Description
-
Model List:
- ViO50-1 Excavator
- 1. Vio50-1
- 2. FOREWORD
- 3. CONTENTS
- 4. GENERAL CAUTIONS FOR MAINTENANCE WORK
- 4.1. Correct Work
- 4.2. Safety Precautions
- 4.3. Preparations
- 4.4. Cautions for Disassembly and Reassembly
- 4.5. Cautions for Removal and Installation of Hydraulic Equipment
- 4.6. Cautions for Removal and Installation of Hydraulic Piping
- 4.7. Cautions for Handling Seals
- 4.8. Correct Installation of Hydraulic Hose
- 4.9. Specifications of Hydraulic Hose
- 4.10. Air Release of Hydraulic Equipment
- 5. TECHNICAL DATA
- 5.1. Specifications
- 5.2. Machine Dimensions and Working Ranges
- 5.2.1. Canopy Type
- 5.2.2. Cabin Type
- 5.3. Component Weights
- 5.4. Lifting Capacities
- 6. SERVICING STANDARDS
- 6.1. Machine Performance
- 6.2. Engine
- 6.3. Undercarriage
- 6.3.1. Rubber Crawler Specifications
- 6.3.2. Steel Crawler Specifications
- 6.3.3. Common Specifications of Steel  Rubber Crawlers
- 6.4. Controls
- 6.5. Hydraulic Equipment
- 6.5.1. Hydraulic Cylinder
- 6.6. Work Implements
- 6.6.1. Front Attachments
- 6.6.2. Blade Moving Device
- 6.6.3. Bucket Teeth
- 6.7. List of Tightening Torque
- 6.7.1. Machine
- 6.7.2. Engine
- 6.7.3. Tightening Torque for General Bolts and Nuts
- 7. ENGINE
- 7.1. Cylinder Block
- 7.2. Cylinder Head
- 7.3. Piston and Piston Pin
- 7.4. Connecting Rod
- 7.5. Crankshaft and Main Bearing
- 7.6. Camshaft and Tappets
- 7.7. Timing Gear
- 7.8. Service Data
- 7.9. Cooling System
- 7.10. Lubrication System
- 7.11. Fuel Supply System
- 7.12. Starter Motor
- 7.13. Alternator
- 7.14. Starting Aids
- 7.15. Adjustment of Engine Output
- 8. HYDRAULIC SYSTEM
- 8.1. Outline
- 8.1.1. Control Valve Operation
- 8.1.2. Additional Operation of Control Valve
- 8.2. Hydraulic Circuit Schematic
- 8.2.1. Standard Specifications
- 8.3. Circuit Operation
- 8.3.1. Boom
- 8.3.2. Arm
- 8.3.3. Bucket
- 8.3.4. Swing
- 8.3.5. Boom Swing
- 8.3.6. Blade
- 8.3.7. Travel
- 8.3.8. Simultaneous Operation of Travel and Boom/Bucket
- 8.3.9. Simultaneous Operation of Travel and Arm/Boom Swing
- 8.3.10. Simultaneous Operation of Boom Up and Arm Retract
- 8.3.11. Simultaneous Operation of Boom Up and Bucket
- 8.3.12. Simultaneous Operation of Boom Up and Swing
- 8.3.13. Simultaneous Operation of Arm and Bucket
- 8.3.14. Hydraulic P.T.O.
- 8.4. Pressure Adjustment
- 8.4.1. Relief Valves
- 8.4.2. Swing Brake Valve
- 8.4.3. Cut-off Valve
- 9. HYDRAULIC EQUIPMENT
- 9.1. Hydraulic Pump
- 9.2. Control Valve
- 9.3. Pilot Valve
- 9.4. Swing Motor
- 9.5. Travel Motor
- 10. ADJUSTMENT AND REPAIR
- 10.1. Electric Equipment of the Machine
- 10.1.1. Parts Layout of Electrical Equipment and Heater
- 10.1.2. Monitor and Alarm Systems
- 10.1.3. Wiring Diagram
- 10.2. Undercarriage
- 10.2.1. Outline
- 10.2.2. Major Parts
- 10.2.3. Points of Reassembly (Rubber Crawler Models)
- 10.2.4. Points of Reassembly (Steel Crawler Models)
- 10.2.5. Disassembly and Reassembly of Idler
- 10.2.6. Disassembly and Reassembly of Track Roller
- 10.2.7. Disassembly and Reassembly of Carrier Roller
- 10.2.8. Installation of Floating Seal
- 10.2.9. Drawings of Jigs
- 10.3. Controls
- 10.3.1. Control Train
- 10.3.2. Mechanical Control Linkage
- 10.3.3. Adjustment of Implement Control Levers
- 10.3.4. Adjustment of Travel Levers
- 10.3.5. Adjustment of 2-Speed Pedal
- 10.3.6. Adjustment of Boom Swing Pedal
- 10.3.7. Adjustment of Blade Control Lever
- 10.3.8. Adjustment of Lock Lever
- 10.3.9. Adjustment of Accelerator Lever
- 10.4. Swing Bearing
- 10.5. Hydraulic Equipment
- 10.5.1. Removal and Reinstallation (RR) of Hydraulic Pump
- 10.5.2. Disassembly and Reassembly of Hydraulic Cylinder
- 10.5.3. Swivel Joint
- 10.5.4. Hydraulic Oil Tank
- 10.5.5. Piping Layout
- 10.6. Engine Hood and Cabin
- 10.6.1. Engine Hood
- 10.6.2. Cabin
- 11. PERIODIC INSPECTION AND SERVICING
- 11.1. List of Periodic Inspection and Servicing
- 12. FUELLUBE OIL AND GREASE RECOMMENDED
- 12.1. FuelLube Oil and Grease Recommended by Yanmar
- 13. TROUBLESHOOTING
- 13.1. Non-breakdowns
- 13.1.1. Natural Release of Bucket
- 13.1.2. Discontinuous Arm Movement
- 13.1.3. Drifting of Upperstructure on Quick Travel Operation
- 13.1.4. Thermal Shock of Travel Motor
- 13.1.5. Elongation of Boom Swing Cylinder on 70 degrees Swing
- 13.1.6. Telescopic Motion of Boom Swing Cylinder with Lock Lever Set to Lock Position
- 13.1.7. Time Lag on Travel Speed Switching
- 13.1.8. Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperture Change
- 13.2. Troubleshooting
- 13.2.1. Machine and Engine
- 13.2.2. Electrical Equipment on Panel
- 14. REFERENCE DATA
- 14.1. Specifications for Attachment
















There are no reviews yet.