Skip to content

jeep cherokee manual 1998 pdf

You search PDF repair manual about jeep cherokee manual 1998 pdf, if there are search results will appear below. If search results do not exist, please search by others keyword.

1997 Jeep Grand Cherokee Laredo 7 1/8″, 7 1/3″, 7 9/16″, 7 4/5″, 8 1/4″, 8 1/2″ & 8 9/10″ Ring Gears Removal And Installation Manual

download
Removal (Model 194, 8 1/4″ & 1998 Grand Cherokee 216 Axles) 1. Raise and support vehicle. Remove rear wheel(s). If equipped with drum brakes, remove brake drum. If equipped with disc brakes, remove brake caliper and rotor. On all models, clean axle housing cover. Loosen cover bolts, and drain oil. Remove cover. 2. Remove differential pinion-shaft lock bolt. Remove pinion shaft from differential. Push in axle. Remove “C” clip from axle at pinion gear. Remove axle from tube. Remove axle shaft seal and bearing from axle tube. Installation 1. Grease bearing, and install into axle tube. Ensure bearing part number is facing outwards. Apply wheel bearing grease to axle shaft seal. Install seal in axle tube. Install axle shaft. 2. Install axle “C” clip. Pull axle out to seat “C” clip. Install pinion shaft. Install lock bolt, and tighten to specification. Apply RTV to axle housing cover. Tighten cover bolts to specification. See TORQUE SPECIFICATIONS table. Fill with gear oil. Removal (Model 198, 1999 Grand Cherokee 216 & 226 Axles) 1. Raise and support vehicle. Remove rear wheel(s). Remove brake drum. Remove nuts securing axle retainer plate to axle tube, and discard. Using slide hammer and Adapter (6790), remove axle shaft from axle tube. 2. Using a 3/8″ drill bit, drill a shallow hole into bearing retaining ring on axle. DO NOT drill into axle. Using a cold chisel, cut bearing retaining ring across drilled hole, and remove from axle shaft. Using a press and Bearing Remover (1130), remove bearing from axle shaft. Remove seal and retainer plate from axle shaft. Installation 1. Ensure axle shaft retaining plate is flat and not warped. Install retaining plate on axle shaft. Apply wheel bearing grease to axle shaft seal. Install seal on axle shaft. Grease bearing, and install on axle shaft with outer surface groove facing seal. 2. Using press and Bearing Installer (7913), press bearing onto axle shaft. Press NEW bearing retainer ring onto axle shaft. Install axle shaft in axle tube. Tighten NEW axle retainer plate nuts to specification. See TORQUE SPECIFICATIONS table. PINION SEAL & YOKE Removal

1984-1998 Jeep Wagoneer/ Commando/ Cherokee Emission Controls Crankcase Ventilation System (PCV/CCV)

download
CCV Fitting See Figures 2 and 3 1. With the engine running, remove the CCV fitting. a. If the fitting is not plugged, a hissing noise will be heard as air passes through the valve. A strong vacuum should also be felt when a finger is placed over the fitting. b. Install the CCV fitting. c. Remove the fresh air hose from the air cleaner assembly and loosely hold a piece of paper over the open end of the hose. After allowing about one minute for the crankcase pressure to reduce, the paper should be sucked against the opening with a noticeable amount of force. 2. Turn the engine OFF . Remove the metered orifice fitting, and check for a plugged condition. A clicking noise should be heard to indicate that the valve mechanism is free. 3. If the crankcase ventilation system meets the tests in Steps 1 and 2 above, no further service is required. If not, the CCV fitting must be cleaned and the system checked again. 4. If Step 1c fails when the CCV fitting is cleaned, it will be necessary to replace the molded vacuum hose with a new one, and to clean the metered orifice port. 5. Clean or replace the engine air cleaner filter element with a new one-for more details, refer to the air cleaner procedure located in General Information & Maintenance. Fig. 2: CCV system diagram for 4.0L engine Fig. 3: CCV system diagram for the 2.5L engine Evaporative Emission Control System OPERATION The evaporative emission control system prevents the release of unburned hydrocarbons, from gasoline or gasoline vapor, into the atmosphere. When pressure in the fuel tank is below 3 psi (20 kPa), the pressure relief/rollover valves open allowing fuel vapors to flow to the evaporative canister where they are absorbed by a charcoal mixture. This prevents excessive pressure buildup in the fuel system. Most canisters are equipped with a calibrated orifice at the inlet to the canister.

1998 Chevy Truck S10/ T10 Blazer 2WD Evaporator Core Service and Repair Manual

download
Manual A/C REMOVAL PROCEDURE CAUTION: Refer to Battery Disconnect Caution in Service Precautions. 1. Disconnect the negative battery cable. 2. Remove the right side instrument panel sound insulator. 3. Remove the instrument panel storage compartment. 4. Disconnect the passenger side SIR. 5. Remove the lower right instrument panel mounting bolt. 6. Remove the left and right front speaker grilles. 7. Remove the center instrument panel sound insulator. 8. Remove the left side instrument panel sound insulator. 9. Disconnect the park brake release cable. 10. Remove the knee bolster. 11. Remove the lower left instrument panel mounting bolt. 12. Remove the BCM. 13. Disconnect the driver side SIR. 14. Remove the instrument panel cluster. 15. Remove the radio. 16. Remove the HVAC control assembly. 17. Remove the steering column retaining retaining nuts. 18. Lower the steering column. 19. Remove the instrument panel carrier. 20. Remove the left and right cowl vent grille panels. 21. Disconnect the underhood lamp electrical connector, if equipped. 22. Remove the hood. 23. Remove the VCM. 24. Remove the coolant recovery tank. 25. Remove the heater hoses. 26. Disconnect the electrical connectors from the grille mounted lamps. 27. Remove the right front headlamp assembly. 28. Remove the front bumper. 29. Remove the right wheelhouse panel. 30. Disconnect the radio antenna cable. 31. Disconnect the electrical connector for the horn. 32. Remove the right fender. 33. Remove the evaporator case heat shield, if equipped. 34. Remove the blower motor resistor. 35. Remove the evaporator case bolts and screws. 36. Remove the accumulator. 37. Remove the condenser to the evaporator line fitting. 38. Remove the bolts which retain the evaporator case to the bulkhead. 39. Pull back lightly on the heater case to remove the evaporator case. 40. Remove the evaporator case retaining screws. 41. Disassemble the evaporator case sections, and remove the evaporator core. NOTE: If replacing the evaporator core, remove the expansion (orofice) tube and install it into the new core. INSTALLATION PROCEDURE 1. Install the evaporator core. 2. Assemble the evaporator case sections. 3. Install the evaporator case retaining screws. Tighten to 2.5 N.m (24 in lb) . 4. Install the evaporator core assembly to the vehicle. 5. Install the bolts which retain the evaporator case to the bulkhead. Tighten the bolts to 4.5 N.m (40 lb in) . 6. Install the condenser to the evaporator line fitting. 7. Install the accumulator. 1998 Chevy Truck S10/T10 Blazer 2WD 8. Install the evaporator case bolts and screws. Tighten to 2.5 N.m (24 In in) . 9. Install the blower motor resistor. 10. Install the evaporator case heat shield, if equipped. 11. Install the right fender. 12. Connect the electrical connector for the horn. 13. Install the radio antenna cable. 14. Install the right wheelhouse panel. 15. Install the front bumper. 16. Install the right front headlamp assembly. 17. Connect the electrical connectors to the grille mounted lamps. 18. Install the heater hoses. 19. Install the coolant recovery tank. 20. Install the VCM. 21. Install the hood. 22. Connect the underhood lamp electrical connector, if equipped. 23. Install the left and right cowl vent grille panels. 24. Install the instrument panel carrier. 25. Reposition the the steering column, and install the steering column retaining nuts. 26. Install the HVAC control assembly. 27. Install the radio. 28. Install the instrument panel cluster. 29. Connect the driver side SIR. 30. Install the BCM. 31. Install the lower left instrument panel mounting bolt. 32. Install the knee bolster. 33. Connect the park brake release cable. 34. Install the left side instrument panel sound insulator. 35. Install the center instrument panel sound insulator. 36. Install the left and right front speaker grilles. 37. Install the lower right instrument panel mounting bolt. 38. Connect the passenger side SIR. 39. Install the instrument panel storage compartment. 40. Install the right side instrument panel sound insulator. 41. Connect the negative battery cable. 42. Inspect the system for leaks.

1998-2000 ISUZU RODEO/AMIGO HIGH/ERRATIC IDLE CONDITION SERVICE MANUAL

download
1998 – 2000 MODELS 1. Inspect main ground points (refer to SB99*04*S001 for more information). * P6 ground point-body [on the passenger side of engine compartment, between the battery and cruise control actuator (if equipped)]. (Figure Fig. 1 ) * P10 ground point-engine (at the alternator bracket) . (Figure Fig. 2 ) Isuzu: 1998 – 2000 Rodeo AFFECTED VEHICLES:1998 – 2000 Rodeo (UE)/Amigo (UA) models with 3.2L V6 engines NOTE: Please refer to the appropriate workshop manual for the correct diagnosing procedure and/or follow the service procedures outlined in this bulletin for the vehicle being serviced. NOTE: The 1998, 1999 or 2000 Rodeo/Amigo Electrical Troubleshooting Manual can assist in locating the vehicle ground distribution (i.e., ground contact points). * Perform a voltage drop test at the main ground points. * If the voltage drop test fails, then inspect and clean both the bolt and contact point. * Verify and correct idle settings (if needed) as described in the workshop manual. * If the repair procedure on this step solves the high idle condition, then return the vehicle to the customer. If the repair procedure on this step does not solve the high idle condition, then go to step 2 (16 pin Blue Connector). B. Remove P-6/P-10 ground terminal and bolt for ground contact inspection. * Inspect ground contact area for corrosion. * Inspect bolt and thread for damage or corrosion. * Clean the ground area and fastening bolt thoroughly with a wire brush. * Replace bolt if damaged or heavily corroded. C. Install the P-6/P-10 ground terminal and bolt (tighten using hand tools only). * Torque the P-6/P-10 ground terminal bolt to (14 N.m) 10 lb.ft. 1998 – 1999 MODELS ONLY 2. Inspect the 16 pin blue connector, located under the power steering fluid reservoir for corrosion, bent, or damaged pins (specifically for the Throttle Position Sensor). (Figure Fig. 3 )

1998-2000 HONDA Accord L4 Replace the fuel pressure regulator, and reroute the fuel pressure regulator vacuum line

download
1. Locate and identify the three vacuum ports on the intake manifold. 2. Disconnect and discard the vacuum hose that connects the fuel pressure regulator to vacuum port C. 3. Plug vacuum port C with the cap from the tube kit. 4. Replace the fuel pressure regulator. Refer to page 11-113 of the 1998-00 Accord Service Manual. 5. Install the new vacuum hose kit using one of the following procedures 1. Remove and discard the cap from vacuum port A. 2. Connect the short vacuum hose to vacuum port A M/T WITH CRUISE CONTROL 2. Disconnect and discard the vacuum hose that connects the fuel pressure regulator to vacuum port C. 3. Plug vacuum port C with the cap from the tube kit. 4. Replace the fuel pressure regulator. Refer to page 11-113 of the 1998-00 Accord Service Manual. 5. Install the new vacuum hose kit using one of the following procedures. Zoom Sized for Print 1. Remove and discard the cap from vacuum port A. 2. Connect the short vacuum hose to vacuum port A. Zoom Sized for Print 3. Anchor the long vacuum hose by attaching it to the rear intake air duct clip and to the cruise control hose. . Route the new vacuum hose to the fuel pressure regulator. Attach the hose to the three rear clips on the engine wire harness cover. Zoom Sized for Print 1. Remove and discard the vacuum hose from vacuum port A. This hose supplies vacuum to the rear engine mount control solenoid. 2. Connect the short vacuum hose from the top of the Y fitting to vacuum port A