Skip to content

installing 97 chevy cavalier canister purge solenoid

You search PDF repair manual about installing 97 chevy cavalier canister purge solenoid, if there are search results will appear below. If search results do not exist, please search by others keyword.

2004 Chevrolet Chevy K Silverado – 4WD Evaporative Emission (EVAP) Canister Vent Solenoid Valve Replacement Pickup

download
Evaporative Emission (EVAP) Canister Vent Solenoid Valve Replacement Pickup Removal Procedure Important Clean the evaporative emission (EVAP) connections and surrounding areas prior to disconnecting the fittings in order to avoid possible system contamination. 1. Raise and suitably support the vehicle. Refer to Lifting and Jacking the Vehicle in General Information. 2. Remove the harness clip from the canister vent solenoid (CVS) line. 3. Disconnect the CVS electrical connector. 2004 Chevrolet Chevy K Silverado – 4WD 4. If the vehicle is equipped with a 6 ft box, disconnect the EVAP CVS line from the canister. 5. Remove the CVS clip from the frame crossmember. 6. Push in the retainer and remove the CVS from the fuel tank clip. 7. If the vehicle is equipped with a 8 ft box, disconnect the EVAP CVS line from the canister. 8. Remove the CVS clip from the frame crossmember. 9. Push in the retainer and remove the CVS from the fuel tank clip. Installation Procedure 1. If the vehicle is equipped with a 8 ft box, install the CVS to the fuel tank until the clip engages. Important On vehicles equipped with a 8 ft box, the CVS line is routed below the frame crossmember. 2. Install the CVS clip to the frame crossmember. 3. Connect the EVAP CVS line to the canister. 4. If the vehicle is equipped with a 6 ft box, install the CVS to the fuel tank until the clip engages. Important On vehicles equipped with a 6 ft box, the CVS line is routed above the frame crossmember. 5. Install the CVS clip to the frame crossmember. 6. Connect the EVAP CVS line to the canister. 7. Connect the CVS electrical connector. 8. Install the harness clip to the canister vent solenoid (CVS) line. 9. Lower the vehicle.

2005 Nissan-Datsun Sentra Emission Control Systems Canister Purge Volume Control Valve Testing and Inspection Manual

download
Component Inspection EVAP CANISTER PURGE VOLUME CONTROL SOLENOID VALVE With CONSULT-II Check air passage continuity of EVAP canister purge volume control solenoid valve under the given conditions. Without CONSULT-II Check air passage continuity of EVAP canister purge volume control solenoid valve under the given conditions.

2001 Chevy Truck S10/ T10 Blazer Intake Manifold Replacement (Upper) Removal And Installation Manual

download
Intake Manifold Replacement (Upper) Notes Intake Manifold Replacement – Upper Removal Procedure Important: The upper intake does not have to be removed to remove the lower intake manifold. 1. Disconnect the breather tube at the air cleaner outlet duct 2. Remove the air cleaner outlet duct retaining wingnut. 3. Disconnect the IAT sensor harness connector 4. Remove the air cleaner outlet duct from the throttle body. 5. Disconnect the accelerator cable from the throttle body 6. Remove the accelerator cable from the accelerator control cable bracket. 7. Disconnect the cruise control cable, if equipped from the throttle shaft and the accelerator cable bracket. 8. Disconnect the vacuum hose from the intake manifold for the vacuum tank. 9. Remove the power brake booster vacuum hose. 10. Disconnect the following electrical connectors: * The A/C compressor clutch (1) * The A/C compressor cutoff switch (5), if equipped * The Throttle Position (TP) sensor (2) * The Idle Air Control (IAC) motor (3) 11. Disconnect the following electrical connectors: * The fuel meter body assembly (1) * The Manifold Absolute Pressure (MAP) sensor(3) * The EVAP canister purge solenoid valve (2) 12. Remove the engine wire harness clip from the accelerator cable bracket. 13. Move the engine wiring harness aside. 14. Remove the accelerator cable bracket from the throttle body and the intake manifold. 15. Remove the accelerator and cruise control cable bracket from the throttle body. Leave the accelerator and cruise control cables on the bracket16. Remove the PCV valve hose assembly from the intake manifold and the valve rocker arm cover. 17. Remove the bracket for the engine wiring harness from the intake manifold stud. 18. Remove the fuel lines from the fuel meter body assembly. 19. Remove the EVAP canister purge solenoid valve.

2000 Ford Crown Victoria/ Grand Marquis Intake Manifold – Gasoline Engines Removal and Installation Manual

download
Intake Manifold—Gasoline Engines Removal 1. Disconnect the battery ground cable. For additional information, refer to Section 414-01 . 2. Drain the engine cooling system. For additional information, refer to Section 303-03 . 3. Remove the air cleaner outlet tube. For additional information, refer to Section 303-12 . 4. Disconnect the fuel line. For additional information, refer to Section 310-00A or Section 310-00B . 5. Remove the wiper arm and pivot shaft. For additional information, refer to Section 501-16 . 6. Remove the drive belt. For additional information, refer to Section 303-05 . 7. Raise the vehicle on a hoist. For additional information, refer to Section 100-02 . 8. Disconnect the electrical connector at the crankshaft position (CKP) sensor. * Disconnect the pin-type retainer from the A/C compressor bracket. 9. Disconnect the electrical connector from the A/C compressor. 10. Remove the oil bypass filter. 11. Disconnect the oil pressure sensor electrical connector and the power steering pressure (PSP) switch electrical connector. 12. Disconnect the exhaust gas recirculation (EGR) tube from the exhaust manifold 13. Lower the vehicle. 14. Disconnect the two differential pressure feedback EGR hoses. 15. Disconnect the RH heated oxygen sensor electrical connector. 16. Disconnect the fuel charging wiring electrical connectors from the eight ignition coils. 17. Disconnect the fuel charging wiring electrical connectors from the eight fuel injectors. 18. Disconnect the accelerator cable and the speed control actuator cable. 19. Remove the cables from the EGR tube heat shield and position out of the way. 20. Remove the bolts and the EGR tube heat shield. 21. Disconnect the evaporative emissions (EVAP) return tube, the main chassis vacuum supply line, and the EGR valve vacuum supply. 22. Disconnect the positive crankcase ventilation (PCV) tube assembly at two locations and remove. 23. Disconnect the electrical connector from the EGR vacuum regulator solenoid. 24. Disconnect the vacuum line from the EVAP canister purge valve. 25. Disconnect the generator cable and electrical connector 26. Remove the bolts and the generator mounting bracket. 27. Remove the upper radiator hose. 28. Disconnect the electrical connector from the idle air control (IAC) valve and the throttle position (TP) sensor. 29. Disconnect the heater water hose. 30. Disconnect the EGR tube from the EGR valve. 31. NOTE: The LH heated oxygen sensor and the transmission electrical connectors are attached to the wiring bracket and must be separated from the bracket. Remove the wiring bracket. * Disconnect the wiring connectors. * Separate the transmission harness from the stud. * Remove the nut and the bolt and remove the bracket.

2002 Ford Lincoln LS Valve Cover LH Workshop Manual

download
Valve Cover LH Removal 1. Disconnect the battery ground cable. For additional information, refer to Section 414-01 . 2. Remove the air cleaner outlet tube. For additional information, refer to Section 303-12 . 3. Remove the air cleaner housing. 1. Disconnect the mass air flow (MAF) sensor electrical connector. 2. Remove the bolt. 3. Remove the housing. 4. CAUTION: To disconnect the Norma fitting, squeeze the tabs and pull straight out or damage to the fitting can occur. Disconnect the crankcase ventilation tube. 5. Disconnect the fuel hose. For additional information, refer to Section 310-00 . 6. Disconnect the evaporative emission canister purge valve hose. 7. Remove the vapor management valve (VMV) cover. SECTION 303-01B: Engine — 3.9L 2002 Lincoln LS Workshop Manual IN-VEHICLE REPAIR Procedure revision date: 05/17/2001 Material Item Specification 8. Remove the VMV. 1. Disconnect the vacuum hose. 2. Disconnect the purge hose. 3. Disconnect the electrical connector and the push pin. 4. Remove the nuts and the valve. 9. Remove the exhaust gas recirculation (EGR) vacuum regulator solenoid. 1. Disconnect the electrical connector. 2. Remove the screws and the EGR vacuum regulator solenoid. 10. Remove the bracket. 1. Remove the hose. 2. Remove the bracket. 11. Position the engine wiring harness up. 12. Remove the ignition coil cover. * Inspect the gasket and install a new gasket as necessary.