Yanmar ViO80 Excavator Service Manual

$30.00

  • Type Of Manual: Service Manual
  • Number of Pages: 776
  • Size: 176.3MB
  • Format: PDF

Description

  • Model List:

    • ViO80 Excavator
  • 1. SPINE TITLE
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. CHAPTER 1 GENERAL CAUTIONS FOR MAINTENANCE WORK
  • 4.1. General Cautions for Maintenance Work
  • 4.1.1. Correct Work
  • 4.1.2. Safety Precautions
  • 4.1.3. Preparations
  • 4.1.4. Cautions for Disassembly and Reassembly
  • 4.1.5. Cautions for Removal and Installation of Hydraulic Equipment
  • 4.1.6. Cautions for Removal and Installation of Hydraulic Piping
  • 4.1.7. Cautions for Handling Seals
  • 4.1.8. Correct Installation of Hydraulic Hose
  • 4.1.9. Specifications of Hydraulic Hose
  • 4.1.10. Air Release of Hydraulic Equipment
  • 5. CHAPTER 2 TECHNICAL DATA
  • 5.1. Technical Data
  • 5.1.1. Specifications
  • 5.1.2. Outline Drawing and Working Area
  • 5.1.2.1. Quick Coupler
  • 5.1.2.2. W/O Quick Coupler
  • 5.1.3. Weight List of Main Parts
  • 5.1.4. Lifting Capacity List
  • 5.1.4.1. ViO80 Quick Coupler Spec.
  • 5.1.4.2. ViO80 W/O Quick Coupler Spec.
  • 6. CHAPTER 3 SERVICE STANDARDS
  • 6.1. Service Standards
  • 6.1.1. Machine Performance
  • 6.1.2. Engine
  • 6.1.3. Undercarriage
  • 6.1.3.1. Rubber Crawler Specifications
  • 6.1.3.2. Steel Crawler Specifications
  • 6.1.3.3. Common Specifications of Steel Rubber Crawlers
  • 6.1.4. Controls
  • 6.1.5. Hydraulic Equipment
  • 6.1.5.1. Hydraulic Cylinders
  • 6.1.6. Implement
  • 6.1.6.1. Front Attachments
  • 6.1.6.2. Blade Moving Device
  • 6.1.6.3. Bucket Teeth
  • 6.1.7. List of Tightening Torque
  • 6.1.7.1. Machine
  • 6.1.7.2. Engine
  • 6.1.7.3. Tightening Torque for General Bolts and Nuts
  • 6.1.7.4. Hydraulic Fitting
  • 7. CHAPTER 4 ENGINE
  • 7.1. Engine
  • 7.1.1. Engine
  • 7.1.1.1. Safety Precautions
  • 7.1.1.2. Introduction
  • 7.1.1.3. Special Service Tools
  • 7.1.1.4. Measuring Instruments
  • 7.1.1.5. Valve Cylinder Head 4-Valve Cylinder Head Components
  • 7.1.1.6. Measuring and Adjusting Valve Clearance
  • 7.1.1.7. Crankshaft and Camshaft Components
  • 7.1.1.8. EGR System
  • 7.1.2. Fuel System
  • 7.1.2.1. Before You Begin Servicing
  • 7.1.2.2. Introduction
  • 7.1.2.3. Special Service Tools
  • 7.1.2.4. Measuring Instruments
  • 7.1.2.5. Fuel System Diagram
  • 7.1.2.6. Fuel System Components
  • 7.1.2.7. Fuel Injection Pump
  • 7.1.2.8. Fuel Injectors
  • 7.1.3. Cooling System
  • 7.1.3.1. Before You Begin Servicing
  • 7.1.3.2. Introduction
  • 7.1.3.3. Cooling System Diagram
  • 7.1.3.4. Engine Coolant Pump Components
  • 7.1.3.5. Engine Coolant System Check
  • 7.1.3.6. Engine Coolant Pump
  • 7.1.4. Lubrication System
  • 7.1.4.1. Before You Begin Servicing
  • 7.1.4.2. Introduction
  • 7.1.4.3. Lubrication System Diagram
  • 7.1.4.4. Checking Engine Oil Pressure
  • 7.1.4.5. Trochoid Oil Pump
  • 7.1.5. Starter Motor
  • 7.1.5.1. Before You Begin Servicing
  • 7.1.5.2. Introduction
  • 7.1.5.3. Starter Motor Specifications
  • 7.1.5.4. Starter Motor Troubleshooting
  • 7.1.5.5. Starter Motor Components
  • 7.1.5.6. Starter Motor
  • 7.1.6. Alternator
  • 7.1.6.1. Before You Begin Servicing
  • 7.1.6.2. Introduction
  • 7.1.6.3. Alternator Specifications
  • 7.1.6.4. Alternator Troubleshooting
  • 7.1.6.5. Alternator Components
  • 7.1.6.6. Alternator Wiring Diagram
  • 7.1.6.7. Alternator Standard Output
  • 7.1.6.8. Alternator
  • 7.1.7. Electronic Control System
  • 7.1.7.1. Engines available with the electronic control system
  • 7.1.7.2. Before You Begin Servicing
  • 7.1.7.3. Main Electronic Control Components and Features
  • 7.1.8. Electric Wiring
  • 7.1.8.1. Electric Wiring Precautions
  • 7.1.9. Failure Diagnosis
  • 7.1.9.1. Special Service Tools
  • 7.1.9.2. Troubleshooting By Measuring Compression Pressure
  • 8. CHAPTER 5 HYDRAULIC SYSTEM
  • 8.1. Hydraulic System
  • 8.1.1. Outline
  • 8.1.1.1. Control Valve Operation
  • 8.1.1.2. Additional Operation of Control Valve
  • 8.1.2. Hydraulic Circuit Schematic
  • 8.1.2.1. US spec.
  • 8.1.2.2. AS/NZ spec.
  • 8.1.2.3. KR spec.
  • 8.1.2.4. AYR spec.
  • 8.1.3. Circuit Operation
  • 8.1.3.1. Boom
  • 8.1.3.2. Arm
  • 8.1.3.3. Bucket
  • 8.1.3.4. Swing
  • 8.1.3.5. Boom Swing
  • 8.1.3.6. Blade
  • 8.1.3.7. Travel
  • 8.1.3.8. Non-deviation Travel (with Boom, Arm, Bucket or Boom Swing Operation)
  • 8.1.3.9. Simultaneous Operation of Boom Up and Arm Retract
  • 8.1.3.10. Simultaneous Operation of Boom Up and Bucket
  • 8.1.3.11. Simultaneous Operation of Boom Up and Swing
  • 8.1.3.12. Simultaneous Operation of Arm and Bucket
  • 8.1.3.13. Hydraulic P.T.O.
  • 8.1.3.14. Travel Alarm
  • 8.1.3.15. h P.T.O.
  • 8.1.3.16. Quick Coupler
  • 8.1.3.17. Auto Deceleration
  • 8.1.4. Pressure Adjustment
  • 8.1.4.1. Relief Valves
  • 8.1.4.2. Swing Brake Valve
  • 8.1.4.3. Cut-off Valve
  • 9. CHAPTER 6 HYDRAULIC EQUIPMENT
  • 9.1. Hydraulic Equipment
  • 9.1.1. Hydraulic Pump
  • 9.1.2. Control Valve
  • 9.1.2.1. Main Control Valve
  • 9.1.2.2. Disassembly
  • 9.1.2.3. Cleaning
  • 9.1.2.4. Checking
  • 9.1.2.5. Reassembly
  • 9.1.2.6. Servicing Procedure for Relief Valve
  • 9.1.2.7. Installation
  • 9.1.2.8. Running
  • 9.1.2.9. Troubleshooting
  • 9.1.3. Pilot Valve
  • 9.1.3.1. Remote Control Valve
  • 9.1.3.2. Travel Pilot Valve
  • 9.1.3.3. Blade and Boom Swing Pilot Valve
  • 9.1.4. Swing Motor
  • 9.1.4.1. Overview
  • 9.1.4.2. Description of Functions and Operation
  • 9.1.4.3. Precautions for Handling
  • 9.1.4.4. Troubleshooting
  • 9.1.4.5. Employment Tool
  • 9.1.4.6. Disassembly Procedure
  • 9.1.4.7. Assembly Procedure
  • 9.1.4.8. Quality Check After Reassembly.
  • 9.1.5. Travel Motor
  • 9.1.5.1. Product Overview
  • 9.1.5.2. External Dimensions
  • 9.1.5.3. Basic Configuration and Drawing
  • 9.1.5.4. Operating Description
  • 9.1.5.5. Troubleshooting
  • 9.1.5.6. Service outline
  • 9.1.5.7. Disassembly
  • 9.1.5.8. Service Standard
  • 9.1.5.9. Assembly
  • 9.1.5.10. Performance Confirmation Test
  • 9.1.6. Cutoff Valve
  • 9.1.7. Solenoid Valve
  • 9.1.8. Quick Coupler Solenoid Valve
  • 9.1.9. Pilot Check Valve (Quick Coupler spec.)
  • 9.1.10. Holding Valve (AS/NZ spec.)
  • 10. CHAPTER 7 ADJUSTMENT AND REPAIR
  • 10.1. Adjustment and Repair
  • 10.1.1. Electric Equipment of the Machine
  • 10.1.1.1. Parts Layout of Electrical Equipment
  • 10.1.1.2. Monitor and Alarm Systems
  • 10.1.1.3. Wiring Diagram
  • 10.1.1.4. Circuit Description of Engine Start, Stop and Battery Charging
  • 10.1.1.5. Electronic Control
  • 10.1.1.6. Removal and Reinstallation of Engine
  • 10.1.1.7. Removal and Reinstallation of Starter Motor
  • 10.1.1.8. Removal and Reinstallation of Radiator and Oil cooler
  • 10.1.1.9. Removal and Reinstallation of Fan Belt and Compressor Driving Belt
  • 10.1.1.10. Removal and Reinstallation of Fuel Injection Pump
  • 10.1.1.11. Removal and Reinstallation of ECU
  • 10.1.2. Undercarriage
  • 10.1.2.1. Outline
  • 10.1.2.2. Compatibility of Main Parts
  • 10.1.2.3. Points of Reassembly (Rubber Crawler Type)
  • 10.1.2.4. Points of Reassembly (Steel Crawler Type)
  • 10.1.2.5. Removal and Reinstallation of Crawler
  • 10.1.2.6. Disassembly and Reassembly of Steel Crawler
  • 10.1.2.7. Disassembly and Reassembly of Front Idler
  • 10.1.2.8. Disassembly and Reassembly of Track Roller
  • 10.1.2.9. Installation of Floating Seal
  • 10.1.3. Controls
  • 10.1.3.1. Control Lever
  • 10.1.3.2. Travel Lever
  • 10.1.3.3. Adjustment of Lock Lever
  • 10.1.4. Swing Bearing
  • 10.1.4.1. Removal and Reinstallation of Swing Bearing
  • 10.1.5. Hydraulic Equipment
  • 10.1.5.1. Removal and Reinstallation of Hydraulic Pump
  • 10.1.5.2. Removal and Reinstallation of Control Valve
  • 10.1.5.3. Removal and Reinstallation of Remote Control Valves
  • 10.1.5.4. Removal and Reinstallation of Blade Pilot Valve
  • 10.1.5.5. Removal and Reinstallation of Travel Pilot Valve
  • 10.1.5.6. Removal and Reinstallation of Boom Swing Pilot Valve
  • 10.1.5.7. Removal and Reinstallation of Solenoid Valve
  • 10.1.5.8. Removal and Reinstallation of P.T.O. Solenoid Valve
  • 10.1.5.9. Removal and Reinstallation of Line Filter
  • 10.1.6. Implement
  • 10.1.6.1. Removal and Reinstallation of Implement
  • 10.1.6.2. Quick Coupler
  • 10.1.7. Cabin
  • 10.1.7.1. Removal and Reinstallation of Cabin
  • 10.1.7.2. Disassembly and Reassembly of Cabin
  • 10.1.7.3. Removal and Reinstall of Cabin Glasses
  • 10.1.8. Air Conditioner
  • 10.1.8.1. Removal and Reinstallation of Air Conditioner
  • 11. CHAPTER 8 PERIODIC INSPECTION AND SERVICING
  • 11.1. Periodic Inspection and Servicing
  • 12. CHAPTER 9 FUEL, LUBE OIL AND GREASE RECOMMENDED
  • 12.1. Fuel, Lube Oil and Grease Recommended
  • 13. CHAPTER 10 TROUBLESHOOTING
  • 13.1. Troubleshooting
  • 13.1.1. Non-breakdowns
  • 13.1.1.1. Natural Release of Bucket
  • 13.1.1.2. Discontinuous Arm Movement
  • 13.1.1.3. Thermal Shock of Travel Motor
  • 13.1.1.4. Elongation of Boom Swing Cylinder on 60 degrees Swing
  • 13.1.1.5. Time Lag on Travel Speed Switching
  • 13.1.1.6. Fluctuation in Oil Level of Hydraulic Oil Tank due to Temperature Change
  • 13.1.1.7. Operation of Quick Coupler Cylinder
  • 13.1.2. Troubleshooting
  • 13.1.2.1. Machine and Engine
  • 13.1.2.2. Electrical Equipment on Panel
  • 14. CHAPTER 11 REFERENCE DATA
  • 14.1. Reference Data
  • 14.1.1. Specifications for Attachment
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Yanmar ViO80 Excavator Service Manual”

Your email address will not be published. Required fields are marked *