Description
-
Model List:
- PC390LC-8M0 Hydraulic Excavator
- 1. Cover
- 2. FOREWORD
- 3. Precautions for Field Assembly
- 4. Disposal of removed parts
- 5. Transportation
- 5.1. Introduction
- 5.2. State of SubAssembly Parts and Blank Cap Position for each Part
- 5.3. Implementation method before and after assembly
- 6. Fieldinstallation procedure
- 6.1. Attaching the boom cylinder
- 6.2. Attaching the boom assembly to the main body
- 6.3. Attaching the boom cylinder rod to the boom
- 6.4. Attaching the sound absorbing materials,and other parts to the front of the weight
- 6.5. Attaching the weight
- 6.6. Attaching the arm to the boom
- 6.7. Attaching the arm cylinder head to the arm
- 6.8. Connecting the bucket cylinder pipes
- 6.9. Attaching the the bucket
- 6.10. Attaching the mirrors and handrail
- 6.11. Installation of rear monitoring camera (Option)
- 6.12. Connection of the wiring of boom working lamp
- 6.13. Increasing of track frame gauge
- 6.14. Adjustment of track tension
- 6.15. Installation of steps
- 6.16. Greaseup
- 6.17. Check work equipment speed(Boom LOWER) and adjustment.
- 6.18. Installation of hydraulic hose with attachment
- 7. FIELD ASSEMBLY INSPECTION REPORT