Skip to content

saab 9000 electrical diagram

You search PDF repair manual about saab 9000 electrical diagram, if there are search results will appear below. If search results do not exist, please search by others keyword.

1991 Saab 9000 L4-2290cc 2.3L DOHC Turbo EFI Axle Shaft Removal And Installation Manual

download
Service and Repair Notes Removal Important: Thorough cleanliness must be observed during all work on drive shafts and drive shaft joints, to prevent dirt and dust getting into the joints. Before starting work, always clean the wheel arch, MacPherson strut and other areas around the drive shaft and joints. 1Unfasten the hub centre-nut. 2Lift the car and remove the wheel. 3Remove the hub centre-nut. Push the axle stub back approx. 2 cm (if it pushed further back it can damage the tripod). Use puller 87 91 287 and puller arms 87 91 303 together with tool 87 91 154, puller bracket, the belongs to tool collection for manual gear boxes. 4Remove the steering-swivel member from the MacPherson strut and unfasten the flexible hose from the hose mounting and, if appropriate, also unfasten the ABS sensor and cable. Important: Scrupulously clean the rubber gaiter and the universal joint driver. 5Remove the clamp securing the rubber gaiter on the inner universal joint driver. Pull the universal joint apart and fit the protective cover on the rubber gaiter and universal joint driver. 6Pull out the drive shaft from the hub. Fitting 1Remove existing grease out of the universal joint driver and carefully clean the interior. 2 Pack the universal joint driver with grease, 60 g Mobile K 575 GS. Observe great cleanliness. Motor / ALLDATA Online – 1991 Saab 9000 L4-2290cc 2.3L DOHC T… http://www.motoralldata.com/alldata/MOTOR~V71595976~C19965~… 3 of 4 3/26/2008 12:03 AM Zoom Sized for Print

REV / SPEED METER Vehicle Specific Wiring Diagram Installation

download
Installation Precautions ?Do not use electro taps in the installation of this product. Electro taps can become loose over time causing the unit to malfunction. This can also lead to vehicle and product damage. Be sure to use wire crimpers and the included splices for a secure connection. ?Be sure that the harness is not exposed to metal. Always wrap all connections with electrical tape. ?How to use the Fittings Strip 5mm from wire Insert sleeve over wire Bend back exposed wire Place male fitting over This ECU terminal arrangement diagram is viewed from the direction of the arrow. The direction of the ECU varies depending upon the vehicle. Perform the installation work after confirming the connector shape and the number of pins. ?If any abnormal noise or abnormal smell is sensed during the installation work of this product stop the work immediately and contact the distributor or your nearest A*PEX business office Continuing the installation under such conditions may cause an electric shock or fire causing damage to electric devices.

1998 Pontiac Grand Prix DTC P0753 1-2 Shift Solenoid Circuit Electrical Repair Manual

download
Test Description The numbers below refer to the step numbers on the diagnostic table. 6. This step isolates the fault between the engine harness and the transmission harness. 8. This step verifies that circuit 1222 is neither open nor shorted to power. 11. This step verifies that the 1-2 shift solenoid has neither shorted across its windings nor increased its resistance. DTC P0753 1-2 Shift Solenoid Circuit– Electrical Step Action Value(s) Yes No 1 Was the Powertrain On-Board Diagnostic (OBD) System Check performed? — Go to Step 2 Go to Powertrain On Board Diagnostic (OBD) System Check 2 1. Install the Scan Tool . 2. Turn the ignition switch to the RUN position. Important Before clearing the DTCs, use the scan tool in order to record the Freeze Frame and Failure Records for reference. The Clear Info function will erase the data. 3. Record the DTC Freeze Frame and Failure Records, then clear the DTC. — Go to Are DTCs P0758, P1860 or P0740 set? Step 3 Go to Step 6 3 1. Remove the TCC fuse. 2. Inspect the fuse for an open. Was a condition found and corrected? — Go to Step 4 Go to Step 5 4 Repair short to ground in engine harness circuit 1339 or transmission harness circuit 839. Refer to General Electrical Diagnosis Procedures . Was a condition found and corrected? — Go to Step 21 — 5 Repair the open in engine harness circuit 1339 or transmission harness circuit 839. Refer to General Electrical Diagnosis Procedures . Was a condition found and corrected? — Go to Step 21 — 6 1. Turn the ignition switch OFF. 2. Disconnect the Automatic Transmission 7-way connector. 3. Install the J 38835 Transmission Electrical Jumper on the engine harness connector. 4. Connect a test lamp from terminal E to terminal A of the jumper using a J 35616-A Connector Test Adapter Kit. Important Additional DTCs will set. 5. With the engine OFF, turn the ignition ON. Is the test lamp ON? — Go to Step 7 Go to Step 8 7 Inspect engine harness circuit 1222 for a short to ground. Refer to General Electrical Diagnosis Procedures . Was a condition found and corrected? — Go to Step 21 Go to Step 20 8 Using the scan tool command the 1-2 solenoid ON and OFF three times. Does the test lamp cycle ON and OFF as commanded? — Go to Step 11 Go to Step 9 9 Inspect engine harness circuit 1222 for an open. Refer to General Electrical Diagnosis Procedures . Was a condition found and corrected? — Go to Step 21 Go to Step 10 10 Inspect engine harness circuit 1222 for a short to power. Refer to General Electrical Diagnosis Procedures . Was a condition found and corrected? — Go to Step 21 Go to Step 19 11 1. Turn the ignition OFF. 2. Disconnect the J 38835 Transmission Electrical Jumper from the engine harness. 3. Connect the J 38835 Transmission Electrical Jumper to the Automatic Transmission 7-way connector. 4. Connect a J 39200 Digital Multimeter (DMM) from 19 ohms to 31 ohms terminal E to terminal A of the jumper. Is the measured resistance within the specified range? Go to Step 15 Go to Step 12 12 Is the resistance greater than the specified value? 31 ohms Go to Step 13 Go to Step 15 13 Inspect the transmission harness RED wire circuit 839 and the LT GRN wire circuit 1222 for an open. Refer to General Electrical Diagnosis Procedures . Was a condition found? — Go to Step 14 Go to Step 18 14 Replace the Automatic Transmission Wiring Harness. Refer to Solenoids and Wiring Harness Replacement . Is the replacement complete? — Go to Step 21 — 15 Connect the J 39200 Digital Multimeter from terminal A of the jumper to ground. Is the resistance less than the specified value? 100 ohms Go to Step 16 Go to Step 18 16 Inspect the transmission harness LT GRN wire circuit 1222 for a short to ground or short to power. Refer to General Electrical Diagnosis Procedures . Was a condition found? — Go to Step 17 Go to Step 18 17 Replace the Automatic Transmission Wiring Harness. Refer to Solenoids and Wiring Harness Replacement . Is the replacement complete? — Go to Step 21 — 18 Replace the 1-2 Shift Solenoid Valve Assembly. Refer to Solenoids and Wiring Harness Replacement . Is the replacement complete? — Go to Step 21 — 19 Inspect PCM connector C1 (Blue) for bent, damaged or backed out connector pins. Was a condition found and corrected? — Go to Step 21 Go to Step 20 20 Replace the PCM. Refer to PCM Replacement/Programming . Is the replacement complete? — Go to Step 21 — 21 In order to verify your repair, perform the following procedure: 1. Using the scan tool, clear DTCs. 2. Operate the vehicle under the following conditions: { The engine speed is more than 500 RPM. { The vehicle is not in fuel shut off. { System voltage is 10-16 volts. { Drive the vehicle through the 1-2 shift. { When the 1-2 SS Valve Assembly is commanded ON, the voltage decreases to zero. { When the 1-2 SS Valve Assembly is commanded OFF, the voltage increases to B+. { All conditions are met for 5 seconds.

Battery Electrical Drain/ Parasitic Load Test Repair Manual

download
1. Disconnect the battery negative cable 2. Install the male end of the J 38758 to the negative battery terminal. 3. Turn OFF the test switch. 4. Install the negative battery cable to the female end of the test switch. 5. Install the Scan Tool (or equivalent) or wait for 20 minutes. 6. Turn ON the test switch. 7. Road test the vehicle while activating all accessories, including the radio and the air conditioning. 8. Lower the door glass, then exit the vehicle. Do not move the door handle after closing the door. 9. Open the hood. Important The power down timer will reset to 20 minutes if any wake up inputs are received by a Class 2 device (after the scan tool has put all Class 2 devices to sleep). 10. Put all of the Class 2 devices into the sleep mode. 11. Turn OFF the ignition switch. Remove the key. Important From this point on, electrical continuity must be maintained in the ground circuit of the battery through the Test Switch J 38758 in the ON position or through the ammeter J 39200 . 12. Components such as PCM, VCM, Automatic Air Conditioning, and the Truck Body Control Module have timers that draw several amps of current while they cycle down. This can give a false parasitic drain reading. Wait 20 minutes for these components to power down before continuing this test (or use the scan tool to put all Class 2 devices to sleep). 13. Connect a jumper wire with a 10 A fuse J 36169-A to the terminals of the test switch. 14. Turn the test switch to the OFF position. 15. Wait ten seconds. If the fuse does not blow, the current is less than 10 A. The ammeter can be used safely. 16. Before the fused jumper wire is removed, turn the test switch to the ON position. Important If an ammeter other than the J 39200 is used, ensure that the vehicle does not have a high current drain that would damage the ammeter when connected to the circuit. 17. Perform the following procedure in order to detect a high current drain: A. Set the ammeter J 39200 to the 10 A scale. B. Connect the ammeter to the test switch terminals. C. Turn OFF the test switch. This allows the current to flow through the ammeter. D. Wait one minute, then inspect the current reading. Ñ When there is a current reading of 2 A or less, turn ON the test switch, this maintains continuity in the electrical system. Ñ Then, switch the meter down to the 2 A scale, for a more accurate reading, when the test switch is reopened. E. Open the test switch. F. Take the reading in milliamps. G. Note the battery reserve capacity. Refer to Battery Usage . Ñ Divide this number by 4. Example: 90/4 = 22.5 Ñ Compare this to the ammeter reading. Ñ The current drain in milliamps should not exceed this number. Ñ Example: if a battery has a reserve capacity of 90 minutes, the current drain should not exceed 22 milliamps. H. When the current draw is too high, remove the electrical system fuses one at a time until the draw returns to a value less than or equal to specifications. Ñ Start with the fuses that are hot all the time. Ñ To remove the fuse, you must first open the door, which causes a high enough current flow to damage the ammeter. Ñ Protect the ammeter, without disturbing the electrical continuity, by turning ON the test tool before opening the door. Ñ Remove the courtesy lamp fuse. Ñ Note the ammeter reading. Ñ If the parasitic load is still excessive, start removing the remaining fuses one at a time. Ñ Keep the courtesy lamp fuse out during diagnosis, so the door can remain open. Ñ Perform Steps 11 through 13 each time a fuse is removed. I. Removing the PCM or VCM fuse should cause a drop of less than 10 milliamps. A drop greater than 10 milliamps indicates a possible short to ground. J. Check the orange wires along with the components connected to the orange wires. No drop in the milliampere reading indicates the PCM or VCM is not drawing current. K. Repeat the parasitic current drain test procedure after any repair has been completed. L. When the cause of the excessive current draw has been located and repaired, remove the ammeter and the parasitic draw test switch.

Battery Electrical Drain/ Parasitic Load Test

download
1. Disconnect the battery negative cable. 2. Install the male end of the J 38758 to the negative battery terminal. 3. Turn OFF the test switch. 4. Install the negative battery cable to the female end of the test switch. 5. Install the Scan Tool (or equivalent) or wait for 20 minutes. 6. Turn ON the test switch. 7. Road test the vehicle while activating all accessories, including the radio and the air conditioning. 8. Lower the door glass, then exit the vehicle. Do not move the door handle after closing the door. 9. Open the hood. Important The power down timer will reset to 20 minutes if any wake up inputs are received by a Class 2 device (after the scan tool has put all Class 2 devices to sleep). 10. Put all of the Class 2 devices into the sleep mode. 11. Turn OFF the ignition switch. Remove the key. Important From this point on, electrical continuity must be maintained in the ground circuit of the battery through the Test Switch J 38758 in the ON position or through the ammeter J 39200 . 12. Components such as PCM, VCM, Automatic Air Conditioning, and the Truck Body Control Module have timers that draw several amps of current while they cycle down. This can give a false parasitic drain reading. Wait 20 minutes for these components to power down before continuing this test (or use the scan tool to put all Class 2 devices to sleep). 13. Connect a jumper wire with a 10 A fuse J 36169-A to the terminals of the test switch. 14. Turn the test switch to the OFF position. 15. Wait ten seconds. If the fuse does not blow, the current is less than 10 A. The ammeter can be used safely. 16. Before the fused jumper wire is removed, turn the test switch to the ON position. Important