems Chapter 1 Fuel System – General Fuel System – Description and Operation Fuel System – Adjustments DPA Distributor Type Fuel Injection Pump Fuel System – Adjustments DPS Distributor Type Fuel Injection Pump Fuel System – Fuel Tanks, Filters and Fuel Lines Overhaul Chapter 2 Fuel Injection Pump – DPA Distributor Type Fuel Injection Pomp – Description and Operation Fuel Injection Pump – Overhaul Fuel Injection Pump – ISO Test Conditions Fuel Injection Pump – Test Procedures Chapter 3 Fuel Injection Pump – DPS Distributor Type Fuel Injection Pump – Description and Operation Fuel Injection Pump – Overhaul Fuel Injection Pump – ISO Test Conditions Fuel Injection Pump – Test Procedure Chapter 4 Injectors Ford 455C Injectors – Description and Operation Injectors – Overhaul Chapter 5 Injectors Ford 555C and 655C Injectors – Description and Operation Injectors – Overhaul Chapter 6 Air Cleaners Dry Type Air Cleaner – Description and Operation Dry Type Air Cleaner – Overhaul Chapter 7 Turbocharger Turbocharger – Description and Operation Turbocharger – Overhaul Chapter 8 Troubleshooting, Specifications, Test Plans and Special Tools Troubleshooting – Diesel Engines Troubleshooting – Turbocharger Specifications Special Tools Test Plans Part 3 Electrical System Chapter 1 Wiring, Lights and Controls Wiring, Lights and Controls – Description and Operation Wiring, Lights and Controls – Fault Finding and Repair Circuit Diagrams and Wiring Harness Chapter 2 Battery
Battery – Description and Operation Battery – Maintenance and Tests Chapter 3 Starting System Starting System – Description and Operation Starting Motor – Overhaul Chapter 4 Charging System – A127 55 Amp Alternator with Integral Regulator Charging System – A127 55 Amp Alternator with Integral Regulator – Description and Operation Charging System – A127 55 Amp Alternator with Integral Regulator – Service Precautions, Preliminary Checks, Initial Tests and Alternator Component Tests Charging System – A127 55 Amp Alternator with Integral Regulator – Overhaul Chapter 5 Troubleshooting, Specifications and Special Tools Troubleshooting Specifications Special Tools Part 4 Power Reversing Transmission Chapter 1 4×4 Fully Synchronized Power Reversing Transmission Power Reversing Transmission – Description and Operation Introduction to Overhauling the Transmission Gear Shift Lever, Modulator Unit and Solenoid Control Valve – Overhaul Front End Overhaul Complete Overhaul Component Overhaul Chapter 2 8X8 Fully Synchronized Power Reversing Transmission Power Reversing Transmission – Description and Operation Introduction to Overhauling the Transmission Gear Shift Lever, Modulator Unit, Lockup Valves and Solenoid Control Valve – Overhaul Front End Overhaul Complete Overhaul Component Overhaul