Yanmar SV100-2A (YCEE) Excavator Service Manual

$30.00

  • Type Of Manual: Service Manual
  • Number of Pages: 701
  • Size: 150.0MB
  • Format: PDF

Description

  • Model List:

    • SV100-2A (YCEE) Excavator
  • 1. General Cautions for Maintenance Work
  • 1.1. Correct Work
  • 1.2. Safety Precautions
  • 1.3. Preparations
  • 1.4. Cautions for Disassembly and Reassembly
  • 1.5. Cautions for Removal and Installation of Hydraulic Equipment
  • 1.6. Cautions for Removal and Installation of Hydraulic Piping
  • 1.7. Cautions for Handling Seals
  • 1.8. Correct Installation of Hydraulic Hose
  • 1.9. Specifications of Hydraulic Hose
  • 1.10. Air Release of Hydraulic Equipment
  • 2. Technical Data
  • 2.1. Specifications
  • 2.2. Outline Drawing and Working Area
  • 2.2.1. W/O Quick Coupler
  • 2.3. Weight List of Main Parts
  • 2.4. Lifting Capacity List
  • 2.4.1. W/O Quick Coupler
  • 2.5. Specifications for Attachment
  • 2.6. Periodic Inspection and Servicing
  • 2.7. Fuel, Lube Oil and Grease Recommended
  • 2.8. Hydraulic Circuit Schematic
  • 2.9. Wiring Diagram
  • 3. Service Standards
  • 3.1. Machine Performance
  • 3.2. Engine
  • 3.3. Undercarriage
  • 3.3.1. Rubber Crawler Specifications
  • 3.3.2. Steel Crawler Specifications
  • 3.3.3. Common Specifications of Steel Rubber Crawlers
  • 3.4. Controls
  • 3.5. Hydraulic Equipment
  • 3.5.1. Hydraulic Cylinders
  • 3.6. Implement
  • 3.6.1. Front Attachments
  • 3.6.2. Blade Moving Device
  • 3.7. List of Tightening Torque
  • 3.7.1. Machine
  • 3.7.2. Engine
  • 3.7.3. Tightening Torque for General Bolts and Nuts
  • 3.7.4. Hydraulic Fitting
  • 3.8. Pressure Adjustment
  • 3.8.1. Relief Valves
  • 3.8.2. Swing Brake Valve
  • 3.8.3. Cut-off Valve
  • 4. Engine
  • 4.1. Safety
  • 4.1.1. Safety Statements
  • 4.1.2. Safety Precautions
  • 4.2. Engine
  • 4.2.1. Before You Begin Servicing
  • 4.2.2. Special Service Tools
  • 4.2.3. Measuring Instruments
  • 4.2.4. Cylinder Head
  • 4.2.5. Measuring and Adjusting Valve Clearance
  • 4.2.6. Crankshaft and Camshaft Components
  • 4.2.7. EGR System
  • 4.3. Fuel System
  • 4.3.1. Before You Begin Servicing
  • 4.3.2. System Structure
  • 4.3.3. Fuel System Diagram
  • 4.3.4. Fuel System Components
  • 4.4. Cooling System
  • 4.4.1. Before You Begin Servicing
  • 4.4.2. Introduction
  • 4.4.3. Cooling System Diagram
  • 4.4.4. Engine Coolant Pump Components
  • 4.4.5. Engine Coolant System Check
  • 4.4.6. Engine Coolant Pump
  • 4.5. Lubrication System
  • 4.5.1. Before You Begin Servicing
  • 4.5.2. Introduction
  • 4.5.3. Lubrication System Diagram
  • 4.5.4. Checking Engine Oil Pressure
  • 4.5.5. Oil Pump Components
  • 4.6. Turbocharger
  • 4.6.1. Before You Begin Servicing
  • 4.6.2. Introduction
  • 4.6.3. Specifications
  • 4.6.4. Troubleshooting
  • 4.6.5. Turbocharger Components
  • 4.6.6. Turbocharger Component Functions
  • 4.6.7. Washing Procedure
  • 4.6.8. Periodic Inspection
  • 4.7. Starter Motor
  • 4.7.1. Before You Begin Servicing
  • 4.7.2. Introduction
  • 4.7.3. Starter Motor Specifications
  • 4.7.4. Starter Motor Troubleshooting
  • 4.7.5. Starter Motor Components
  • 4.7.6. Starter Motor
  • 4.8. Alternator
  • 4.8.1. Before You Begin Servicing
  • 4.8.2. Introduction
  • 4.8.3. Alternator Specifications
  • 4.8.4. Alternator Troubleshooting
  • 4.8.5. Alternator Components
  • 4.8.6. Alternator Wiring Diagram
  • 4.8.7. Alternator Standard Output
  • 4.8.8. Alternator
  • 4.9. Electronic Control System
  • 4.9.1. Before You Begin Servicing
  • 4.9.2. System Structure
  • 4.9.3. Electronic Engine Speed Control
  • 4.9.4. Diesel Particulate Filter (DPF)
  • 4.9.5. How to Remove and Reattach the Diesel Particulate Filter (DPF)
  • 4.9.6. SF and DPF Maintenance Kit
  • 4.9.7. Troubleshooting of electronic control system
  • 4.9.8. SMARTASSIST DIRECT (SA-D)
  • 4.9.9. Replacement of Components
  • 4.9.10. Installation Position of Sensors
  • 4.10. Electric Wiring
  • 4.10.1. Electric Wiring Precautions
  • 4.11. Failure Diagnosis
  • 4.11.1. Special Service Tools
  • 4.11.2. Tier 4 (BOSCH) Compression Inspection Procedures
  • 4.11.3. Measured Value and Troubleshooting
  • 4.11.4. Quick Reference Table for Troubleshooting
  • 5. Electric System
  • 5.1. Electric Equipment of Machine
  • 5.1.1. Parts Layout of Electrical Equipment
  • 5.1.2. LCD Monitor and Alarm Systems
  • 5.2. Circuit Description of Engine Start and Stop
  • 5.3. Engine ECU (engine controller)
  • 5.3.1. Outline
  • 5.3.2. Control Functions
  • 5.4. Hydraulic ECU (Controller)
  • 5.5. Error Code
  • 6. Hydraulic System
  • 6.1. Outline
  • 6.1.1. Control Valve Operation
  • 6.1.2. Additional Operation of Control Valve
  • 6.2. Circuit Operation
  • 6.2.1. Boom
  • 6.2.2. Arm
  • 6.2.3. Bucket
  • 6.2.4. Swing
  • 6.2.5. Boom Swing
  • 6.2.6. Blade
  • 6.2.7. Travel
  • 6.2.8. Non-deviation Travel (with Boom, Arm, Bucket or Boom Swing Operation)
  • 6.2.9. Simultaneous Operation of Boom Up and Arm Retract
  • 6.2.10. Simultaneous Operation of Boom Up and Bucket
  • 6.2.11. Simultaneous Operation of Boom Up and Swing
  • 6.2.12. Simultaneous Operation of Arm and Bucket
  • 6.2.13. Hydraulic P.T.O.
  • 6.2.14.
  • 6.2.15. Travel Alarm
  • 6.2.16. Auto Deceleration
  • 6.3. Hydraulic Pump
  • 6.3.1. Structure and Theory of Operation
  • 6.3.2. Troubleshooting
  • 6.3.3. Disassembly and Reassembly
  • 6.3.4. Service Standards
  • 6.4. Control Valve
  • 6.4.1. Main Control Valve
  • 6.4.2. Disassembly
  • 6.4.3. Cleaning
  • 6.4.4. Checking
  • 6.4.5. Reassembly
  • 6.4.6. Servicing Procedure for Relief Valve
  • 6.4.7. Installation
  • 6.4.8. Running
  • 6.4.9. Troubleshooting
  • 6.5. Pilot Valve
  • 6.5.1. Remote Control Valve
  • 6.5.2. Travel Pilot Valve
  • 6.5.3. Blade and Boom Swing Pilot Valve
  • 6.6. Swing Motor
  • 6.7. Travel Motor
  • 6.7.1. Product Overview
  • 6.7.2. External Dimensions and Circuit Diagram
  • 6.7.3. Basic Configuration and Drawing
  • 6.7.4. Operating Description
  • 6.7.5. Troubleshooting
  • 6.7.6. Service outline
  • 6.7.7. Disassembly
  • 6.7.8. Service standard
  • 6.7.9. Assembly
  • 6.7.10. Performance Confirmation Test
  • 6.8. Cutoff Valve
  • 7. Adjustment and Repair
  • 7.1. Engine and Electric Equipment
  • 7.1.1. Removal and Reinstallation of Engine
  • 7.1.2. Removal and Reinstallation of Starter Motor
  • 7.1.3. Removal and Reinstallation of Radiator and Oil cooler
  • 7.1.4. Removal and Reinstallation of Fan Belt and Compressor Driving Belt
  • 7.1.5. Removal and Reinstallation of Engine ECU
  • 7.1.6. Removal and Reinstallation of Hydraulic ECU
  • 7.1.7. Removal and Reinstallation of Diesel Particulate Filter (DPF)
  • 7.2. Undercarriage
  • 7.2.1. Outline
  • 7.2.2. Compatibility of Main Parts
  • 7.2.3. Points of Reassembly (Rubber Crawler Type)
  • 7.2.4. Points of Reassembly (Steel Crawler Type)
  • 7.2.5. Removal and Reinstallation of Crawler
  • 7.2.6. Disassembly and Reassembly of Steel Crawler
  • 7.2.7. Removal and Reinstallation of Travel Motor
  • 7.2.8. Disassembly and Reassembly of Front Idler
  • 7.2.9. Removal and Reinstallation of Adjusting Cylinder
  • 7.2.10. Disassembly and Reassembly of Track Roller
  • 7.2.11. Installation of Floating Seal
  • 7.2.12. Disassembly and Reassembly of Carrier Roller
  • 7.3. Controls
  • 7.3.1. Control Lever
  • 7.3.2. Travel Lever
  • 7.3.3. Adjustment of Lock Lever
  • 7.4. Swing Bearing
  • 7.4.1. Removal and Reinstallation of Swing Bearing
  • 7.5. Hydraulic Equipment
  • 7.5.1. Removal and Reinstallation of Hydraulic Pump
  • 7.5.2. Removal and Reinstallation of Control Valve
  • 7.5.3. Removal and Reinstallation of Remote Control Valves
  • 7.5.4. Removal and Reinstallation of Blade Pilot Valve
  • 7.5.5. Removal and Reinstallation of Travel Pilot Valve
  • 7.5.6. Removal and Reinstallation of Boom Swing Pilot Valve
  • 7.5.7. Removal and Reinstallation of Solenoid Valve
  • 7.5.8. Removal and Reinstallation of P.T.O.1 Solenoid Valve
  • 7.5.9. Removal and Reinstallation of P.T.O.2 Solenoid Valve
  • 7.5.10. Removal and Reinstallation of Line Filter
  • 7.5.11. Removal and Reinstallation of Accumulator
  • 7.5.12. Removal and Reinstallation of Swing Motor
  • 7.5.13. Removal and Reinstallation of Swivel Joint
  • 7.5.14. Disassembly and Reassembly of Swivel Joint
  • 7.5.15. Disassembly and Reassembly of Hydraulic Cylinders
  • 7.5.16. Hydraulic Oil Tank
  • 7.5.17. Piping Layout
  • 7.6. Implement
  • 7.6.1. Removal and Reinstallation of Implement
  • 7.7. Cabin
  • 7.7.1. Removal and Reinstallation of Cabin
  • 7.8. Air Conditioner
  • 7.8.1. Removal and Reinstallation of Air Conditioner
  • 8. Troubleshooting
  • 8.1. Non-breakdowns
  • 8.1.1. Natural Release of Bucket
  • 8.1.2. Discontinuous Arm Movement
  • 8.1.3. Thermal Shock of Travel Motor
  • 8.1.4. Elongation of Boom Swing Cylinder on 60 degrees Swing
  • 8.1.5. Time Lag on Travel Speed Switching
  • 8.1.6. Fluctuation in Oil Level of Hydraulic Oil Tank due to Temperature Change
  • 8.2. Quick Reference Table for Troubleshooting
  • 9. APPENDIX
  • 9.1. SV100-2A(YCEE) Wiring Diagram
  • 10. Page vierge
  • 11. Page vierge
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Yanmar SV100-2A (YCEE) Excavator Service Manual”

Your email address will not be published. Required fields are marked *