Komatsu PC27R-8 Hydraulic Excavator Shop Manual WEBM002900

$50.00

  • Type Of Manual: Shop Manual
  • Manual ID: WEBM002900
  • Format: PDF
  • Size: 19.4MB
  • Number of Pages: 250

Description

  • Model List:

    • PC27R-8 Hydraulic Excavator
  • 0.1. HOW TO READ THE SHOP MANUAL
  • 0.2. HOISTING INSTRUCTIONS
  • 0.3. STANDARD TIGHTENING TORQUE
  • 0.4. COATING MATERIALS
  • 0.5. ELECTRIC WIRE CODE
  • 0.6. WEIGHT TABLE
  • 0.7. TABLE OF OIL AND COOLANT QUANTIES
  • 1. STRUCTURE AND FUNCTION
  • 1.1. POWER TRAIN
  • 1.2. SWING CIRCLE
  • 1.3. SWING MACHINERY
  • 1.4. HYDRAULIC SYSTEM
  • 1.5. HYDRAULIC CIRCUIT DIAGRAM
  • 1.6. ELECTRICAL DIAGRAM (1/3)
  • 1.7. ELECTRICAL DIAGRAM (2/3)
  • 1.8. ELECTRICAL DIAGRAM (3/3)
  • 2. TESTING AND ADJUSTING
  • 2.1. NORMAL OR STANDARD TECHNICAL DATA
  • 2.2. SPECIAL TOOLS
  • 2.3. CHECKING THE ENGINE SPEED
  • 2.4. ADJUSTMENT OF VALVE CLEARANCE
  • 2.5. MEASUREMENT OF THE COMPRESSOR PRESSURE
  • 2.6. CONTROL AND ADJUSTMENT OF THE TENSION OF THE FAN BELT
  • 2.7. CONTROL AND ADJUSTMENT OF THE INJECTION TIMING
  • 2.8. CONTROL AND ADJUSTMENT OF THE ACCELERATOR STROKE
  • 2.9. ADJUSTMENTOF THE STROKE OF THE BLADE COMMAND LEVER
  • 2.10. ADJUSTING THE FLEXIBLE CABLES
  • 2.11. CONTROL AND ADJUSTMENT OF THE STROKE OF THE TRAVEL LEVER
  • 2.12. ADJUSTMENT OF THE STROKE OF THE BOOM SWING COMMAND PEDAL
  • 2.13. ADJUSTMENT OF THE PPC VALVE CLEARANCES
  • 2.14. ADJUSTMENT OF THE RUBBER PAD AND SAFETY MICROSWITCH FOR SERVOCONTROL ENGAGEMENT
  • 2.15. CONTROL AND ADJUSTMENTOF THE STROKE OF THE TRACKSHOE TENSION
  • 2.16. CONTROL AND REGULATION OF THE PREEURES IN THE HYDRAULIC CIRCUTIS
  • 2.17. CONTROL AND REGULATION OF THE LS DIFFERENTIAL PRESSURE AND ADJUSTMENT OF THE LS VALVE
  • 2.18. REGULATION OF THE PC VALVE
  • 2.19. CONTROL AND REGULATION O THE SERVOCONTROL POWER SUPPLY
  • 2.20. ELIMINATION OF RESIDUAL PRESSURES PRESSURISATION OF THE TANK
  • 2.21. BLEEDING AIR FROM THE HYDRAULIC CIRCUITS
  • 2.22. CONTROL OF HYDRAULIC DRIFTS ANALYSIS OF THE CAUSES OF A DRIFT
  • 2.23. CHECKING FOR ANY LEAKAGES INSIDE THE WORKING EQUIPMENT CYLINDERS
  • 2.24. CHECKING FOR ANY LEAKAGES INSIDE THE SWING MOTOR
  • 2.25. METHODS FOR TESTING FOR LEAKAGES INSIDE THE SWIVEL JOINT
  • 3. REMOVAL AND INSTALLATION
  • 3.1. HOW TO READ THE MANUAL
  • 3.2. PRECAUTIONS TO BE TAKEN WHILE WORKING
  • 3.3. WATER COOLANT PUMP
  • 3.4. DIESEL FUEL TANK
  • 3.4.1. REMOVAL
  • 3.4.2. INSTALLATION
  • 3.5. HYDRAULIC OIL TANK
  • 3.5.1. REMOVAL
  • 3.5.2. INSTALLATION
  • 3.6. OILCOOLERRADIATOR GROUP
  • 3.6.1. REMOVAL
  • 3.6.2. INSTALLATION
  • 3.7. ENGINEPUMP GROUP
  • 3.8. ENGINEPUMP COUPLING
  • 3.8.1. REMOVAL
  • 3.8.2. INSTALLATION
  • 3.9. SIDE LOWER PANELS
  • 3.9.1. REMOVAL
  • 3.9.2. INSTALLATION
  • 3.10. INNER CONTROL VALVE BOX COVER
  • 3.11. LEFTHAND PPC VALVE (ARMBUCKET)
  • 3.11.1. REMOVAL
  • 3.11.2. INSTALLATION
  • 3.12. RIGHTHAND PPC VALVE (BOOMBUCKET)
  • 3.12.1. REMOVAL
  • 3.12.2. INSTALLATION
  • 3.13. SERVOCONTROL SOLENOID GROUP
  • 3.14. SWING MACHINERY
  • 3.14.1. INSTALLATION
  • 3.15. REVOLVING FRAME
  • 3.16. RUBBER TRACK SHOES
  • 3.16.1. REMOVAL
  • 3.16.2. INSTALLATION
  • 3.17. STEEL TRACKSHOES
  • 3.18. IDLER AND RECOIL SPRING ASSEMBLY
  • 3.18.1. REMOVAL
  • 3.18.2. INSTALLATION
  • 3.19. SPRING RECOIL AND THRUST CYLINDER GROUPS
  • 3.20. BUCKET CYLINDER
  • 3.20.1. REMOVAL
  • 3.20.2. INSTALLATION
  • 3.21. BOOM SWING CYLINDER
  • 3.22. WORKING EQUIPMENT CYLINDERS
  • 3.22.1. DISASSEMBLY
  • 3.22.2. ASSEMBLY
  • 3.23. UPPER WORKING EQUIPMENT
  • 3.24. BOOM SWING SUPPORT
  • 4. MAINTENANCE STANDARD
  • 4.1. SWING CIRCLE
  • 4.2. SWING MACHINERY
  • 4.3. FINAL DRIVE
  • 4.4. SPROCKET
  • 4.5. TRACK FRAME AND RECOIL SPRING
  • 4.6. PPC VALVE (FOR BOOM, ARM, BUCKET, SWING)
  • 4.7. PPC VALVE (FOR HAMMER)
  • 4.8. CYLINDER
  • 4.9. WORK EQUIPMENT
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC27R-8 Hydraulic Excavator Shop Manual WEBM002900”

Your email address will not be published. Required fields are marked *