Komatsu PC200-8M0, PC200LC-8M0, PC220-8M0, PC220LC-8M0, PC270-8, PC270LC-8, PC228US-8, PC228USLC-8, HB205-1M0, HB215LC Operation and Maintenance Manual PEN00893-00

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: PEN00893-00
  • Format: PDF
  • Size: 2.6MB
  • Number of Pages: 53

Description

  • Model List:

    • PC200-8M0 Hydraulic Excavator
    • PC200LC-8M0 Hydraulic Excavator
    • PC220-8M0 Hydraulic Excavator
    • PC220LC-8M0 Hydraulic Excavator
    • PC270-8 Hydraulic Excavator
    • PC270LC-8 Hydraulic Excavator
    • PC228US-8 Hydraulic Excavator
    • PC228USLC-8 Hydraulic Excavator
    • HB205-1M0 Hydraulic Excavator
    • HB215LC-1M0 Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 2.1. BEFORE READING THIS MANUAL
  • 2.2. SAFETY INFORMATION
  • 2.3. PRODUCT INFORMATION
  • 2.3.1. IDENTIFICATION LABEL AND PRODUCT IDENTIFICATION NUMBER (PIN)
  • 2.4. CONTENTS
  • 3. SAFETY
  • 3.1. SAFETY LABELS
  • 3.1.1. LOCATION OF SAFETY LABELS
  • 3.1.2. SAFETY LABELS
  • 3.2. GENERAL PRECAUTIONS COMMON TO OPERATION AND MAINTENANCE
  • 3.2.1. PRECAUTIONS BEFORE STARTING OPERATION
  • 3.2.2. PREPARATIONS FOR SAFE OPERATION
  • 3.2.3. FIRE PREVENTION
  • 3.2.4. DO NOT GET CAUGHT IN QUICK COUPLER
  • 3.2.5. UNAUTHORIZED MODIFICATION
  • 3.2.6. PRECAUTIONS RELATED TO ATTACHMENTS AND OPTIONS
  • 3.3. PRECAUTIONS FOR OPERATION
  • 3.3.1. CHECKS BEFORE OPERATION
  • 3.3.2. PRECAUTIONS DURING OPERATION
  • 3.3.3. TRANSPORTATION
  • 3.4. PRECAUTIONS FOR MAINTENANCE
  • 3.4.1. PRECAUTIONS BEFORE STARTING INSPECTION AND MAINTENANCE
  • 3.4.2. PRECAUTIONS FOR INSPECTION AND MAINTENANCE
  • 3.5. PRECAUTIONS FOR MAINTENANCE
  • 3.5.1. PRECAUTIONS BEFORE STARTING INSPECTION AND MAINTENANCE
  • 3.5.2. PRECAUTIONS FOR INSPECTION AND MAINTENANCE
  • 4. OPERATION
  • 4.1. QUICK COUPLER VIEW ILLUSTRATIONS
  • 4.1.1. OVERALL QUICK COUPLER VIEW
  • 4.2. DETAILED CONTROLS AND GAUGES OF QUICK COUPLER
  • 4.2.1. SWITCHES
  • 4.2.2. CHECK VALVE
  • 4.2.3. PRESSURE REGULATOR VALVE
  • 4.3. OPERATION AND CONTROL OF QUICK COUPLER
  • 4.3.1. BEFORE STARTING ENGINE
  • 4.3.2. REMOVEL PROCEDURE FOR BUCKET OR ATTACHMENT
  • 4.3.3. INSTALLATION PROCEDURE FOR BUCKET AND ATTACHMENT
  • 4.3.4. PROHIBITED OPERATIONS
  • 4.4. LONG TERM STORAGE
  • 4.4.1. BEFORE STORAGE
  • 4.4.2. AFTER STORAGE
  • 4.5. TROUBLES AND ACTIONS
  • 4.5.1. PHENOMENA THAT ARE NOT FAILURES
  • 4.5.2. OTHER TROUBLE
  • 5. MAINTENANCE
  • 5.1. MAINTENANCE INFORMATION
  • 5.1.1. SERVICE METER READING
  • 5.1.2. KOMATSU GENUINE PRODUCTS (REPLACEMENT PARTS)
  • 5.1.3. FRESH AND CLEAN LUBRICANTS
  • 5.1.4. WELDING INSTRUCTIONS
  • 5.1.5. DO NOT DROP THINGS INSIDE MACHINE
  • 5.1.6. HYDRAULIC SYSTEM AIR BLEEDING
  • 5.1.7. HYDRAULIC HOSE INSTALLATION
  • 5.1.8. CHECKS AFTER INSPECTION AND MAINTENANCE WORKS
  • 5.2. OUTLINE OF SERVICE
  • 5.2.1. HANDING GREASE
  • 5.2.2. ELECTRIC SYSTEM MAINTENANCE
  • 5.3. RECOMMENDED LUBRICANT
  • 5.3.1. RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
  • 5.4. TIGHTENING TORQUE SPECIFICATIONS
  • 5.4.1. TIGHTENING TORQUE LIST
  • 5.5. SAFETY CRITICAL PARTS
  • 5.5.1. SAFETY CRITICAL PARTS LIST
  • 5.6. MAINTENANCE PROCEDURE
  • 5.6.1. WHEN REQUIRED
  • 5.6.2. CHECK BEFORE STARTING
  • 5.6.3. EVERY 40 HOURS MAINTENANCE
  • 6. SPECIFICATIONS
  • 6.1. SPECIFICATIONS
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC200-8M0, PC200LC-8M0, PC220-8M0, PC220LC-8M0, PC270-8, PC270LC-8, PC228US-8, PC228USLC-8, HB205-1M0, HB215LC Operation and Maintenance Manual PEN00893-00”

Your email address will not be published. Required fields are marked *