Yanmar ViO27-2, ViO35-2 (US) Excavator Service Manual

$30.00

  • Type Of Manual: Service Manual
  • Number of Pages: 584
  • Size: 48.6MB
  • Format: PDF

Description

  • Model List:

    • ViO27-2, ViO35-2 (US) Excavator
  • 1. FOREWORD
  • 2. CONTENTS
  • 3. CHAPTER 1 GENERAL CAUTIONS FOR MAINTENANCE WORK
  • 3.1. Correct Work
  • 3.2. Safety Precautions
  • 3.3. Preparations
  • 3.4. Cautions for Disassembly and Reassembly
  • 3.5. Cautions for Removal and Installation of Hydraulic Equipment
  • 3.6. Cautions for Removal and Installation of Hydraulic Piping
  • 3.7. Cautions for Handling Seals
  • 3.8. Correct Installation of Hydraulic Hose
  • 3.9. Specifications of Hydraulic Hose
  • 3.10. Air Release of Hydraulic Equipment
  • 4. CHAPTER 2 TECHNICAL DATA
  • 4.1. Specifications
  • 4.2. Outline Drawing and Working Area
  • 4.2.1. Canopy type
  • 4.2.2. Cabin type
  • 4.3. Weight List of Main Parts
  • 4.4. Lifting Capacity List
  • 5. CHAPTER 3 SERVICE STANDARDS
  • 5.1. Machine Performance
  • 5.2. Engine
  • 5.3. Undercarriage
  • 5.3.1. Rubber Crawler Specifications
  • 5.3.2. Steel Crawler Specifications
  • 5.3.3. Common Specifications of Steel Rubber Crawlers
  • 5.4. Controls
  • 5.5. Hydraulic Equipment
  • 5.5.1. Hydraulic Cylinders
  • 5.6. Implement
  • 5.6.1. Front Attachments
  • 5.6.2. Blade Moving Device
  • 5.6.3. Bucket Teeth
  • 5.7. List of Tightening Torque
  • 5.7.1. Machine
  • 5.7.2. Engine
  • 5.7.3. Tightening Torque for General Bolts and Nuts
  • 6. CHAPTER 4 ENGINE
  • 6.1. Measurement, Inspection and Adjustment
  • 6.1.1. Measuring the Compression Pressure
  • 6.1.2. Adjusting the Valve Clearance
  • 6.1.3. Checking the V-belt Tension
  • 6.1.4. Checking the Fuel Injection Valve
  • 6.1.5. Checking and adjusting the Fuel Injection Timing
  • 6.1.6. Adjusting the Maximum (or Minimum) Idling Speed
  • 6.1.7. Checking the Cooling Water System and Radiator for Water Leakage
  • 6.1.8. Checking the Sensors
  • 6.2. Measurement Procedure, Service Data and Corrective Action
  • 6.2.1. Cylinder Head
  • 6.2.2. Cylinder Block
  • 6.2.3. Valve Rocker Arm
  • 6.2.4. Piston and Piston Rings
  • 6.2.5. Connecting Rod
  • 6.2.6. Cam shaft
  • 6.2.7. Crank shaft
  • 6.2.8. Gears
  • 6.2.9. Trochoid Pump
  • 6.3. Precautions for Reassembly
  • 6.4. Fuel Injection System
  • 6.4.1. Fuel Injection Pump
  • 6.4.2. Fuel Injection Valve
  • 6.4.3. Governor Mechanism
  • 6.4.4. Specifications of Fuel Injection Pump
  • 6.5. Electrical Equipment
  • 6.5.1. Starter Motor
  • 6.5.2. Alternator
  • 6.5.3. Air Heater
  • 7. CHAPTER 5 HYDRAULIC SYSTEM
  • 7.1. Outline
  • 7.1.1. Control Valve Operation
  • 7.1.2. Additional Operation of Control Valve
  • 7.2. Hydraulic Circuit Schematic
  • 7.2.1. Quick Coupler
  • 7.2.2. W/O Quick Coupler
  • 7.3. Circuit Operation
  • 7.3.1. Boom
  • 7.3.2. Arm
  • 7.3.3. Bucket
  • 7.3.4. Swing
  • 7.3.5. Boom Swing
  • 7.3.6. Blade
  • 7.3.7. Travel
  • 7.3.8. Non-Deviation Travel (with Boom, Arm, Bucket or Boom Swing Operation)
  • 7.3.9. Simultaneous Operation of Boom Up and Arm Retract
  • 7.3.10. Simultaneous Operation of Boom Up and Bucket
  • 7.3.11. Simultaneous Operation of Arm and Bucket
  • 7.3.12. Simultaneous Operation of Boom Up and Swing
  • 7.3.13. Hydraulic P.T.O.
  • 7.3.14. Quick Coupler
  • 7.4. Pressure Adjustment
  • 7.4.1. Relief Valves
  • 7.4.2. Swing Brake Valve
  • 7.4.3. Cut-Off Valve
  • 8. CHAPTER 6 HYDRAULIC EQUIPMENT
  • 8.1. Hydraulic Pump
  • 8.1.1. ViO27-2
  • 8.1.2. ViO35-2
  • 8.2. Control Valve
  • 8.3. Pilot Valve
  • 8.4. Swing Motor
  • 8.5. Travel Motor
  • 8.5.1. ViO27-2
  • 8.5.2. ViO35-2
  • 8.6. Pilot Check Valve (Quick Coupler Type)
  • 9. CHAPTER 7 ADJUSTMENT AND REPAIR
  • 9.1. Electrical Equipment of Machine and Engine
  • 9.1.1. Parts Layout of Electrical Equipment
  • 9.1.2. Monitor and Alarm Systems
  • 9.1.3. Wiring Diagram
  • 9.1.4. Circuit Description of Engine Start and Stop, and Battery Charging
  • 9.1.5. Removal and Reinstallation of Engine
  • 9.1.6. Removal and Reassembly of Starter Motor
  • 9.1.7. Removal and Reinstallation of Fuel Injection Pump
  • 9.2. Undercarriage
  • 9.2.1. Outline
  • 9.2.2. Major Parts
  • 9.2.3. Points of Reassembly (Rubber Crawler Models)
  • 9.2.4. Points of Reassembly (Steel Crawler Models)
  • 9.2.5. Removal and Reinstallation of Crawler
  • 9.2.6. Removal and Reinstallation of Travel Motor
  • 9.2.7. Disassembly and Reassembly of Idler
  • 9.2.8. Disassembly and Reassembly of Track Roller
  • 9.2.9. Disassembly and Reassembly of Carrier Roller
  • 9.2.10. Installation of Floating Seal
  • 9.2.11. Drawings of Jigs
  • 9.3. Controls
  • 9.3.1. Control Train
  • 9.3.2. Mechanical Control Linkage
  • 9.3.3. Adjustment of Travel Levers
  • 9.3.4. Adjustment of Boom Swing Pedal
  • 9.3.5. Adjustment of Blade Control Lever
  • 9.3.6. Adjustment of Lock Lever
  • 9.3.7. Adjustment Procedure of Travel Alarm Switch
  • 9.3.8. Adjustment Procedure of P.T.O. Pedal
  • 9.3.9. Adjustment Procedure of P.T.O. Pedal Lock
  • 9.3.10. Adjustment of Accelerator Lever
  • 9.4. Swing Bearing
  • 9.5. Hydraulic Equipment
  • 9.5.1. Removal and Reinstallation of Hydraulic Pump
  • 9.5.2. Removal and Reinstallation of Control Valve
  • 9.5.3. Removal and Reinstallation of Swing Motor
  • 9.5.4. Removal and Reinstallation of Swivel Joint
  • 9.5.5. Disassembly and Reassembly of Swivel Joint
  • 9.5.6. Disassembly and Reassembly of Hydraulic Cylinders
  • 9.5.7. Hydraulic Oil Tank
  • 9.5.8. Piping Layout
  • 9.6. Work Implements
  • 9.6.1. Removal and Reinstallation of Work Implements
  • 9.6.2. Quick Coupler
  • 9.7. Cabin
  • 9.7.1. Cabin
  • 9.8. New Cabin
  • 9.8.1. Cabin
  • 10. CHAPTER 8 PERIODIC INSPECTION AND SERVICING
  • 10.1. List of Periodic Inspection and Servicing
  • 11. CHAPTER 9 FUEL, LUBE OIL AND GREASE RECOMMENDED
  • 11.1. Fuel, Lube Oil and Grease Recommended
  • 12. CHAPTER 10 TROUBLESHOOTING
  • 12.1. Non-Breakdowns
  • 12.1.1. Natural Release of Bucket
  • 12.1.2. Discontinuous Arm Movement
  • 12.1.3. Drifting of Upperstructure on Quick Travel Operation
  • 12.1.4. Thermal Shock of Travel Motor
  • 12.1.5. Elongation of Boom Swing Cylinder on 75 degrees Swing
  • 12.1.6. Telescopic Motion of Boom Swing Cylinder with Lock Lever Set to Lock Position
  • 12.1.7. Time Lag on Travel Speed Switching
  • 12.1.8. Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperature Change
  • 12.1.9. Operation of Quick Coupler Cylinder (for Quick Coupler Type)
  • 12.2. Troubleshooting
  • 12.2.1. Machine and Engine
  • 12.2.2. Electrical Equipment on Panel
  • 13. CHAPTER 11 REFERENCE DATA
  • 13.1. Specifications for Attachment
  • 14. SPINE TITLE
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Yanmar ViO27-2, ViO35-2 (US) Excavator Service Manual”

Your email address will not be published. Required fields are marked *