Komatsu PC60-7, PC60-7B Hydraulic Excavator Shop Manual SEBM010911

$50.00

  • Type Of Manual: Shop Manual
  • Manual ID: SEBM010911
  • Format: PDF
  • Size: 36.5MB
  • Number of Pages: 695

Description

  • Model List:

    • PC60-7 Hydraulic Excavator
    • PC60-7B Hydraulic Excavator
  • 0.1. HOW TO READ THE SHOP MANUAL
  • 0.2. HOISTING INSTRUCTIONS
  • 0.3. COATING MATERIALS
  • 0.4. STANDARD TIGHTENING TORQUE
  • 0.5. ELECTRIC WIRE CODE
  • 0.6. CONVERSION TABLE
  • 0.7. TABLE OF OIL AND COOLANT CAPACITIES
  • 1. STRUCTURE AND FUNCTION
  • 1.1. RADIATOR, OIL COOLER
  • 1.2. PTO (COUPLING)
  • 1.3. ENGINE CONTROL
  • 1.4. POWER TRAIN DIAGRAM
  • 1.5. SWING CIRCLE
  • 1.6. SWING MACHINERY
  • 1.7. TRACK FRAME
  • 1.8. IDLER CUSHION
  • 1.9. HYDRAULIC PIPING DRAWING
  • 1.10. HYDRAULIC CIRCUIT DIAGRAM
  • 1.11. HYDRAULIC TANK
  • 1.12. HYDRAULIC PUMP
  • 1.13. CONTROL VALVE
  • 1.14. SELFPRESSURE REDUCING VALVE
  • 1.15. CLSS
  • 1.16. SWING MOTOR
  • 1.17. CENTER SWIVEL JOINT
  • 1.18. TRAVEL MOTOR
  • 1.19. VALVE CONTROL
  • 1.20. WORK EQUIPMENT, SWING PPC VALVE
  • 1.21. TRAVEL PPC VALVE
  • 1.22. SERVICE PPC VALVE
  • 1.23. SOLENOID VALVE
  • 1.24. HYDRAULIC CYLINDER
  • 1.25. WORK EQUIPMENT
  • 1.26. WORK EQIPMENT PIN AUTOMATIC GREASING SYSTEM
  • 1.27. ELECTRICAL ALLOCATION DIAGRAM (1/2)
  • 1.28. ELECTRICAL ALLOCATION DIAGRAM (2/2)
  • 1.29. ELECTRICAL CIRCUIT DIAGRAM
  • 1.30. ELECTRICAL CONTROL SYSTEM
  • 1.31. MACHINE MONITOR SYSTEM
  • 2. TESTING AND ADJUSTING
  • 2.1. STANDARD VALVE TABLE FOR ENGINE RELATED PARTS
  • 2.2. STANDARD VALUE TABLE FOR CHASIS RELATED PARTS
  • 2.3. STANDARD VALUE TABLE FOR ELECTRICAL RELATED PARTS
  • 2.4. TOOLS FOR TESTING, ADJUSTING AND TROUBLESHOOTING
  • 2.5. MEASURING ENGINE SPEED
  • 2.6. MEASURING EXHAUST GAS COLOR
  • 2.7. ADJUSTING VALVE CLEARANCE
  • 2.8. MEASURING COMPRESSION PRESSURE
  • 2.9. MEASURING BLOWBY PRESSURE
  • 2.10. TESTING AND ADJUSTING FUEL INJECTION TIMING
  • 2.11. MEASURING ENGINE OIL PRESSURE
  • 2.12. TESTING AND ADJUSTING ALTERNATOR BELT TENSION
  • 2.13. ADJUSTING ENGINE STOP SOLENOID LINKAGE
  • 2.14. ADJUSTING FUEL CONTROL LINKAGE
  • 2.15. TESTING AND ADJUSTING OF HYDRUALIC PRESSURE IN WORK EQUIPMENT, SWING AND TRAVEL CIRCUITS
  • 2.16. ADJUSTING PC VALVE
  • 2.17. MEASURING LS DIFFERENTIAL PRESSURE AND ADJUSTING LS VALVE
  • 2.18. TESTING HYDRAULIC PRESSURE IN THE CONTROL CIRCUIT
  • 2.19. TESTING OUTLET PRESSURE OF SOLENOID VALVE
  • 2.20. MEASURING PPC VALVE OUTPUT PRESSURE
  • 2.21. ADJUSTING WORK EQUIPMENT AND SWING PPC VALVE
  • 2.22. TESTING TRAVEL DEVATION
  • 2.23. MEASURING OIL LEAKAGE
  • 2.24. RELEASING REMAINING PRESURE IN HYDRAULIC CIRCUIT
  • 2.25. CHECKING OF CLEARANCE OF SWING CIRCLE BEARING
  • 2.26. CHECKING AND ADJUSTING OF TRACK SHOE TENSION
  • 2.27. TESTING WEAR OF SPROKET
  • 2.28. BLEEDING AIR
  • 2.29. AUTOMATIC GREASING CONTROLLER
  • 2.30. TROUBLESHOOTING
  • 2.30.1. POINTS TO REMEMBER WHEN TROUBLESHOOTING
  • 2.30.2. SEQUENCE OF EVENTS IN TROUBLESHOOTING
  • 2.30.3. POINTS TO REMEMBER WHEN CARRING OUT MAINTENANCE
  • 2.30.4. CHECKS BEFORE TROUBLESHOOTING
  • 2.30.5. CONNECTOR TYPES AND MOUNTING LOCATIONS
  • 2.30.6. CONNECTION TABLE FOR CONNECTOR PIN NUMBERS
  • 2.30.7. METHOD OF USING JUDGEMENT TABLE
  • 2.30.8. METHOD OF USING TROUBLESHOOTING CHARTS
  • 2.30.9. FAILURE MODES AND JUDGEMENT TABLE
  • 2.30.10. TROUBLESHOOTING OF ELECTRICAL SYSTEM (E MODE)
  • 2.30.11. TROUBLESHOOTING OF ENGINE (S MODE)
  • 2.30.12. TROUBLESHOOTING OF HYDRAULIC AND MECHANICAL SYSTEM (H MODE)
  • 2.30.13. TROUBLESHOOTING OF MACHINE MONITOR SYSTEM (M MODE)
  • 2.30.14. TROUBLESHOOTING OF AUTOGREASING SYSTEM (D MODE)
  • 3. DISASSEMBLY AND ASSEMBLY
  • 3.1. METHOD OF USING MANUAL
  • 3.2. PRECAUTIONS WHEN CARRYING OUT OPERATION
  • 3.3. SPECIAL TOOL LIST
  • 3.4. SKETCHES OF SPECIAL TOOLS
  • 3.5. STARTING MOTOR
  • 3.5.1. REMOVAL AND INSTALLATION
  • 3.6. ALTERNATOR
  • 3.6.1. REMOVAL AND INSTALLATION
  • 3.7. FUEL INJECTION PUMP
  • 3.7.1. REMOVAL
  • 3.7.2. INSTALLATION
  • 3.8. WATER PUMP
  • 3.8.1. REMOVAL AND INSTALLATION
  • 3.9. NOZZLE HOLDER
  • 3.9.1. REMOVAL AND INSTALLATION
  • 3.10. THERMOSTAT
  • 3.10.1. REMOVAL AND INSTALLATION
  • 3.11. ENGINE OIL COOLER CORE
  • 3.12. ENGINE, MAIN PUMP
  • 3.12.1. REMOVAL
  • 3.12.2. INSTALLATION
  • 3.13. RADIATOR, HYDRAULIC COOLER
  • 3.13.1. REMOVAL
  • 3.13.2. INSTALLATION
  • 3.14. FUEL TANK
  • 3.14.1. REMOVAL AND INSTALLATION
  • 3.15. CENTER SWIVEL JOINT
  • 3.15.1. REMOVAL
  • 3.15.2. INSTALLATION
  • 3.15.3. DISASSEMBLY AND ASSEMBLY
  • 3.16. SPROCKET
  • 3.16.1. REMOVAL AND INSTALLATION
  • 3.17. TRAVEL MOTOR
  • 3.17.1. REMOVAL AND INSTALLATION
  • 3.18. DISASSEMBLY, ASSEMBLY OF TRAVEL MOTOR GM09VL2
  • 3.18.1. SAFETY
  • 3.18.2. SECTIONAL DRAWING, SINGLE VIEW DRAWING, AND PARTS LIST
  • 3.18.3. TOOLS
  • 3.18.4. TIGHENING TORQUE
  • 3.18.5. WEIGHT TABLE
  • 3.18.6. DISASSEMBLY
  • 3.18.7. MAINTENANCE STANDARD TABLE
  • 3.18.8. ASSEMBLY
  • 3.18.9. DIMENSIONS TABLE OF CLEARENCE ADJUSTMENT PARTS
  • 3.18.10. PERFORMANCE CONFIRMATION TEST
  • 3.19. SWING MOTOR, SWING MACHINERY
  • 3.19.1. REMOVAL AND INSTALLATION
  • 3.20. SWING MOTOR
  • 3.20.1. DISASSEMBLY
  • 3.20.2. ASSEMBLY
  • 3.21. SWING MACHINERY
  • 3.21.1. DISASSEMBLY
  • 3.21.2. ASSEMBLY
  • 3.22. REVOLVING FRAME
  • 3.22.1. REMOVAL
  • 3.22.2. INSTALLATION
  • 3.23. SWING CIRCLE
  • 3.23.1. REMOVAL AND INSTALLATION
  • 3.24. IDLER, RECOIL SPRING
  • 3.24.1. REMOVAL AND INSTALLATION
  • 3.24.2. REMOVAL AND INSTALLATION
  • 3.24.3. DISASSEMBLY
  • 3.24.4. ASSEMBLY
  • 3.25. CARRIER ROLLER
  • 3.25.1. REMOVAL AND INSTALLATION
  • 3.26. TRACK SHOE
  • 3.26.1. REMOVAL AND INSTALLATION
  • 3.27. HYDRAULIC TANK
  • 3.28. MAIN PUMP INPUT SHAFT OIL SEAL
  • 3.28.1. REMOVAL AND INSTALLATION
  • 3.29. MAIN RELIEF VALVE
  • 3.29.1. DISASSEMBLY AND ASSEMBLY
  • 3.30. SOLENOID VALVE
  • 3.30.1. REMOVAL AND INSTALLATION
  • 3.31. WORK EQUIPMENT LEFT SIDE PPC VALVE (FOR ARM, SWING CONTROL) REMOVAL AND INSTALLATION
  • 3.32. WORK EQUIPMENT RIGHT SIDE PPC VALVE (FOR BOOM, BUCKET CONTROL) REMOVAL AND INSTALLATION
  • 3.33. WORK EQUIPMENT PPC VALVE (FOR BOOM, ARM, BUCKET, SWING CONTROL PPC VALUE)
  • 3.33.1. DISASSEMBLY
  • 3.33.2. ASSEMBLY
  • 3.34. TRAVEL PPC VALVE
  • 3.34.1. REMOVAL AND INSTALLATION
  • 3.34.2. DISASSEMBLY AND ASSEMBLY
  • 3.35. BUCKET CYLINDER
  • 3.35.1. REMOVAL
  • 3.35.2. INSTALLATION
  • 3.36. BLADE CYCLINDER
  • 3.36.1. REMOVAL
  • 3.36.2. INSTALLATION
  • 3.37. HYDRAULIC CYCLINDER
  • 3.37.1. REMOVAL AND INSTALLATION
  • 3.38. OPERATORS CAB
  • 3.38.1. REMOVAL AND INSTALLATION
  • 3.39. COUNTERWEIGHT
  • 3.39.1. REMOVAL AND INSTALLATION
  • 3.40. MONITOR
  • 3.40.1. REMOVAL AND INSTALLATION
  • 3.41. SWING CONTROLLER
  • 3.41.1. REMOVAL AND INSTALLATION
  • 3.42. AUTOGREASING CONTROLLER
  • 3.42.1. REMOVAL AND INSTALLATION
  • 3.43. AUTOGREASING PUMP
  • 3.43.1. REMOVAL AND INSTALLATION
  • 4. MAINTENANCE STANDARD
  • 4.1. SWING MACHINERY
  • 4.2. SELFPRESSURE REDUCING VALVE
  • 4.3. SWING MOTOR
  • 4.4. CENTER SWIVEL JOINT
  • 4.5. WORK EQUIPMENT, SWING PPC VALVE
  • 4.6. TRAVEL PPC VALVE
  • 4.7. SERVICE PPC VALVE
  • 4.8. WORK EQUIPMENT
  • 4.9. HYDRAULIC CYCLINDER
  • 5. OTHER SPECIFICATION (PC607 (FOR NORWAY)
  • 5.1. PC607 (FOR NORWAY)
  • 5.1.1. STRUCTURE AND FUNCTION
  • 5.1.2. TESTING AND ADJUSTING
  • 5.1.3. TROUBLESHOOTING
  • 5.1.4. DISASSEMBLY AND ASSEMBLY
  • 6. OTHERS
  • 6.1. HYDRAULIC PIPING DRAWING
  • 6.2. HYDRAULIC CIRCUIT DIAGRAM
  • 6.3. OVERALL SYSTEM DIAGRAM (1/5)
  • 6.4. OVERALL SYSTEM DIAGRAM (2/5)
  • 6.5. OVERALL SYSTEM DIAGRAM (3/5)
  • 6.6. OVERALL SYSTEM DIAGRAM (4/5)
  • 6.7. OVERALL SYSTEM DIAGRAM (5/5)
  • 6.8. ELECTRICAL ALLOCATION DIAGRAM
  • 6.8.1. SERIAL NO. 52374 57999
  • 6.8.2. SERIAL NO. 58001 AND UP
  • 6.9. ELECTRIC CIRCUIT DIAGRAM
  • 6.9.1. C607 SERIAL NO. 55720 AND UP FOR NORWAY)
  • 6.10. CONNECTOR TYPES AND MOUNTING LOCATIONS
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC60-7, PC60-7B Hydraulic Excavator Shop Manual SEBM010911”

Your email address will not be published. Required fields are marked *