Yanmar ViO12 Excavator Service Manual

$30.00

  • Type Of Manual: Service Manual
  • Number of Pages: 405
  • Size: 78.7MB
  • Format: PDF

Description

  • Model List:

    • ViO12 Excavator
  • 1. SPINE TITLE
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. General Cautions for Maintenance Work
  • 4.1. Correct Work
  • 4.2. Safety Precautions
  • 4.3. Preparations
  • 4.4. Cautions for Disassembly and Reassembly
  • 4.5. Cautions for Removal and Installation of Hydraulic Equipment
  • 4.6. Cautions for Removal and Installation of Hydraulic Piping
  • 4.7. Cautions for Handling Seals
  • 4.8. Correct Installation of Hydraulic Hose
  • 4.9. Specifications of Hydraulic Hose
  • 4.10. Air Release of Hydraulic Equipment
  • 5. Technical Data
  • 5.1. Specifications
  • 5.2. Outline Drawing and Working Area
  • 5.3. Weight List of Main Parts
  • 5.4. Lifting Capacity List
  • 6. Service Standards
  • 6.1. Machine Performance
  • 6.2. Engine
  • 6.3. Undercarriage
  • 6.3.1. Rubber Crawler Specifications
  • 6.4. Controls
  • 6.5. Hydraulic Equipment
  • 6.5.1. Hydraulic Cylinders
  • 6.6. Implement
  • 6.6.1. Front Attachments
  • 6.6.2. Blade Moving Device
  • 6.6.3. Bucket Teeth
  • 6.7. List of Tightening Torque
  • 6.7.1. Machine
  • 6.7.2. Engine
  • 6.7.3. Tightening Torque for General Bolts and Nuts
  • 7. Engine
  • 7.1. Exploded View (General layouts of major engine components)
  • 7.2. Measurement, Inspection and Adjustment
  • 7.2.1. Measuring the Compression Pressure
  • 7.2.2. Adjusting the Valve Clearance
  • 7.2.3. Checking the V-belt Tension
  • 7.2.4. Checking the Fuel Injection Valve
  • 7.2.5. Checking and Adjusting Fuel Injection Timing
  • 7.2.6. Adjusting the Maximum (or Minimum) Idling Speed
  • 7.2.7. Checking the Cooling Water System and Radiator for Water Leakage
  • 7.2.8. Checking the Sensors
  • 7.3. Measurement Procedure, Service Data and Corrective Action
  • 7.3.1. Cylinder Head
  • 7.3.2. Cylinder Block
  • 7.3.3. Valve Rocker Arm
  • 7.3.4. Piston and Piston Rings
  • 7.3.5. Connecting Rod
  • 7.3.6. Cam shaft
  • 7.3.7. Crank shaft
  • 7.3.8. Gears
  • 7.3.9. Trochoid Pump
  • 7.4. Precautions for Reassembly
  • 7.5. Electrical Equipment
  • 7.5.1. Starter Motor
  • 7.5.2. Alternator
  • 8. Hydraulic System
  • 8.1. Outline
  • 8.1.1. Control Valve Operation
  • 8.2. Hydraulic Circuit Schematic
  • 8.2.1. For Standard Type Machines
  • 8.3. Circuit Operation
  • 8.3.1. Boom
  • 8.3.2. Arm
  • 8.3.3. Bucket
  • 8.3.4. Swing
  • 8.3.5. Boom Swing
  • 8.3.6. Blade
  • 8.3.7. Travel
  • 8.3.8. Track Gauge Change
  • 8.3.9. Simultaneous Operation of Travel and Blade
  • 8.3.10. Simultaneous Operation of Boom Up and Bucket
  • 8.3.11. Hydraulic P.T.O.
  • 8.4. Pressure Adjustment
  • 8.4.1. System Relief Valves
  • 8.4.2. Circuit Relief Valves
  • 8.4.3. Swing Brake Valve
  • 8.4.4. Cut-Off Valve
  • 9. Hydraulic Equipment
  • 9.1. Hydraulic Pump
  • 9.1.1. S/N 28645 and before
  • 9.1.2. S/N 28646 and above
  • 9.2. Control Valve
  • 9.3. Pilot Valve
  • 9.4. Cut-off Valve
  • 9.5. Swing Motor
  • 9.6. Travel Motor
  • 9.6.1. S/N 22644 and before
  • 9.6.2. S/N 22701 and above
  • 10. Adjustment and Repair
  • 10.1. Electrical Equipment and Engine of Machine
  • 10.1.1. Parts Layout of Electrical Equipment
  • 10.1.2. Monitor and Alarm Systems
  • 10.1.3. Wiring Diagram
  • 10.1.4. Circuit Description of Engine Start and Stop
  • 10.1.5. Removal and Reinstallation of Engine
  • 10.1.6. Removal and Reinstallation of Starter Motor
  • 10.1.7. Removal and Reinstallation of Fuel Injection Pump
  • 10.1.8. Removal and Reinstallation of Fuel Tank
  • 10.1.9. Removal and Reinstallation of Radiator
  • 10.2. Undercarriage
  • 10.2.1. Outline
  • 10.2.2. Points of Reassembly
  • 10.2.3. Removal and Reinstallation of Crawler
  • 10.2.4. Disassembly and Reassembly of Idler
  • 10.2.5. Disassembly and Reassembly of Track Roller
  • 10.2.6. Removal and Reinstallation of Track Gauge Change Cylinder
  • 10.3. Controls
  • 10.3.1. Control Train
  • 10.3.2. Mechanical Control Linkage
  • 10.3.3. Adjustment of Control Levers
  • 10.3.4. Adjustment of Travel and Blade Levers
  • 10.3.5. Adjustment of Boom Swing and P.T.O. Pedals and P.T.O. Pedal Lock
  • 10.3.6. Adjustment of Lock Lever Switch
  • 10.3.7. Adjustment of Accelerator Lever
  • 10.4. Swing Bearing
  • 10.4.1. Removal and Reinstallation of Swing Bearing
  • 10.5. Hydraulic Equipment
  • 10.5.1. Removal and Reinstallation of Hydraulic Oil Tank
  • 10.5.2. Removal and Reinstallation of Control Valve
  • 10.5.3. Removal and Reinstallation of Swing Motor
  • 10.5.4. Removal and Reinstallation of Swivel Joint
  • 10.5.5. Disassembly and Reassembly of Swivel Joint
  • 10.5.6. Disassembly and Reassembly of Hydraulic Cylinders
  • 10.5.7. Removal and Reinstallation of Boom Swing Cylinder
  • 10.5.8. Removal and Reinstallation of Hydraulic Oil Tank
  • 10.5.9. Piping Layout
  • 10.6. Implement
  • 10.6.1. Removal and Reinstallation of Implement
  • 11. Periodic Inspection and Servicing
  • 11.1. List of Periodic Inspection and Servicing
  • 12. Fuel, Lube Oil and Grease Recommended
  • 13. Troubleshooting
  • 13.1. Non-Breakdowns
  • 13.1.1. Natural Release of Bucket
  • 13.1.2. Discontinuous Arm Movement
  • 13.1.3. Drifting of Upperstructure on Quick Travel Operation
  • 13.1.4. Thermal Shock of Travel Motor
  • 13.1.5. Change of Blade Speed in Loaded Condition
  • 13.1.6. Time Lag on Travel Speed Switching
  • 13.1.7. Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperature Change
  • 13.2. Troubleshooting
  • 13.2.1. Machine and Engine
  • 13.2.2. Electrical Equipment on Panel
  • 14. Reference Data
  • 14.1. Specifications for Attachment
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Yanmar ViO12 Excavator Service Manual”

Your email address will not be published. Required fields are marked *