Description
-
Model List:
- 830E-5 Dump Truck
- 1. FIELD ASSEMBLY MANUAL 830E5 DUMP
- 2. FOREWORD
- 3. TABLE OF CONTENTS
- 4. SAFETY RULES, TOOLS EQUIPMENT
- 5. TRUCK COMPONENTS AND SPECIFICATIONS
- 5.1. Truck and Engine
- 5.2. AC Induction Traction Motorized Wheels
- 5.3. Suspension
- 5.4. Operators Cab
- 5.5. Power Steering
- 5.6. Dynamic Retarding Grid
- 5.7. Brake System
- 5.8. Selective Catalytic Reduction (SCR)
- 5.9. Diesel Exhaust Fluid (DEF)
- 6. SPECIFICATIONS
- 7. MAJOR COMPONENT WEIGHTS
- 8. RECEIVING ASSEMBLY PREPARATION
- 8.1. Preparation
- 8.2. Coded Boxes
- 9. CHASSIS ASSEMBLY
- 10. DUMP BODY ASSEMBLY
- 10.1. GENERAL INFORMATION
- 10.2. BODY ASSEMBLY
- 10.3. BODY WELDING
- 11. FINAL ASSEMBLY
- 11.1. Mount Tires, Rim Adapter, and Torque
- 11.2. Rear Wheel Installation
- 11.3. Body
- 11.4. Body Pad Shimming Procedure
- 11.5. Rock Ejectors
- 11.6. Mud Flaps
- 11.7. Guide Brackets
- 11.8. Retention Sling
- 11.9. Body Up Switch Adjustment
- 11.10. Hoist limit switch adjustment
- 11.11. Bolt in Lubrication System
- 11.12. Isolation Box Installation
- 11.13. Camera and Radar
- 12. FINAL CHECKOUT
- 13. APPENDIX
- 13.1. STANDARD TORQUE CHARTS AND CONVERSION TABLES
- 13.2. SUSPENSION OILING AND CHARGING PROCEDURE
- 13.3. SUSPENSION OILING AND CHARGING BLOCK KIT INSTALLATION PROCEDURE
- 13.4. OIL AND NITROGEN SPECIFICATIONS CHART
- 13.5. FAN CLUTCH CHECKOUT PROCEDURE
- 13.6. ENGINE EMISSIONS AFTERTREATMENT SYSTEMS
- 13.7. TOEIN ADJUSTMENT
- 13.8. SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
- 13.9. ELECTRIC CHECKOUT PROCEDURE
- 13.10. INTERFACE MODULE CHECKOUT PROCEDURE
- 13.11. ADDITIONAL ELECTRICAL CHECKOUT FOR TRUCKS WITH IM CONTROLS
- 13.12. HYDRAULIC CHECKOUT PROCEDURE
- 13.13. Brake Test PreShift Checkout Procedure
- 13.14. BRAKE SYSTEM CHECKOUT PROCEDURE
- 13.15. AUTOMATIC LUBRICATION SYSTEM
- 13.16. AUTOMATIC LUBRICATION SYSTEM CHECKOUT PROCEDURE
- 13.17. AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
- 13.18. TIRE MONITORING SYSTEM CHECKOUT PROCEDURE
- 13.19. PAYLOAD METER IV CHECKOUT PROCEDURE
- 13.20. ALTERNATOR LOCK CHECKOUT PROCEDURE
- 13.21. KOMTRAX PLUS 2 SHOP SETUP CHECKOUT PROCEDURE
- 13.22. KOMTRAX PLUS 2 SITE SETUP CHECKOUT PROCEDURE
- 13.23. KOMVISION CHECKOUT PROCEDURE
- 13.24. KOMATSU WIRELESS BRIDGE CHECKOUT PROCEDURE
- 13.25. RETRACTABLE LADDER SYSTEM CHECKOUT PROCEDURE
- 13.26. FIELD ASSEMBLY INSPECTION REPORT
- 13.27. HOUR POSTCOMMISSIONING CHECKSHEET