to clean the throttle body on a 2006 chevy colorado

You search PDF repair manual about to clean the throttle body on a 2006 chevy colorado, if there are search results will appear below. If search results do not exist, please search by others keyword.



  to clean the throttle body on a 2006 chevy colorado Direct Download speed 5432 Kb/s

  to clean the throttle body on a 2006 chevy colorado Full Version speed 8172 Kb/s



HIGH TECH DUAL QUAD THROTTLE LINKAGE KIT INSTALLATION INSTRUCTIONS

0

Filed Under (More Manuals) by admin on 02-01-2012

download
INSTALLATION 1. This kit contains all the necessary parts to operate Edelbrock carburetors in a progressive or 1: 1 type operation. Figure 1 illustrates typical progressive type installation in which the rear carburetor is the primary carb. This simplifies linkage attachment to the vehicle’s existing throttle linkage. 2. Before attaching anything to the carburetors, loosely assemble the major components of the linkage kit using Figure 1 as a guideline. Note that the longer rod will go to the rear carb with the flat facing down, and the short rod goes to the front carb with the flat facing up. The brass bearing blocks should be positioned so that the set screws will tighten against the flat of the short rod, i.e., both bearing block set screws will be up. Attach the aluminum collar to the long rod between the bearing blocks with the set screw against the flat. 3. Attach the linkage assembly to the carbs with the 10-24 allen head screws and locknuts. Attach to the rear carb using one of the brass 518″ O.D. x 3/16″ I.D. shoulder spacers and the tapered brass anti-rotation shoulder spacer in the top hole of the throttle arm (112″ diameter). Note that the shoulder spacer goes on the inside and the anti-rotation spacer goes on the outside of the throttle arm. Attach to the front carb using the 3/16″ hole just below the large hole in the throttle arm. ADJUSTMENT – NOTE: If carburetors are full of fuel, place rags in the carb throats to absorb the fuel discharged when working the throttle linkage. This will prevent flooding and possible damage to the piston rings upon start-up. Be sure to remove the rags before starting engine. 1. Tighten the set screw and locknut on the rear bearing block, making sure that the bearing block is close to the end of the shaft from the front carburetor. 2. Push the throttle arms of both carbs to WOT (Wide Open Throttle), then adjust the aluminum collar to touch the rear brass bearing block. Securely tighten the set screw and locknut on the aluminum collar. 3. Let both throttle arms return to idle position, then adjust the front brass bearing block to almost touch the aluminum collar. Leave about .020″-.030″ clearance to allow for independent idle speed adjustment of each carburetor. Tighten all set screws, locknuts, and bolts at this time. 4. Check for smooth operation of linkage from idle to WOT and note that the rear carb will open about 20″ before starting to open the front carb. Both carbs should reach WOT at the same time. 5. IMPORTANT: Attach a return spring to both carburetors as shown in Figure 1. Use the return spring brackets supplied, bending as necessary for attachment to your engine. Generally the brackets can be attached to the intake manifold using the existing bolts. Use the longer or shorter spring on either the front or rear carburetor as required for your particular application. Check for smooth operation and positive return to idle. 6. Attach existing throttle linkage to rear carburetor using the 3/16″ hole below the large hole in the throttle arm. It may be necessary to shorten your existing linkage rod or cable, or to use an aftermarket cable mounting plate. BEFORE STARTING ENGINE, DOUBLE-CHECK FOR SMOOTH OPERATION OF LINKAGE FROM IDLE TO WIDE OPEN THROTTLE AND FOR POSITIVE RETURN TO IDLE. OPTIONAL 1:l INSTALLATION If 1:l linkage is desired, assemble and attach linkage kit as above, except that the attachment point to the front carburetor’s throttle arm will be the large 112″ hole using the other two 518″ O.D. x 3/16″ I.D. shoulder spacers (similar to the rear carburetor). Adjust the bearing blocks to eliminate all freeplay, so that all motion to the rear carburetor’s throttle arm is transmitted directly to the front carb’s throttle arm

Related Content:

iS THERE A SPRING CONNECTING THE LINKAGE TO THE TPS ON A97 LESABRE, edelbrock dubble carburetor adjustment linkage, relearn on throttle body trailblazer 2005, throttle body for a 2006 buick rendezvous, relearn procedure for throttle body 2004 chevy trailblazer, volvo penta throttle control diagram, p1512 chevy trailblazer, where is the fuel line to throttle body on a 2006 KIA RIO, lincoln ls throttle linkage, jaguar s type throttle body return spring

HIGH TECH DUAL QUAD THROTTLE LINKAGE KIT INSTALLATION MANUAL

0

Filed Under (More Manuals) by admin on 24-02-2012

download
INSTALLATION 1. This kit contains all the necessary parts to operate Edelbrock carburetors in a progressive or 1: 1 type operation. Figure 1 illustrates typical progressive type installation in which the rear carburetor is the primary carb. This simplifies linkage attachment to the vehicle’s existing throttle linkage. 2. Before attaching anything to the carburetors, loosely assemble the major components of the linkage kit using Figure 1 as a guideline. Note that the longer rod will go to the rear carb with the flat facing down, and the short rod goes to the front carb with the flat facing up. The brass bearing blocks should be positioned so that the set screws will tighten against the flat of the short rod, i.e., both bearing block set screws will be up. Attach the aluminum collar to the long rod between the bearing blocks with the set screw against the flat. 3. Attach the linkage assembly to the carbs with the 10-24 allen head screws and locknuts. Attach to the rear carb using one of the brass 518″ O.D. x 3/16″ I.D. shoulder spacers and the tapered brass anti-rotation shoulder spacer in the top hole of the throttle arm (112″ diameter). Note that the shoulder spacer goes on the inside and the anti-rotation spacer goes on the outside of the throttle arm. Attach to the front carb using the 3/16″ hole just below the large hole in the throttle arm. ADJUSTMENT – NOTE: If carburetors are full of fuel, place rags in the carb throats to absorb the fuel discharged when working the throttle linkage. This will prevent flooding and possible damage to the piston rings upon start-up. Be sure to remove the rags before starting engine. 1. Tighten the set screw and locknut on the rear bearing block, making sure that the bearing block is close to the end of the shaft from the front carburetor. 2. Push the throttle arms of both carbs to WOT (Wide Open Throttle), then adjust the aluminum collar to touch the rear brass bearing block. Securely tighten the set screw and locknut on the aluminum collar. 3. Let both throttle arms return to idle position, then adjust the front brass bearing block to almost touch the aluminum collar. Leave about .020″-.030″ clearance to allow for independent idle speed adjustment of each carburetor. Tighten all set screws, locknuts, and bolts at this time. 4. Check for smooth operation of linkage from idle to WOT and note that the rear carb will open about 20″ before starting to open the front carb. Both carbs should reach WOT at the same time. 5. IMPORTANT: Attach a return spring to both carburetors as shown in Figure 1. Use the return spring brackets supplied, bending as necessary for attachment to your engine. Generally the brackets can be attached to the intake manifold using the existing bolts. Use the longer or shorter spring on either the front or rear carburetor as required for your particular application. Check for smooth operation and positive return to idle. 6. Attach existing throttle linkage to rear carburetor using the 3/16″ hole below the large hole in the throttle arm. It may be necessary to shorten your existing linkage rod or cable, or to use an aftermarket cable mounting plate. BEFORE STARTING ENGINE, DOUBLE-CHECK FOR SMOOTH OPERATION OF LINKAGE FROM IDLE TO WIDE OPEN THROTTLE AND FOR POSITIVE RETURN TO IDLE. OPTIONAL 1:l INSTALLATION If 1:l linkage is desired, assemble and attach linkage kit as above, except that the attachment point to the front carburetor’s throttle arm will be the large 112″ hole using the other two 518″ O.D. x 3/16″ I.D. shoulder spacers (similar to the rear carburetor). Adjust the bearing blocks to eliminate all freeplay, so that all motion to the rear carburetor’s throttle arm is transmitted directly to the front carb’s throttle arm

Related Content:

4g13 engine ignition adjustments, carter duel quad carb adjustment, Duromax 7 hp idle adjustment, how to change kancil carburetor, schematic diagram of elect fuel system include locations for a 1989 toyota camry 2 0 engine passenger car, setting caburater kancil, specialist kancil carburetor, volvo penta 3 0 glpj valve adjustment

2006 Ford Five Hundred SE UPPER INTAKE MANIFOLD REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Ford Manuals) by admin on 30-11-2011

download
Removal All vehicles 1. Drain the cooling system. For additional information, refer to DRAINING . 2. Disconnect the battery ground cable. For additional information, refer to REMOVAL AND INSTALLATION . 3. Remove the air cleaner outlet pipe. For additional information, refer to REMOVAL AND INSTALLATION . 4. Remove the 4 transaxle roll restrictor cross brace bolts 5. Remove the bolt and the transaxle roll restrictor cross brace. 6. Disconnect the evaporative emissions (EVAP) canister purge valve tube from the upper intake manifold and detach the retainer. 7. Disconnect the positive crankcase ventilation (PCV), brake booster and vacuum harness tubes from the upper intake manifold. 8. Detach the fuel tube retainer from the upper intake manifold. 9. Disconnect the exhaust gas recirculation (EGR) system module electrical connector and vacuum tube. 10. Detach the vacuum tube from the upper intake manifold vacuum tube retainer. 11. Disconnect the EGR system module tube from the EGR system module. Early build 12. Disconnect and plug the throttle body and PCV coolant hoses. Late build 13. Disconnect and plug the 2 PCV coolant hoses. All vehicles 14. Disconnect the throttle body electrical connector. 15. If equipped, remove and discard the 4 upper-to-lower intake manifold screws. 16. Remove the 8 bolts and the upper intake manifold. * Remove and discard the gaskets. Installation All vehicles Fig. 4: Identifying Tightening Sequence Of Bolts Courtesy of FORD MOTOR CO. NOTE: Clean and inspect all sealing surfaces. Install new gaskets 1. Position the upper intake manifold and install the 8 bolts. * Tighten in the sequence shown to 10 N.m (89 lb-in). 2. Connect the throttle body electrical connector. Late build 3. Connect the 2 PCV coolant hoses. Early build 4. Connect the throttle body and PCV coolant hoses. All vehicle 5. Connect the EGR system module tube to the EGR system module. * Tighten to 40 N.m (30 lb-ft). 6. Attach the vacuum tube to the upper intake manifold vacuum tube retainer. 7. Connect the EGR system module electrical connector and vacuum tube. 8. Attach the fuel tube retainer to the upper intake manifold. 9. Connect the PCV, brake booster and vacuum harness tubes to the upper intake manifold. 10. Connect the EVAP canister purge valve tube to the upper intake manifold and attach the retainer. 11. Clean the 4 transaxle roll restrictor cross brace bolts using a wire brush and apply new threadlock to the threads. 12. Position the transaxle roll restrictor cross brace and install the 4 new bolts. * Tighten to 55 N.m (41 lb-ft). 13. Clean the transaxle roll restrictor cross brace-to-roll restrictor bolt using a wire brush and apply new threadlock to the threads. 14. Install a new transaxle roll restrictor cross brace-to-roll restrictor bolt. * Tighten to 48 N.m (35 lb-ft). 15. Install the air cleaner outlet pipe. For additional information, refer to REMOVAL AND INSTALLATION . 16. Connect the battery ground cable. For additional information, refer to REMOVAL AND INSTALLATION . 17. Fill and bleed the cooling system.

Related Content:

ford five hundred roll restrictor bushing diy, ford five hundred throttle body repair, fuel filler tube diagrams chevy impala 2003, pcv valve 3 0 ford aerostar where does small vacuum connection on pcv valve go

2005 Chevrolet Colorado Pickup SES Light Due to DTCs P0105, P0106, and/ or P0506 – Clean Throttle Body

0

Filed Under (Chevrolet Manuals) by admin on 20-11-2011

download
Models: 2004-2007 Buick Rainier 2002-2007 Chevrolet TrailBlazer 2004-2007 Chevrolet Colorado 2002-2007 GMC Envoy 2004-2007 GMC Canyon 2002-2004 Oldsmobile Bravada 2006-2007 HUMMER H3 2005-2007 Saab 9-7X with any of the following engines: 2.8L (VIN 8 – RPO LK5) 2.9L (VIN 9 – RPO LLV) 3.5L (VIN 6 – RPO L52) 3.7L (VIN E – RPO LLR) 4.2L (VIN S – RPO LL8) The following diagnosis might be helpful if the vehicle exhibits the symptom(s) described in this PI. Condition/Concern: On rare occasions, a SES light may be experienced due to DTCs P0105, P0106, and/or P0506. There may or may not be an idle complaint accompanying the SES light. This may be due to excessive carbon build up in the throttle body. Recommendation/Instructions: If the SI diagnostics do not isolate a cause for this concern, clean the throttle body bore and plate for evaluation.

Related Content:

05 canyon throttle body cleaning video, 2005 GMC Canyon Owners Manual, 2005 GMC Canyon transmission repair manual, 2005 pontiac grand prix throttle body, clean throttle body envoy

1989 Toyota 4Runner ENGINE PERFORMANCE Removal Overhaul And Installation

0

Filed Under (Toyota Manuals) by admin on 26-10-2011

download
CARBURETOR (COROLLA) REMOVAL 1) Drain cooling system. Disconnect air intake hose. Disconnect emission control hoses from air cleaner. Remove air cleaner mounting bolt and wing nut. Remove air cleaner. 2) Disconnect accelerator cable. Disconnect throttle cable (A/T). Disconnect carburetor wiring connector. Disconnect emission control hoses and tag for installation. Disconnect fuel inlet hose. Remove 4 carburetor mounting nuts and No. 1 vacuum pipe. Remove carburetor. DISASSEMBLY Air Horn 1) Remove air cleaner setting bolt. Remove fuel pipe clamp, union, fuel pipe and gaskets. Remove vacuum hoses. Remove pump and pivot screw and pump arm with connecting link. Disconnect choke link and choke opener link. 2 Remove 8 air horn screws and number plate, fuel pipe support and wire clamps. Remove air horn from carburetor body. Disconnect wiring from solenoid valves. 3) Remove float pivot pin, float and needle valve assembly. Remove air horn gasket, needle valve seat and gasket, power piston retainer, power piston and spring. Remove pump plunger and boot. See Fig. 2.
Fig. 1: Exploded View of Aisan Carburetor Main Body (Corolla) Courtesy of Toyota Motor Sales, U.S.A., Inc. Fig. 2: Exploded View of Air Horn Assembly (Corolla) Courtesy of Toyota Motor Sales, U.S.A., Inc. Main Body 1) Remove solenoid valves from carburetor body. Remove stopper gasket. Disconnect throttle positioner links and remove bracket attaching bolts. Remove accelerator pump retainer gasket and remove pump discharge weight, long spring and discharge large ball. See Fig. 1. 2) Remove pump dampening spring. Using tweezers, remove plunger retainer and check ball. Disconnect throttle positioner link and throttle position levers, washer and spring. Remove primary and secondary main passage plugs and gaskets. Remove primary and secondary main jets and gaskets. 3) Remove auxiliary acceleration pump (AAP) housing, spring and diaphragm. Remove AAP inlet plug and check ball. Remove outlet plug, short spring and small ball. Remove primary and secondary small venturies. 4) Remove sight glass retainer, sight glass and “O” ring. Remove throttle lever return spring and back spring. Remove throttle lever and fast idle cam. 5) Disconnect link and remove secondary throttle valve diaphragm assembly and gasket. Remove throttle position switch and bracket. Remove 3 body-to-flange screws and vacuum passage screw. Separate body from flange. See Fig. 3. Remove washer from throttle valve shaft. Remove idle mixture adjusting screw and idle speed adjusting screw.

Related Content:

yhs-mystartdefault, remove center peice from 2011 toyota camry, toyota 4k carburetor manual download, 2005 tundra grill removal, how to check windshield wiper motor and arm on a 2007 malibut, how replace alternator in 2006 honda odessey, how remove intake plenum on 1998 Toyota sienna, toyota sienna grill removal, jaguar fuel hose removal, how to remove center console 2013 camry

Toyota Throttle Body Spacer Installation Instructions

0

Filed Under (Toyota Manuals) by admin on 26-11-2011

download
1. Remove Air Intake Assembly and intake box from throttle body. 2. Remove throttle linkage bracket. 3. Remove the vacuum line clip and on some models the linkage bracket. 4. Remove the nuts and studs from the throttle body. 5. Install the JET Power-Flo spacer using one gasket between the throttle body and spacer and one gasket between the spacer and the manifold with the supplied longer bolts and lock washers. 6. Install the throttle linkage extender plate and reinstall the throttle linkage bracket. On the models referenced above that have a second throttle linkage bracket, use the other extender and attach the vacuum line clip to the bottom of the extension plate. 7. Verify that the throttle linkage, cruise control and kick down cables are NOT binding and that the travel on the linkage is correct before you start the vehicle. NOTE: In some instances it may be necessary to readjust the cables for proper travel. Refer to your factory service manual for correct adjustment procedures. 8. Reinstall the Air Intake Assembly.

2001 Chevy Truck S10/ T10 Blazer Intake Manifold Replacement (Upper) Removal And Installation Manual

0

Filed Under (Chevy Manuals) by admin on 05-06-2012

download
Intake Manifold Replacement (Upper) Notes Intake Manifold Replacement – Upper Removal Procedure Important: The upper intake does not have to be removed to remove the lower intake manifold. 1. Disconnect the breather tube at the air cleaner outlet duct 2. Remove the air cleaner outlet duct retaining wingnut. 3. Disconnect the IAT sensor harness connector 4. Remove the air cleaner outlet duct from the throttle body. 5. Disconnect the accelerator cable from the throttle body 6. Remove the accelerator cable from the accelerator control cable bracket. 7. Disconnect the cruise control cable, if equipped from the throttle shaft and the accelerator cable bracket. 8. Disconnect the vacuum hose from the intake manifold for the vacuum tank. 9. Remove the power brake booster vacuum hose. 10. Disconnect the following electrical connectors: * The A/C compressor clutch (1) * The A/C compressor cutoff switch (5), if equipped * The Throttle Position (TP) sensor (2) * The Idle Air Control (IAC) motor (3) 11. Disconnect the following electrical connectors: * The fuel meter body assembly (1) * The Manifold Absolute Pressure (MAP) sensor(3) * The EVAP canister purge solenoid valve (2) 12. Remove the engine wire harness clip from the accelerator cable bracket. 13. Move the engine wiring harness aside. 14. Remove the accelerator cable bracket from the throttle body and the intake manifold. 15. Remove the accelerator and cruise control cable bracket from the throttle body. Leave the accelerator and cruise control cables on the bracket16. Remove the PCV valve hose assembly from the intake manifold and the valve rocker arm cover. 17. Remove the bracket for the engine wiring harness from the intake manifold stud. 18. Remove the fuel lines from the fuel meter body assembly. 19. Remove the EVAP canister purge solenoid valve.

Related Content:

how to change cobalt 2007 fuel tank pressure sensor, 1989 mitsubishi 3 0 throttle body vacuum connections, does replacement throttle body include tps sensor ford escape 2010, how change vacuum hose on s10, how to remove intake on a 2001 chevy s10 4 cyl

1996 Ford Taurus Transmission and Drivetrain Automatic Transmission/Transaxle Removal and installation Manual

0

Filed Under (Ford Manuals) by admin on 20-04-2012

download
REMOVAL NOTE: The oil pump and valve body are removed as an assembly. 1. Disconnect battery ground cable, then remove battery, battery tray, and remote air cleaner. 2. Position supply hoses, vacuum hoses, and wiring away from pump and valve body cover. 3. Remove shift lever. 4. On models equipped with Anti-lock Brake System (ABS) , remove splash shield cover, then disconnect brake reservoir hose and cap to prevent contamination. 5. On all models, remove EGR bracket attaching bolts, then install lifting eye. 6. Remove throttle body bracket attaching bolt, install lifting eye, then using suitable equipment support engine. 7. Remove lefthand transaxle mount. 8. Remove transaxle side pan upper attaching bolts. 9. Raise and support vehicle. 10. Remove lefthand front wheel and tire assembly. 11. Remove inner fender cover and position aside, then disconnect ride height sensor. 12. Remove rear transaxle mount attaching bolt. 13. Loosen but do not remove two lefthand subframe attaching bolts. 14. Remove two engine support mount attaching bolts. 15. Remove four lefthand engine support attaching bolts, then remove the engine support. 16. Position suitable drain pan, then remove remaining transaxle side pan attaching bolts and remove pan. 17. Using suitable screwdriver, place manual shift shaft in Park position. 18. Disconnect upper bulkhead electrical connector wiring retainer clip from valve body. 19. Disconnect electrical connectors 20. Remove valve body attaching bolts, then disengage linkage and remove valve body. NOTE: Do not remove oil pump cover attaching bolts. INSTALLATION 1. Install new pump and valve body to chain cover gasket. 2. Slide pump and valve body onto pump shaft. 3. Rotate pump and valve body assembly toward dash panel, then engage manual valve link with manual valve. 4. Slightly rotate pump and valve body assembly to engage oil pump shaft splines with oil pump rotor splines. Valve body should slide flush with chain cover. A suitable 7/8 inch deep well socket on crankshaft pulley may be required for complete engagement. 5. On models less anti-skid, if engagement is not as indicated in step 4, proceed as follows: a. Remove manual valve from valve body. b. Rotate assembly to allow full engagement, up to 360° . c. After full engagement, return assembly to installed position, then install manual valve. Zoom Sized for Print Oil Pump And Valve Body Bolt Tightening Sequence

Related Content:

can a 2002 taurus transmission be removed without removing subframe, CLEAN THROTTLE BODY CHEVY ENVOY, how to replace the bumper cover on a 1998 Isuzu Rodeo, 03 Chevy impala removing valve cover, volvo xc90 2 9 rocker cover removal, valve cover gaskets on 2002 Escape V6, Removing Valvebody on 722 6, remove 2003 taurus transmission lowering only one side subframe, how to removed a valve body from volvo s 70, how to remove valve cover 5 4 32v navigator

1995-2004 Toyota Tacoma Helix Power Tower PLUS Installation Manual

0

Filed Under (Toyota Manuals) by admin on 07-04-2012

download
1. Remove the air cleaner duct from throttle body. 2. Unbolt the throttle linkage from the intake plenum by unbolting the single 12mm-sized bolt. 3. Unbolt the lower vacuum line from intake plenum. Remove the four bolts (some models may have bolt/stud combination, either case they all need to be removed) from the intake manifold. 4. Separate throttle body from the intake plenum and remove the OE gasket. Place the Helix Power Tower PLUS (engraved side towards throttle body) with the new gaskets in between the throttle body and the intake plenum. Secure with the new longer bolts supplied with this kit. On 2003-2004 models you will need to use the longer 8mmx110mm bolts to complete the installation. Torque the assembly to 15 ft/lbs. 5. Install the throttle linkage extender plate to plenum (original stock location) with OE bolt. Please make sure the roll pin of the plate is in locator hole on plenum. Reinstall the throttle linkage to the extender plate and use the supplied hardware to secure it to the new extender plate. Torque both bolts to 10 ft/lb. 6. Install new vacuum line extender (black z-bend bracket) to original location with OE bolt and install vacuum line bracket to this extender with the supplied hardware. Torque both bolts to 8 ft/lb. (Note: it may be necessary to lengthen the linkage cable and vacuum line from the intake plenum anchor points) 7. Reinstall the air cleaner duct to the throttle body.

Related Content:

2004 buick regal throttle body removal, cleaning throttle plate 2004 supercharged grand prix gtp

Quadrajet Bushing Kit Installation Instructions

0

Filed Under (More Manuals) by admin on 27-11-2011

download
1. Remove the throttle body from the carburetor. 2. File off the end of the throttle blade screws flush with the throttle shaft. 3. Remove the throttle blade screws and blades, keeping them in order of removal. 4. Slide the throttle shaft out of the throttle body. 5. Carefully insert the bushing in the throttle body on each side of the and tap lightly with a hammer until the bushings are flush with the the throttle body. 6. Put the supplied reamer in and electric or air drill and ream the bushing making sure to keep the reamer as straight as possible. 7. Check the fit of the throttle shaft for tightness and if necessary ream the bushings a little at a time to get the best fit

Related Content:

what is the bushing for in front of the throttle body

Related Content:

iS THERE A SPRING CONNECTING THE LINKAGE TO THE TPS ON A97 LESABRE, edelbrock dubble carburetor adjustment linkage, relearn on throttle body trailblazer 2005, throttle body for a 2006 buick rendezvous, relearn procedure for throttle body 2004 chevy trailblazer, volvo penta throttle control diagram, p1512 chevy trailblazer, where is the fuel line to throttle body on a 2006 KIA RIO, lincoln ls throttle linkage, jaguar s type throttle body return spring