Komatsu PC20R-8, PC27R-8 Hydraulic Excavator Operation and Maintenance Manual WEAM000100

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: WEAM000100
  • Format: PDF
  • Size: 6.5MB
  • Number of Pages: 184

Description

  • Model List:

    • PC20R-8 Hydraulic Excavator
    • PC27R-8 Hydraulic Excavator
  • 1. TABLE OF CONTENTS
  • 2. PREMESSA.tps.pdf
  • 2.1. FOREWORD
  • 2.2. INFORMATION ON SAFETY
  • 2.3. INTRODUCTION
  • 2.3.1. INTENDED USES
  • 2.3.2. IMPROPER OR UNAUTHORIZED USES
  • 2.3.3. MAIN CHARACTERISTICS
  • 2.3.4. RUNNINGIN
  • 2.3.5. PRODUCT IDENTIFICATION
  • 2.3.6. MACHINE SERIAL NUMBER
  • 2.3.7. MACHINE IDENTIFICATION PLATE
  • 2.3.8. ENGINE SERIAL NUMBER
  • 2.3.9. TRAVEL REDUCTION GEAR SERIAL NUMBER
  • 2.3.10. SWING MOTOR SERIAL NUMBER (for PC20R only)
  • 2.3.11. SWING REDUCTION GEAR SERIAL NUMBER (for PC27R only)
  • 2.3.12. CAB SERIAL NUMBER
  • 2.3.13. SERIAL NUMBERS AND DEALERS ADDRESS
  • 3. SICUREZ.tps.pdf
  • 3.1. GENERAL PRECAUTIONS
  • 3.1.1. GENERAL SAFETY RULES
  • 3.1.2. SAFETY DEVICES AND GUARDS
  • 3.1.3. CLOTHING AND PERSONAL PROTECTION ITEMS
  • 3.1.4. UNAUTHORIZED MODIFICATIONS
  • 3.1.5. LEAVING THE OPERATORS SEAT
  • 3.1.6. GETTING ON AND OFF THE MACHINE
  • 3.1.7. PREVENTING FIRES DUE TO FUEL AND OIL
  • 3.1.8. PREVENTING BURNS
  • 3.1.9. PREVENTING DAMAGE DUE TO ASBESTOS POWDER
  • 3.1.10. PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT
  • 3.1.11. FIRE EXTINGUISHERS AND FIRST AID KIT
  • 3.1.12. PRECAUTIONS CONCERNING THE CAB STRUCTURE
  • 3.1.13. PRECAUTIONS CONCERNING THE EQUIPMENT
  • 4. PRECAUZ.tps.pdf
  • 4.1. PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE
  • 4.1.1. SAFETY ON THE WORK SITE
  • 4.1.2. FIRE PREVENTION
  • 4.1.3. PRECAUTIONS TO BE TAKEN FOR THE OPERATORS CAB
  • 4.1.4. ROOM VENTILATION
  • 4.1.5. PRECAUTIONS TO BE TAKEN FOR THE LIGHTS
  • 4.1.6. CLEANING THE WINDOWS CHECKING THE WINDSHIELD WIPER BLADES
  • 4.2. PRECAUTIONS TO BE TAKEN WHEN WORKING
  • 4.2.1. STARTING THE ENGINE
  • 4.2.2. CHECK THE DIRECTION BEFORE STARTING THE MACHINE
  • 4.2.3. CHECKS FOR TRAVELLING IN REVERSE
  • 4.2.4. MOVING THE MACHINE
  • 4.2.5. MOVING ON SLOPES
  • 4.2.6. WORKING ON SLOPES
  • 4.2.7. UNAUTHORIZED OPERATIONS
  • 4.2.8. PREVENTING ELECTROCUTION
  • 4.3. Cable voltage
  • 4.4. Min. safety distance
  • 4.5. kV (distribution line)
  • 4.7. kV (23 insulators)
  • 4.9. kV (min. 3 insulators)
  • 4.11. kV (min. 6 insulators)
  • 4.13. kV (min. 10 insulators)
  • 4.15. kV (min. 19 insulators)
  • 4.16.1. VISIBILITY
  • 4.16.2. TRANSPORTING THE MACHINE ON MOTOR VEHICLES
  • 4.16.3. BATTERY
  • 4.16.4. PRECAUTIONS FOR THE REMOVAL
  • 4.16.5. PRECAUTIONS FOR MAINTENANCE
  • 4.16.6. SAFETY, NOISE AND VIBRATION PLATES
  • 5. DATI.tps.pdf
  • 5.1. TECHNICAL DATA
  • 5.1.1. STANDARD OVERALL DIMENSIONS (for model PC20R only)
  • 5.1.2. TECHNICAL CHARACTERISTICS PC20R
  • 5.1.3. TOTAL MASS
  • 5.1.4. STANDARD BUCKET CAPACITY
  • 5.1.5. ENGINE
  • 5.1.6. ELECTRICAL SYSTEM
  • 5.1.7. UPPER STRUCTURE ROTATION
  • 5.1.8. SPEEDS
  • 5.1.9. STANDARD OVERALL DIMENSIONS (for model PC27R only)
  • 5.1.10. TECHNICAL CHARACTERISTICS PC27R
  • 5.1.11. TOTAL MASS
  • 5.1.12. STANDARD BUCKET CAPACITY
  • 5.1.13. ENGINE
  • 5.1.14. ELECTRICAL SYSTEM
  • 5.1.15. UPPER STRUCTURE ROTATION
  • 5.1.16. SPEEDS
  • 5.1.17. LIFTING CAPACITY WITH CAB (for model PC20R only)
  • 5.1.18. LIFTING CAPACITY WITH CANOPY (for model PC20R only)
  • 5.1.19. LIFTING CAPACITY WITH CAB (for model PC27R only)
  • 5.1.20. LIFTING CAPACITY WITH CANOPY (for model PC27R only)
  • 6. DESCRIZ.tps.pdf
  • 6.1. SAFETY LOCKS
  • 6.1.1. MACHINE LOCKS
  • 6.2. GENERAL VIEWS
  • 6.2.1. GENERAL VIEW OF THE MACHINE WITH CAB
  • 6.2.2. GENERAL VIEW OF THE MACHINE WITH CANOPY
  • 6.2.3. GENERAL VIEW OF THE DRIVERS SEAT
  • 6.3. INSTRUMENTS AND CONTROLS
  • 6.3.1. INSTRUMENTS, WARNING LIGHTS AND PUSH BUTTONS
  • 6.3.2. MACHINE CONTROLS
  • 6.4. FUSES AND RELAYS
  • 6.4.1. FUSES
  • 6.5. POSITION
  • 6.6. COLOUR
  • 6.7. CAPACITY (A)
  • 6.8. INVOLVED CIRCUIT
  • 6.9. INVOLVED CIRCUIT
  • 7. USO.tps.pdf
  • 7.1. USE OF THE MACHINE
  • 7.1.1. CHECKS BEFORE STARTING THE ENGINE
  • 7.1.2. STARTING THE ENGINE
  • 7.1.3. WARMING THE ENGINE
  • 7.1.4. HEATING THE HYDRAULIC OIL
  • 7.1.5. HOW TO MOVE THE MACHINE
  • 7.2. PARKING THE MACHINE
  • 7.2.1. PARKING ON LEVEL GROUND
  • 7.2.2. PARKING ON SLOPES
  • 7.3. STOPPING THE ENGINE
  • 7.4. TRANSPORTING THE MACHINE ON MOTOR VEHICLES
  • 7.4.1. LOADING AND UNLOADING THE MACHINE
  • 7.4.2. TRANSPORT
  • 7.5. LIFTING THE MACHINE
  • 7.6. PRECAUTIONS TO BE TAKEN IN THE COLD SEASON
  • 7.6.1. FUEL AND LUBRICANTS
  • 7.6.2. COOLANT
  • 7.6.3. BATTERY
  • 7.7. CHARGE PERCENTAGE
  • 7.8. FLUID TEMPERATURE
  • 7.8.1. OTHER PRECAUTIONS
  • 7.8.2. PRECAUTIONS TO BE TAKEN AT THE END OF WORK
  • 7.8.3. PRECAUTIONS TO BE TAKEN IN THE WARM SEASON
  • 7.8.4. USING THE WORK EQUIPMENT
  • 7.8.5. TROUBLESHOOTING
  • 8. MANUT1.tps.pdf
  • 8.1. GUIDE TO MAINTENANCE
  • 8.2. MAINTENANCE NOTES
  • 8.2.1. NOTES REGARDING THE ENGINE
  • 8.3. Minimum ambient temperature (C)
  • 8.4. Quantity of antifreeze (l)
  • 8.5. Quantity of water (l)
  • 8.5.1. NOTES REGARDING THE HYDRAULIC SYSTEM
  • 8.5.2. NOTES REGARDING THE ELECTRICAL SYSTEM
  • 8.5.3. NOTES REGARDING LUBRICATION
  • 8.5.4. PARTS SUBJECT TO WEAR THAT PERIODICALLY NEED CHANGING
  • 8.8. EVERY 250 HOURS
  • 8.9. YM12915035151
  • 8.11. EVERY 500 HOURS
  • 8.12. YM11981055650
  • 8.14. EVERY 500 HOURS
  • 8.15. YM12905255630
  • 8.17. EVERY 500 HOURS
  • 8.17.1. FUEL, COOLANT AND LUBRICANTS
  • 8.18. WATER ANTIFREEZE
  • 8.19. PERMANENT COOLANT
  • 8.19.1. LUBRICATION WITH GREASE
  • 8.20. NLGI 2
  • 8.20.1. DRIVING TORQUES FOR SCREWS AND NUTS
  • 8.20.2. SPECIFIC DRIVING TORQUES
  • 8.21. 0.75 6.75 0.75
  • 8.22. 7.3 66 7.3
  • 8.23. 1 6.75 0.75
  • 8.24. 11 66 7.3
  • 8.24.1. LUBRICATION
  • 8.24.2. PERIODICAL CHANGE OF THE COMPONENTS THAT ARE CONNECTED WITH SAFETY
  • 8.29. Every 2 years or 4000 hours, whichever occurs first
  • 8.29.1. MAINTENANCE PLAN
  • 8.29.2. MAINTENANCE EVERY 100 HOURS OF OPERATION
  • 8.30.1. MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION (Operations to be carried out together wi…
  • 8.32.1. MAINTENANCE EVERY 250 HOURS OF OPERATION
  • 8.33.1. MAINTENANCE EVERY 500 HOURS OF OPERATION
  • 8.33.2. MAINTENANCE EVERY 1000 HOURS OF OPERATION
  • 8.35.1. MAINTENANCE EVERY 2000 HOURS OF OPERATION
  • 8.36.1. WHEN REQUIRED
  • 8.37.1. MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER (BREAKER)
  • 8.40.1. CHECKS BEFORE STARTING
  • 8.40.2. MAINTENANCE EVERY 100 HOURS OF OPERATION
  • 8.41. MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION
  • 8.42. MAINTENANCE EVERY 250 HOURS OF OPERATION
  • 8.43. MAINTENANCE EVERY 500 HOURS OF OPERATION
  • 8.44. MAINTENANCE EVERY 1000 HOURS OF OPERATION
  • 8.45. MAINTENANCE EVERY 2000 HOURS OF OPERATION
  • 8.46. WHEN REQUIRED
  • 8.47. MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER (BREAKER)
  • 8.48. LONG PERIODS OF INACTIVITY
  • 8.48.1. BEFORE THE PERIOD OF INACTIVITY
  • 8.48.2. DURING THE PERIOD OF INACTIVITY
  • 8.48.3. AFTER THE PERIOD OF INACTIVITY
  • 9. ATTREZZ.tps.pdf
  • 9.1. AUTHORIZED OPTIONAL EQUIPMENT
  • 9.1.1. PRECAUTIONS REGARDING SAFETY
  • 9.1.2. PRECAUTIONS REGARDING THE INSTALLATION OF EQUIPMENT
  • 9.1.3. CHARACTERISTICS OF THE OPTIONAL EQUIPMENT
  • 9.1.4. (FOR MODEL PC20R ONLY)
  • 9.1.5. (FOR MODEL PC27R ONLY)
  • 9.1.6. ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
  • 9.1.7. ARRANGEMENT FOR THE OPERATION OF OPTIONAL EQUIPMENT
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC20R-8, PC27R-8 Hydraulic Excavator Operation and Maintenance Manual WEAM000100”

Your email address will not be published. Required fields are marked *