Description
-
Model List:
- ViO12-2A Excavator
- 1. FOREWORD
- 2. CONTENTS
- 3. General Cautions for Maintenance Work
- 3.1. Correct Work
- 3.2. Safety Precautions
- 3.3. Preparations
- 3.4. Cautions for Disassembly and Reassembly
- 3.5. Cautions for Removal and Installation of Hydraulic Equipment
- 3.6. Cautions for Removal and Installation of Hydraulic Piping
- 3.7. Cautions for Handling Seals
- 3.8. Correct Installation of Hydraulic Hose
- 3.9. Specifications of Hydraulic Hose
- 3.10. Air Release of Hydraulic Equipment
- 4. Technical Data
- 4.1. Specifications
- 4.2. Outline Drawing and Working Area
- 4.3. Weight List of Main Parts
- 4.4. Lifting Capacity List
- 5. Service Standards
- 5.1. Machine Performance
- 5.2. Engine
- 5.3. Undercarriage
- 5.3.1. Rubber Crawler Specifications
- 5.4. Controls
- 5.5. Hydraulic Equipment
- 5.5.1. Hydraulic Cylinders
- 5.6. Implement
- 5.6.1. Front Attachments
- 5.6.2. Blade Moving Device
- 5.6.3. Bucket Teeth
- 5.7. List of Tightening Torque
- 5.7.1. Machine
- 5.7.2. Engine
- 5.7.3. Tightening Torque for General Bolts and Nuts
- 6. Engine
- 6.1. Exploded View (General layouts of major engine components)
- 6.2. Measurement, Inspection and Adjustment
- 6.2.1. Measuring the Compression Pressure
- 6.2.2. Adjusting the Valve Clearance
- 6.2.3. Checking the V-belt Tension
- 6.2.4. Checking the Fuel Injection Valve
- 6.2.5. Checking and Adjusting Fuel Injection Timing
- 6.2.6. Adjusting the Maximum (or Minimum) Idling Speed
- 6.2.7. Checking the Cooling Water System and Radiator for Water Leakage
- 6.2.8. Checking the Sensors
- 6.3. Measurement Procedure, Service Data and Corrective Action
- 6.3.1. Cylinder Head
- 6.3.2. Cylinder Block
- 6.3.3. Valve Rocker Arm
- 6.3.4. Piston and Piston Rings
- 6.3.5. Connecting Rod
- 6.3.6. Cam shaft
- 6.3.7. Crank shaft
- 6.3.8. Gears
- 6.3.9. Trochoid Pump
- 6.4. Precautions for Reassembly
- 6.5. Electrical Equipment
- 6.5.1. Starter Motor
- 6.5.2. Alternator
- 7. Electric System
- 7.1. Parts Layout of Electrical Equipment
- 7.1.1. Electrical Equipment and Electric Wiring
- 7.2. Monitor and Alarm Systems
- 7.2.1. Part Name
- 7.2.2. Performances of Alarm Sensors
- 7.2.3. Operation of Alarm Sensors
- 7.2.4. Inspection of Electrical Equipment
- 7.3. Wiring Diagram
- 7.4. Circuit Description of Engine Start and Stop 5-4-1 Start Engine
- 7.4.1. Start Engine
- 7.4.2. Engine Stop
- 7.4.3. Battery Charge
- 7.4.4. Failure in Battery Charge
- 8. Hydraulic System
- 8.1. Outline
- 8.1.1. Control Valve Operation
- 8.2. Hydraulic Circuit Schematic
- 8.3. Circuit Operation
- 8.3.1. Boom
- 8.3.2. Arm
- 8.3.3. Bucket
- 8.3.4. Swing
- 8.3.5. Boom Swing
- 8.3.6. Blade
- 8.3.7. Travel
- 8.3.8. Track Gauge Change
- 8.3.9. Simultaneous Operation of Travel and Blade
- 8.3.10. Simultaneous Operation of Boom Up and Bucket
- 8.3.11. Hydraulic P.T.O.
- 8.3.12. Safety Lock
- 8.4. Pressure Adjustment
- 8.4.1. System Relief Valves
- 8.4.2. Circuit Relief Valves
- 8.4.3. Swing Brake Valve
- 8.4.4. Cut-Off Valve
- 8.5. Hydraulic Pump
- 8.6. Control Valve
- 8.7. Pilot Valve
- 8.8. Cut-off Valve
- 8.9. Swing Motor
- 8.10. Travel Motor
- 8.11. Solenoid Valve
- 9. Adjustment and Repair
- 9.1. Engine of machine
- 9.1.1. Removal and Reinstallation of Engine
- 9.1.2. Removal and Reinstallation of Starter Motor
- 9.1.3. Removal and Reinstallation of Fuel Injection Pump
- 9.1.4. Removal and Reinstallation of Fuel Tank
- 9.1.5. Removal and Reinstallation of Radiator
- 9.2. Undercarriage
- 9.2.1. Outline
- 9.2.2. Points of Reassembly
- 9.2.3. Removal and Reinstallation of Crawler
- 9.2.4. Disassembly and Reassembly of Idler
- 9.2.5. Disassembly and Reassembly of Track Roller
- 9.2.6. Removal and Reinstallation of Track Gauge Change Cylinder
- 9.3. Controls
- 9.3.1. Control Train
- 9.3.2. Mechanical Control Linkage
- 9.3.3. Adjustment of Travel and Blade Levers
- 9.3.4. Adjustment of Boom Swing and P.T.O. Pedals and P.T.O. Pedal Lock
- 9.3.5. Adjustment of Lock Lever Switch
- 9.3.6. Adjustment of Travel Lever Lock
- 9.3.7. Adjustment of Accelerator Lever
- 9.4. Swing Bearing
- 9.4.1. Removal and Reinstallation of Swing Bearing
- 9.5. Hydraulic Equipment
- 9.5.1. Removal and Reinstallation of Hydraulic Oil Tank
- 9.5.2. Removal and Reinstallation of Control Valve
- 9.5.3. Removal and Reinstallation of Swing Motor
- 9.5.4. Removal and Reinstallation of Swivel Joint
- 9.5.5. Disassembly and Reassembly of Swivel Joint
- 9.5.6. Disassembly and Reassembly of Hydraulic Cylinders
- 9.5.7. Removal and Reinstallation of Boom Swing Cylinder
- 9.5.8. Removal and Reinstallation of Hydraulic Oil Tank
- 9.5.9. Piping Layout
- 9.6. Implement
- 9.6.1. Removal and Reinstallation of Implement
- 10. Periodic Inspection and Servicing
- 10.1. List of Periodic Inspection and Servicing
- 11. Fuel, Lube Oil and Grease Recommended
- 12. Troubleshooting
- 12.1. Non-Breakdowns
- 12.1.1. Natural Release of Bucket
- 12.1.2. Discontinuous Arm Movement
- 12.1.3. Drifting of Upperstructure on Quick Travel Operation
- 12.1.4. Thermal Shock of Travel Motor
- 12.1.5. Change of Blade Speed in Loaded Condition
- 12.1.6. Time Lag on Travel Speed Switching
- 12.1.7. Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperature Change
- 12.2. Troubleshooting
- 12.2.1. Machine and Engine
- 12.2.2. Electrical Equipment on Panel
- 13. Reference Data
- 13.1. Specifications for Attachment
















There are no reviews yet.