Komatsu PC128UU-1, PC128US-1 Hydraulic Excavator Shop Manual SEBM009805

$50.00

  • Type Of Manual: Shop Manual
  • Manual ID: SEBM009805
  • Format: PDF
  • Size: 62.5MB
  • Number of Pages: 794

Description

  • Model List:

    • PC128UU-1 Hydraulic Excavator
    • PC128US-1 Hydraulic Excavator
  • 1. COVER
  • 2. CONTENTS
  • 3. GENERAL
  • 3.1. GENERAL ASSEMBLY DRAWING
  • 3.2. SPECIFICATIONS
  • 3.3. WEIGHT TABLE
  • 3.4. LIST OF LUBRICANTS AND WATER
  • 4. STRUCTURE AND FUNCTION
  • 4.1. RADIATOR AND OIL COOLER
  • 4.2. PTO (COUPLING)
  • 4.3. ENGINE CONTROL
  • 4.4. POWER TRAIN SYSTEM
  • 4.5. SWING CIRCLE
  • 4.6. SWING MACHINERY
  • 4.7. TRACK FRAME
  • 4.8. IDLER CUSHION
  • 4.9. TRACK SHOE
  • 4.10. HYDRAULIC PIPING DRAWING
  • 4.11. HYDRAULIC CIRCUIT DIAGRAM
  • 4.12. CENTER SWIVEL JOINT
  • 4.13. VALVE CONTROL
  • 4.14. PPC VALVE
  • 4.15. PPC SHUTTLE AND TRAVEL JUNCTION VALVE
  • 4.16. EPC SOLENOID VALVE
  • 4.17. BOOM HOLDING VALVE
  • 4.18. WORK EQUIPMENT
  • 4.19. AIR CONDITIONER
  • 4.20. ACTUAL ELECTRICAL WIRING DIAGRAM
  • 4.21. ELECTRONIC CIRCUIT DIAGRAM
  • 4.22. ELECTRONIC CONTROL SYSTEM
  • 4.23. MACHINE MONITORING SYSTEM
  • 5. TESTING AND ADJUSTING
  • 5.1. STANDARD VALUE TABLE FOR ENGINE RELATED PARTS
  • 5.2. STANDARD VALUE TABLE FOR CHASSIS RELATED PARTS
  • 5.3. STANDARD VALUE TABLE FOR ELECTRICAL RELATED PARTS (EXCEPT AUTOMATIC HORIZONTAL DIGGING MACHINE)
  • 5.4. STANDARD VALUE TABLE FOR ELECTRICAL RELATED PARTS
  • 5.5. TOOLS FOR TESTING, ADJUSTING AND TROUBLESHOOTING
  • 5.6. MEASURING ENGINE SPEED
  • 5.7. MEASURING EXHAUST COLOR
  • 5.8. ADJUSTMENT VALVE CLEARANCE
  • 5.9. MEASUREMENT BLOWBY PRESSURE
  • 5.10. MEASUREMENT ENGINE OIL PRESSURE
  • 5.11. TESTING AND ADJUSTMENT OF FUEL INJECTION TIMING
  • 5.12. TESTING AND ADJUSTING AIR CONDITIONER COMPRESSOR BELT TENSION
  • 5.13. ADJUSTING ENGINE SPEED SENSOR
  • 5.14. ADJUSTING FUEL CONTROL CABLE
  • 5.15. ADJUSTING FUEL CONTROL CABLE
  • 5.16. ADJUSTING ENGINE STOP SOLENOID LINKAGE
  • 5.17. TESTING AND ADJUSTING HYDRAULIC PRESSURE IN WORK EQUIPMENT, SWING, TRAVEL CIRCUIT
  • 5.18. TESTING AND ADJUSTING OUTPUT PRESSURE OF PC VALVE (SERVO PISTON INPUT PRESSURE)
  • 5.19. TESTING AND ADJUSTING LS VALVE OUTPUT PRESSURE (SERVO PISTON INPUT PRESSURE) AND LS DIFFERENTIAL PRESSURE
  • 5.20. TESTING AND ADJUSTING CONTROL PUNP CIRCUIT OIL PRESSURE
  • 5.21. TESTING SOLENOID VALVE OUTPUT PRESSURE
  • 5.22. MEASURING PPC VALVE OUTPUT PRESSURE AND TESTING PPC SHUTTLE VALVE
  • 5.23. ADJUSTING WORK EQUIPMENT, SEING PPC VALVE
  • 5.24. TESTING AND ADJUSTING TRAVEL DEVIATION
  • 5.25. CHECKING LOCATION OF CAUSE OF HYDRAULIC DRIFT OF WORK EQUIPMENT
  • 5.26. MEASUREMENT OIL LEAKAGE OF SWING, TRAVEL MOTOR
  • 5.27. RELEASING REMAINING PRESSURE IN HYDRAULIC CIRCUIT
  • 5.28. TESTING CLEARANCE OF SWING CIRCLE BEARING
  • 5.29. TESTING AND ADJUSTING TRACK SHOE TENSION
  • 5.30. BLEEDING AIR
  • 5.31. PROCEDURE FOR RESETTING ELECTRICAL SYSTEM AND CHECKING OPERATION
  • 5.32. PROCEDURE FOR REPLACING POTENTIOMETER
  • 5.33. PREOCEDURE FOR CHECKING DIODE
  • 5.34. TROUBLESHOOTING
  • 6. DISASSEMBLY AND ASSEMBLY
  • 6.1. METHOD OF USING MANUAL
  • 6.2. PRECAUTIONS WHEN CARRYING OUT OPERATION
  • 6.3. SPECIAL TOOL LIST
  • 6.4. SKECHES OF SPECIAL TOOLS
  • 6.5. STARTING MOTOR
  • 6.6. ALTERNATOR
  • 6.7. ENGINE OIL COOLER
  • 6.8. FUEL INJECTION PUMP
  • 6.9. WATER PUMP
  • 6.10. NOZZLE HOLDER
  • 6.11. TURBOCHARGER
  • 6.12. THERMOSTAT
  • 6.13. CYLINDER HEAD
  • 6.14. ENGINE, MAIN PUMP
  • 6.15. RADIATOR, HYDRAULIC COOLER
  • 6.16. FUEL TANK
  • 6.17. CENTER SWIVEL JOINT
  • 6.18. SPROCKET
  • 6.19. TRAVEL MOTOR
  • 6.20. SWING MOTOR, SWINMG MACHINERY
  • 6.21. SWING MACHINERY
  • 6.22. SWING MOROR
  • 6.23. REVOLVING FRAME
  • 6.24. SWING CIRCLE
  • 6.25. IDLER, RECOIL SPRING
  • 6.26. CARRIER ROLLER
  • 6.27. SEEEL SHOE RUBBER PAD SHOE, LOAD LINER
  • 6.28. INTEGRATED RUBBER SHOE
  • 6.29. HYDRAULIC TANK
  • 6.30. PCEPC, LSEPC VALVE
  • 6.31. PC VALVE
  • 6.32. LS VALVE
  • 6.33. LS SELSECT VALVE
  • 6.34. LS SHUTTLE VALVE
  • 6.35. PRESSURE COMPENSATION VALVE
  • 6.36. MAIN RELIEF VALVE
  • 6.37. SOLENOID VALVE
  • 6.38. WORK EQUIPMENT LH.PPC VALVE (ARM, SWING)
  • 6.39. WORK EAUIPMENT R.H. PPC VALVE (BOOM, BUCKET)
  • 6.40. WORK EQUIPMENT PPC VALVE (BOOM, BUCKET, ARM, SWING)
  • 6.41. TRAVEL PPC VALVE
  • 6.42. PPC VALVE FPR OFFSET CONTROL
  • 6.43. BLADE PPC VALVE
  • 6.44. BOOM LOCK VALVE
  • 6.45. BUCKET CYLINDER
  • 6.46. OFFSET CYLINDER
  • 6.47. BLADE CYLINDER
  • 6.48. HYDRAULIC CYLINDER
  • 6.49. AIR CONDITIONER COMPRESSOR
  • 6.50. AIR CONDENSER
  • 6.51. COUNTERWEIGHT
  • 6.52. CONTROLLER
  • 6.53. MONITOR
  • 6.54. CAR COOLER UNIT
  • 7. MAINTENANCE STANDARD
  • 7.1. SWING MACHINERY
  • 7.2. CENTER SWIVEL JOINT
  • 7.3. PPC VALVE
  • 7.4. PPC SHUTTLETRAVEL JUNCTION VALVE
  • 7.5. EPC SOLENOID VALVE
  • 7.6. BOOM HOLDING VALVE
  • 7.7. HYDRAULIC CYLINDER
  • 7.8. WORK EQUIPMENT
  • 7.9. DIMENSION OF WORK EQUIPMENT
  • 8. OTHERS
  • 8.1. HYDRAULIC PIPING DRAWING
  • 8.2. MACHINE EQUIPMENT WITH AUTOMATIC HORIZONTAL EXCAVATION CONTROL (PC128UU1)
  • 8.3. HYDRAUIC CIRCUIT DIAGRAM (PC128UU1)
  • 8.4. MACHINE EQUIPMENT WITH AUTOMATIC HORIZONTAL EXCAVATION CONTROL (PC128UU1)
  • 8.5. CLSS
  • 8.6. ACTUAL ELECTRICAL WIRING DIAGRAM (PC128UU1)
  • 8.7. ELECTRICAL CIRCUIT DIAGRAM (PC128UU1)
  • 8.8. ELECTRONIC CONTRAL SYSTEM
  • 8.9. HYDRAUIC CIRCUIT DIAGRAM (PC128US1)
  • 8.10. ELECTRICAL CIRCUIT DIAGRAM (PC128US1)
  • 8.11. CONNECTOR ARRANGEMENT DIAGRAM
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC128UU-1, PC128US-1 Hydraulic Excavator Shop Manual SEBM009805”

Your email address will not be published. Required fields are marked *