Skip to content

how to remove lifters in 4 2l trailblazer

You search PDF repair manual about how to remove lifters in 4 2l trailblazer, if there are search results will appear below. If search results do not exist, please search by others keyword.

2004 Chevrolet TrailBlazer Noise Coming From Instrument Panel Cluster (Replace Instrument Panel Cluster (IPC)) Repair Manual

download
This bulletin is being revised to add model years and provide important repair information. Please discard Corporate Bulletin Number 04-08-49-015 (Section 08 — Body and Accessories). Condition Some customers may comment on a noise coming from the instrument panel cluster (IPC) while driving or on initial start-up. Instrument clusters may contain stepper motor gages that can make noise during the following conditions: Subject: Noise Coming From Instrument Panel Cluster (Replace Instrument Panel Cluster (IPC)) Models: 2003-2005 Buick LeSabre 2003-2007 Buick Rendezvous 2004-2005 Buick Rainier 2003-2006 Cadillac Escalade, Escalade ESV, Escalade EXT 2003-2005 Chevrolet Cavalier, Impala, Monte Carlo 2003-2006 Chevrolet Avalanche, Suburban, Tahoe, TrailBlazer EXT 2003-2007 Chevrolet Silverado Classic, TrailBlazer 2003-2007 Chevrolet Kodiak Models 2004-2006 Chevrolet SSR 2003-2006 GMC Envoy XL, Yukon, Yukon XL 2004-2005 GMC Envoy XUV 2004-2007 GMC Envoy 2003-2007 GMC Sierra Classic 2003-2004 Oldsmobile Bravada 2003-2005 Pontiac Aztek, Bonneville, Sunfire 2003-2005 HUMMER H2 Attention: Appropriate repair is based on vehicle build date. Use GMVIS to determine the vehicle build date. • Initial startup (gages zero/reset)

4L60-E Automatic Transmission/Torque Converter Clutch (TCC) Shudder, Water in Transmission (Repair Transmission and Replace Transmission Filler Tube, Level Indicator and Seal)4L60-E Automatic Transmission/Torque Converter Clutch (TCC) Shudder, Water in Transmission (Repair Transmission and Replace Transmission Filler Tube, Level Indicator and Seal) Transmission Repair

download
Transmission Repair 1. Remove the transmission. Refer to the appropriate SI procedure. 2. Disassemble and inspect the transmission. Refer to Unit Repair Automatic Transmission – 4L60-E/4L65-E. Important: Subject: 4L60-E Automatic Transmission/Torque Converter Clutch (TCC) Shudder, Water in Transmission (Repair Transmission and Replace Transmission Filler Tube, Level Indicator and Seal) Models: 2004-2005 Buick Rainier 2003-2005 Chevrolet TrailBlazer Models 2003-2005 GMC Envoy Models 2003-2004 Oldsmobile Bravada 2005 Saab 9-7X with 4.2L In-Line 6 Cylinder Engine (VIN S — RPO LL8) • Visible rust on the transmission fluid level indicator. • Visible water in the oil pan. • A milky white substance inside the pan area. • Spacer plate gaskets that appear to be glued to the spacer plate, valve body or case. • Rust on internal transmission iron/steel components. • Remove the surge tank cap and examine the coolant for signs of contamination with transmission fluid (the coolant will have a milky, not clear appearance). • If the coolant has a normal, clear appearance, the radiator should not be replaced. • The cooler can also be tested by following the Coolant System Leak Test procedure (SI Document ID# 877442). Do NOT replace a radiator without verifying that the transmission oil cooler is leaking. If water or coolant is found in the transmission, the following components MUST be replaced. Replace the Transmission Fluid Filler Tube, Seal and Fluid Level Indicator WITH the transmission REMOVED from vehicle. 1. Remove the transmission fluid filler tube from the transmission. 2. Replace the transmission fill tube seal, P/N 1259475. 3. Replace the transmission fill tube, P/N 15000220, following the appropriate SI Document for Transmission Installation. 4. Replace the transmission fluid level indicator, P/N 15069769 when appropriate during the transmission installation. Replace the Transmission Fluid Filler Tube, Seal and Fluid Level Indicator with the transmission in the vehicle. 1. Remove the air cleaner outlet duct. Refer to Air Cleaner Element Replacement (SI Document ID# 1364496). 2. Remove the transmission fluid level indicator from the filler tube. 3. Remove the filler tube nut (2) located on the right side of the engine. 4. Remove the filler tube from the vehicle. Tip It is necessary to remove the two A/C line (suction line / low side of muffler hose) retainers and reposition • Replace all of the rubber type seals. • Replace all of the composition-faced clutch plate assemblies including the band. • Replace all of the nylon parts (Thrust Washers). • Replace the torque converter. • Thoroughly clean and rebuild the transmission, using new gaskets and oil filter. • Flush and flow check the transmission oil cooler using J 45096. Refer to Corporate Bulletin Number 02-07-30- 052C or newer – Automatic Transmission Oil Cooler Flush and Flow Test Essential Tool J 45096 TransFlow .
the A/C line to allow proper clearance for installation of the new transmission fluid fill tube. 5. Remove the A/C line at the oil level indicator tube bracket nut. 6. Remove the A/C bracket bolt from the engine lift hook. 7. Reposition the A/C line upward. 8. Install the new transmission filler tube, P/N 15000220, into position but NOT into the transmission at this time. 9. Raise the vehicle. Refer to Lifting and Jacking the Vehicle in General Information (SI Document ID# 744862). 10. Remove the two bolts securing the transmission heat shield to the transmission. 11. Remove the transmission heat shield from the transmission. 12. Remove the old filler tube seal from the transmission case. 13. Install a new seal, P/N 1259475 into the transmission case. 14. Position the new transmission filler tube into the transmission seal. 15. Install the transmission heat shield to the transmission. 16. Install the two bolts securing the transmission heat shield to the transmission. Tighten Tighten the bolts to 17 N·m (13 lb ft). 17. Lower the vehicle. 18. Install the nut securing the filler tube to the stud. Tighten Tighten the nut to 10 N·m (89 lb in). 19. Reposition the A/C line into place. 20. Install the A/C line bracket to the oil level indicator tube stud and secure the bracket with the nut. 21. Install the A/C line bracket to the engine lift bracket and secure the A/C bracket with the bolt

Ford V8 Engines Performer RPM Hydraulic Roller Camshaft INSTALLATION INSTRUCTIONS

download
Disconnect the battery. 2. Drain radiator coolant. Drain plug will normally be located on lower right or left side of the radiator facing the engine. 3. Remove radiator and air conditioning condenser if so equipped. In some cases, the front grill may have to be removed. Measure distance from front cover to grill or brackets that may interfere with camshaft against the length of the camshaft. 4. Remove the gas cap to relieve pressure. Disconnect fuel line and plug. Replace gas cap. 5. Disconnect all linkage from carburetor such as throttle, throttle springs, transmission, cruise control and automatic choke. 6. Tag and remove coil wires and sensor wires. 7. Tag and remove vacuum lines. 8. Remove valve covers. 9. Remove distributor cap and wires, rotate engine until rotor points towards number 1 terminal in cap and pointer on front cover is on top dead center (TDC) and remove distributor. (see Fig. 1) Note: Mark the approximate position of the distributor housing in relation to the manifold to assist in getting the distributor properly located during re-installation. 10. Remove carburetor and intake manifold. Remove and discard intake manifold gasket. 11. Remove rocker arms and pushrods. CAUTION: If your engine has non-adjustable rocker arms (1969-1/2 or later), you must install screw-in studs and high performance •VALVE SPRINGS CAUTION: WARNINGS ABOUT YOUR WARRANTY In order for this Performer RPM roller cam to be covered under ANY WARRANTY, you MUST use the correct Valve Springs. Failure to install the correct valve springs may cause lifters not to follow the cam lobes and damage engine parts. This camshaft is designed to function with valve springs that have a closed pressure of 110 lbs, open pressure of 320 lbs and a lift of .575″. Special H.P. retainers may be necessary with your installation for proper spring height. Do not use rotator type valve springs or retainers for this application. Note: Edelbrock Sure Seat Valve Springs #5762 are not recommended.  IMPORTANT NOTES AFFECTING YOUR WARRANTY CAM LOBE DAMAGE – Cam lobe wear is almost non-existent unless mismatched parts are used or installation of the cam and lifters is done improperly. Cam damage can result from the timing gear loosening due to improper torque on bolts. Bolts holding gear to camshaft should be torqued carefully and a locking compound applied to threads of bolts. Before installing your new Performer-RPM roller camshaft, check the gear drive on the distributor and oil pump for any signs of wear. If worn, be sure to replace with a new gear or you may wear out your camshaft prematurely. High-pressure oil pumps are not recommended with Performer RPM roller camshafts. Edelbrock camshafts are designed to use with Edelbrock timing chains.  CAM GEARS AND CAMSHAFT END PLAY- If cam gear becomes loose, the cam will slide back in the block, causing the lifters to hit the lobes next to them and also the cam bearing journals. If the engine is run after this happens, the bottom of the lifters and the sides of the lobes will become damaged. See Installation Instructions section for end play specifications.  LIFTERS Edelbrock offers a retrofit roller lifter kit for engines not originally equipped with roller lifters. Use part #97453. To install your roller lifters, use fresh clean oil on the lifter and the lifter bore just prior to installing. The guide bar (high side of tappet) must face the opposite side of block. See roller lifter instructions for additional information. ( Note: 289-302 engines require removal of the cylinder heads to provide enough clearance to install roller lifters, which are taller than standard hydraulic lifters.)  PUSHRODS AND ROCKER ARMS High performance pushrods, roller rocker arms and rocker studs are recommended for this installation. After the cam is installed and timed correctly (see Figure 2), it will be necessary to check each pushrod for correct lifter preload. INSTALLATION INSTRUCTIONS 1. Check lifters as covered in Lifters section. Coat cam lobes with fresh clean oil. Lube distributor drive of cam with assembly lube (supplied). 2. Install new camshaft. Re-install thrust plate with new sprockets and timing chain with timing marks lined up as recommended by factory specifications (See Figure 2). Reinstall the fuel pump eccentric before installing sprocket bolt and washer

1994 Toyota Paseo ENGINE IDENTIFICATION/ VALVE CLEARANCE ADJUSTMENT

download
1) Disconnect PCV hose, necessary electrical connections and spark plug wires to access valve cover. Remove nuts, seal washers, valve cover and gasket. 2) Rotate crankshaft clockwise so cylinder No. 1 is at TDC on compression stroke. Cylinder No. 1 is front cylinder at timing belt end of engine. Ensure timing mark on crankshaft pulley aligns with “0″ mark on timing belt cover. 3) Ensure valve lifters on cylinder No. 1 are loose and valve lifters on cylinder No. 4 are tight. If conditions are not as described, rotate crankshaft clockwise one complete revolution (360 degrees). 4) Using feeler gauge, measure valve clearance between valve lifter and camshaft on intake valves of cylinders No. 1 and 2, and exhaust valves of cylinders No. 1 and 3. Record valve clearance. Rotate crankshaft clockwise one complete revolution (360 degrees). 5) Measure and record valve clearance on intake valves of cylinders No. 3 and 4, and exhaust valves of cylinders No. 2 and 4. Ensure valve clearance is within specification. See VALVE CLEARANCE SPECIFICATIONS table. VALVE CLEARANCE SPECIFICATIONS TABLE (1) Application In. (mm) Exhaust Valve ………….. .012-.016 (.31-.41) Intake Valve …………… .006-.010 (.15-.25) (1) – Adjust valve clearance with engine cold. 6) If valve clearance requires adjustment, rotate camshaft so lobe on valve to be adjusted is facing upward, away from valve lifter. Position notch area on valve lifter toward inside of cylinder head. DO NOT align notch area with camshaft. Use Valve Clearance Adjuster (SST 09248-55040) to adjust valve clearance. 7) Using SST “A” of valve clearance adjuster, push downward on valve lifter. Place SST “B” between camshaft and valve lifter. See Fig. 2. Ensure enough clearance exists for adjusting shim removal. Remove SST “A”. Fig. 2: Adjusting Valve Clearance Courtesy of Toyota Motor Sales, U.S.A., Inc. 8) Using small screwdriver and magnet, remove adjusting shim. Measure and record thickness of removed shim. Using measured clearance and adjusting shim thickness, select proper replacement adjusting shim. See Figs. 4 and 5. 9) Install replacement adjusting shim. Recheck valve clearance. Apply sealant at indicated valve cover sealing areas on cylinder head. See Fig. 3. 10) Using NEW gasket, install valve cover and sealing washers. Install and tighten nuts to specification. See TORQUE SPECIFICATIONS. To install remaining components, reverse removal procedure. NEW SHIM THICKNESS TAB

1998-2000 HONDA Accord L4 Replace the fuel pressure regulator, and reroute the fuel pressure regulator vacuum line

download
1. Locate and identify the three vacuum ports on the intake manifold. 2. Disconnect and discard the vacuum hose that connects the fuel pressure regulator to vacuum port C. 3. Plug vacuum port C with the cap from the tube kit. 4. Replace the fuel pressure regulator. Refer to page 11-113 of the 1998-00 Accord Service Manual. 5. Install the new vacuum hose kit using one of the following procedures 1. Remove and discard the cap from vacuum port A. 2. Connect the short vacuum hose to vacuum port A M/T WITH CRUISE CONTROL 2. Disconnect and discard the vacuum hose that connects the fuel pressure regulator to vacuum port C. 3. Plug vacuum port C with the cap from the tube kit. 4. Replace the fuel pressure regulator. Refer to page 11-113 of the 1998-00 Accord Service Manual. 5. Install the new vacuum hose kit using one of the following procedures. Zoom Sized for Print 1. Remove and discard the cap from vacuum port A. 2. Connect the short vacuum hose to vacuum port A. Zoom Sized for Print 3. Anchor the long vacuum hose by attaching it to the rear intake air duct clip and to the cruise control hose. . Route the new vacuum hose to the fuel pressure regulator. Attach the hose to the three rear clips on the engine wire harness cover. Zoom Sized for Print 1. Remove and discard the vacuum hose from vacuum port A. This hose supplies vacuum to the rear engine mount control solenoid. 2. Connect the short vacuum hose from the top of the Y fitting to vacuum port A