Description
-
Model List:
- SV08-1A Excavator
- 1. SPINE TITLE
- 2. General Cautions for Maintenance Work
- 2.1. Correct Work
- 2.2. Safety Precautions
- 2.3. Preparations
- 2.4. Cautions for Disassembly and Reassembly
- 2.5. Cautions for Removal and Installation of Hydraulic Equipment
- 2.6. Cautions for Removal and Installation of Hydraulic Piping
- 2.7. Cautions for Handling Seals
- 2.8. Correct Installation of Hydraulic Hose
- 2.9. Specifications of Hydraulic Hose
- 2.10. Air Release of Hydraulic Equipment
- 3. Technical Data
- 3.1. Specifications
- 3.2. Outline Drawing and Working Area
- 3.3. Weight List of Main Parts
- 3.4. Lifting Capacity List
- 4. Service Standards
- 4.1. Machine Performance
- 4.2. Engine
- 4.3. Undercarriage
- 4.3.1. Rubber Crawler Specifications
- 4.4. Controls
- 4.5. Hydraulic Equipment
- 4.5.1. Hydraulic Cylinders
- 4.6. Implement
- 4.6.1. Front Attachments
- 4.6.2. Blade Moving Device
- 4.6.3. Bucket Teeth
- 4.6.4. Variable Track Gauge Type
- 4.7. List of Tightening Torque
- 4.7.1. Machine
- 4.7.2. Engine
- 4.7.3. Tightening Torque for General Bolts and Nuts (Machine)
- 4.7.4. Hydraulic Hose Joint
- 5. Engine
- 5.1. Disassembly of Engine
- 5.1.1. Removing the Nozzle and Glow Plug
- 5.1.2. Removing the Cylinder Head Cover
- 5.1.3. Removing the Oil Pipe
- 5.1.4. Removing the Water Pump Assembly
- 5.1.5. Removing the Rocker Arm and Push Rods
- 5.1.6. Removing the Exhaust Manifold
- 5.1.7. Removing the Cylinder Head
- 5.1.8. Removing the Tappets
- 5.1.9. Removing the Injection Pump Assembly
- 5.2. Disassembly, Inspection and Reassembly of Main Component Parts
- 5.2.1. Cylinder Head
- 5.2.2. Rocker Arm
- 5.2.3. Cylinder Block
- 5.2.4. Piston and Piston Rings
- 5.2.5. Connecting Rod
- 5.2.6. Connecting Rod Metal
- 5.2.7. Bearing Holder
- 5.2.8. Crankshaft Bearing
- 5.2.9. Crankshaft
- 5.3. Reassembly of Engine
- 5.3.1. Crankshaft and Bearing Holder Assembly
- 5.3.2. Oil Seal and Flywheel Cover (Rear Plate)
- 5.3.3. Flywheel
- 5.3.4. Pistons and Connecting Rods
- 5.3.5. Suction Pipe and Suction Filter
- 5.3.6. Oil Pan and Front Plate
- 5.3.7. Camshaft Assembly and Plate
- 5.3.8. Idle Gear and Oil Pump Assembly
- 5.3.9. Timing Gear Case
- 5.3.10. Crankshaft Pulley
- 5.3.11. Injection Pump Assembly
- 5.3.12. Oil filter and Oil Pipe
- 5.3.13. Tappets
- 5.3.14. Cylinder Head Assembly and Cylinder Head Gasket
- 5.3.15. Caps, Push Rods and Rocker Arm Assembly
- 5.3.16. Adjusting the valve clearance
- 5.3.17. Cylinder Head Cover
- 5.3.18. Water Pump Assembly
- 5.3.19. Oil Pressure Switch
- 5.3.20. Nozzle and Holder Assembly
- 5.3.21. Return Pipes and Injection Pipes
- 5.3.22. V-belt
- 5.4. Electrical Equipment
- 5.4.1. Starter Motor
- 5.4.2. Alternator
- 5.4.3. Glow Plug
- 5.4.4. Stop Solenoid
- 5.5. Troubleshooting
- 6. Hydraulic System
- 6.1. Outline
- 6.1.1. Control Valve Operation
- 6.2. Hydraulic Circuit Schematic
- 6.3. Circuit Operation
- 6.3.1. Boom
- 6.3.2. Arm
- 6.3.3. Bucket
- 6.3.4. Swing
- 6.3.5. Boom Swing
- 6.3.6. Blade
- 6.3.7. Travel
- 6.3.8. Simultaneous Operation of Travel and Blade
- 6.3.9. Hydraulic P.T.O.
- 6.3.10. Simultaneous Operation of Boom Up and Bucket
- 6.3.11. Track Gauge Change
- 6.4. Pressure Adjustment
- 6.4.1. Relief Valves
- 6.4.2. Swing Combination Valve (Brake Valve)
- 7. Hydraulic Equipment
- 7.1. Hydraulic Pump
- 7.2. Control Valve
- 7.3. Swing motor
- 7.4. Valve Block
- 7.5. Travel Motor
- 8. Adjustment and Repair
- 8.1. Electrical Equipment of Machine
- 8.1.1. Parts Layout of Electrical Equipment
- 8.1.2. Monitor and Alarm Systems
- 8.1.3. Wiring Diagram
- 8.1.4. Circuit Description of Engine Start and Stop
- 8.1.5. Circuit Description of Battery Charging
- 8.1.6. Removal and Reinstallation of Engine
- 8.1.7. Removal and Reinstallation of Starter motor
- 8.2. Undercarriage
- 8.2.1. Outline
- 8.2.2. Points of Reassembly
- 8.2.3. Disassembly and Reassembly of Idler
- 8.2.4. Disassembly and Reassembly of Track Roller
- 8.3. Controls
- 8.3.1. Control Train
- 8.3.2. Removal and Reinstallation of Control Levers
- 8.3.3. Adjustment of Control Levers
- 8.3.4. Adjustment of Travel Levers
- 8.3.5. Adjustment of P.T.O. Pedal
- 8.3.6. Adjustment of Boom Swing Pedal
- 8.3.7. Adjustment of Blade Lever
- 8.3.8. Adjustment of Accelerator Lever (Adjustment of Engine Idling Speed)
- 8.4. Swing Bearing
- 8.4.1. Removal and Reinstallation of Swing Bearing
- 8.5. Hydraulic Equipment
- 8.5.1. Removal and Reinstallation of Hydraulic Pump
- 8.5.2. Removal and Reinstallation of Control Valve
- 8.5.3. Removal and Reinstallation of Swing Motor
- 8.5.4. Removal and Reinstallation of Swivel Joint
- 8.5.5. Disassembly and Reassembly of Swivel Joint
- 8.5.6. Disassembly and Reassembly of Hydraulic Cylinders
- 8.5.7. Removal and Reinstallation of Hydraulic Oil Tank
- 8.5.8. Piping Layout
- 8.6. ROPS Bar
- 8.6.1. Removal and Reinstallation of ROPS bar
- 8.7. Work Implements
- 8.7.1. Removal and Reinstallation of Work Implements
- 9. Periodic Inspection and Servicing
- 9.1. List of Periodic Inspection and Servicing
- 10. Fuel, Lube Oil and Grease Recommended
- 11. Troubleshooting
- 11.1. Non-Breakdowns
- 11.1.1. Natural Release of Bucket
- 11.1.2. Discontinuous Arm Movement
- 11.1.3. Drifting of Upperstructure on Quick Travel Operation
- 11.1.4. Thermal Shock of Travel Motor
- 11.1.5. Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperature Change
- 11.2. Troubleshooting
- 11.2.1. Machine and Engine
- 11.2.2. Electrical Equipment on Panel
- 12. Reference Data
- 12.1. Dimensions and Specifications for Attachment
















There are no reviews yet.