Komatsu PC75R-2 Hydraulic Excavator Shop Manual WEBM004000

$50.00

  • Type Of Manual: Shop Manual
  • Manual ID: WEBM004000
  • Format: PDF
  • Size: 9.9MB
  • Number of Pages: 364

Description

  • Model List:

    • PC75R-2 Hydraulic Excavator
  • 1. MAIN MENU
  • 2. COVER
  • 3. CONTENTS
  • 4. LIST OF REVISED PAGES
  • 5. SAFETY
  • 6. FOREWORD
  • 7. HOW TO READ THE SHOP MANUAL
  • 8. HOISTING INSTRUCTIONS
  • 9. STANDARD TIGHTENING TORQUE
  • 10. COATING MATERIALS
  • 11. ELECTRIC WIRE CODE
  • 12. WEIGHT TABLE
  • 13. TABLE OF OIL COOLANT QUANTITIES
  • 14. STRUCTURE AND FUNCTION
  • 14.2. POWER TRAIN
  • 14.3. TRACK FRAME
  • 14.4. IDLER AND RECOIL SPRING
  • 14.5. CARRIER ROLLER
  • 14.6. TRACK ROLLER
  • 14.7. TRACK SHOE
  • 14.8. SWING CIRCLE
  • 14.9. SWING MACHINERY
  • 14.10. HYDRAULIC CIRCUIT DIAGRAM (STANDARD)
  • 14.11. HYDRAULIC CIRCUIT DIAGRAM (2PIECE BOOM)
  • 14.12. HYDRAULIC PUMP
  • 14.13. SPOOL CONTROL VALVE (STANDARD)
  • 14.14. SPOOL CONTROL VALVE (STANDARD2PIECE BOOM)
  • 14.15. SWING MOTOR
  • 14.16. CENTER SWIVEL JOINT
  • 14.17. SERVOCONTROL FEED UNIT
  • 14.18. ACCUMULATOR
  • 14.19. PPC VALVE (WORK EQUIPMENT)
  • 14.20. PPC VALVE (BLADE, BOOM SWING, 2PIECE BOOM)
  • 14.21. TRAVEL PPC VALVE
  • 14.22. BOOM AND ARM SAFETY VALVE
  • 14.23. BLADE SAFETY VALVE
  • 14.24. PIECE BOOM SAFETY VALVE
  • 14.25. OVERLOAD SENSOR SWITCH
  • 14.26. SOLENOID VALVE
  • 14.27. ELECTRICAL DIAGRAM (1/3)
  • 14.28. ELECTRICAL DIAGRAM (2/3)
  • 14.29. ELECTRICAL DIAGRAM (3/3)
  • 15. TESTING AND ADJUSTING
  • 15.1. NORMAL OR STANDARD TECHNICAL DATA
  • 15.2. SPECIAL TOOLS
  • 15.3. MEASURING THE ENGINE SPEED
  • 15.4. ADJUSTING VALVE CLEARANCE
  • 15.5. MEASURING COMPRESSION PRESSURE
  • 15.6. TESTING AND ADJUSTING FUEL INJECTION TIMING
  • 15.7. TESTING AND ADJUSTING FAN BELT TENSION
  • 15.8. ADJUSTING THE STROKE OF THE ACCELERATOR LEVER
  • 15.9. ADJUSTING PPC VALVE CLEARANCE
  • 15.10. ADJUSTING THE SAFETY MICROSWITCH
  • 15.11. MEASURING THE SWING CIRCLE AXIAL CLEARANCE
  • 15.12. TESTING AND ADJUSTING TRACKSHOE TENSION
  • 15.13. AIR BLEEDING FROM HYDRAULIC CIRCUITS
  • 15.14. RELEASING RESIDUAL PRESSURE FROM THE CIRCUITS
  • 15.15. CHECKING AND REGULATING PRESSURE IN THE HYDRAULIC CIRCUITS
  • 15.16. TESTING AND SETTING OF MAIN VALVES
  • 15.17. ADJUSTING PC VALVE
  • 15.18. MEASURING LS DIFFERENTIAL PRESSURE AND ADJUSTING LS VALVE
  • 15.19. CHECKING AND ADJUSTING PRESSURES IN THE SERVOCONTROL FEED UNIT
  • 15.20. MEASURING PUMPS DELIVERY AND FLOW CONTROL STARTING POINT PUMP P1
  • 15.21. MEASURING TRAVEL DEVIATION
  • 15.22. ADJUSTING THE MAXIMUM SPEED OF THE TRAVEL MOTORS
  • 15.23. MEASURING INNER OIL LEAKAGE OF TRAVEL MOTOR
  • 15.24. ADJUSTING BOOM AND ARM SAFETY VALVES
  • 15.25. ADJUSTING 2nd BOOM SAFETY VALVES
  • 15.26. MEASURING AND SETTING OF PRESSURE SWITCH SIGNAL OVERLOAD OPERATION
  • 15.27. MEASUREMENT OF INTERNAL OIL LEAKAGES IN THE SWING MOTOR
  • 15.28. CHECKING FOR LEAKAGES INSIDE THE SWIVEL JOINT
  • 15.29. ANALYSIS OF THE CAUSES OF HYDRAULIC DRIFTS
  • 16. DISASSEMBLY AND ASSEMBLY
  • 16.1. HOW TO READ THE MANUAL
  • 16.2. PRECAUTIONS TO BE TAKEN WHEN WORKING
  • 16.3. SPECIAL TOOLS
  • 16.4. STARTER MOTOR
  • 16.4.1. REMOVAL AND INSTALLATION
  • 16.5. ALTERNATOR
  • 16.5.1. REMOVAL AND INSTALLATION
  • 16.6. INJECTION PUMP
  • 16.6.1. REMOVAL
  • 16.6.2. INSTALLATION
  • 16.7. NOZZLE HOLDER
  • 16.7.1. REMOVAL AND INSTALLATION
  • 16.8. CYLINDER HEAD
  • 16.8.1. REMOVAL
  • 16.8.2. INSTALLATION
  • 16.9. SEAT
  • 16.9.1. REMOVAL AND INSTALLATION
  • 16.10. CABIN
  • 16.10.1. REMOVAL AND INSTALLATION
  • 16.11. ENGINE HOOD
  • 16.11.1. REMOVAL AND INSTALLATION
  • 16.12. FRONT HOOD
  • 16.12.1. REMOVAL AND INSTALLATION
  • 16.13. HEATING FAN
  • 16.13.1. REMOVAL AND INSTALLATION
  • 16.14. HYDRAULIC OIL TANK
  • 16.14.1. REMOVAL AND INSTALLATION
  • 16.15. ENGINEPUMP GROUP
  • 16.16. ENGINEPUMP COUPLING JOINT
  • 16.16.1. REMOVAL AND INSTALLATION
  • 16.17. MAIN PUMP INPUT SHAFT OIL SEAL
  • 16.17.1. REMOVAL AND INSTALLATION
  • 16.18. GEAR PUMP
  • 16.18.1. REMOVAL AND INSTALLATION
  • 16.19. SWIVEL JOINT
  • 16.19.1. REMOVAL AND INSTALLATION
  • 16.20. SWING MOTOR
  • 16.20.1. REMOVAL AND INSTALLATION
  • 16.21. SWING MACHINERY
  • 16.21.1. REMOVAL AND INSTALLATION
  • 16.21.2. DISASSEMBLY
  • 16.21.3. ASSEMBLY
  • 16.22. CONTROL VALVE
  • 16.22.1. REMOVAL AND INSTALLATION
  • 16.23. REVOLVING FRAME
  • 16.23.1. REMOVAL
  • 16.23.2. INSTALLATION
  • 16.24. COUNTERWEIGHT
  • 16.24.1. REMOVAL AND INSTALLATION
  • 16.25. SWING CIRCLE
  • 16.25.1. REMOVAL AND INSTALLATION
  • 16.26. TRACK SHOES
  • 16.26.1. REMOVAL AND INSTALLATION
  • 16.27. SPROCKET ASSEMBLY
  • 16.27.1. REMOVAL AND INSTALLATION
  • 16.28. TRAVEL GEAR MOTOR
  • 16.28.1. REMOVAL AND INSTALLATION
  • 16.28.2. DISASSEMBLY
  • 16.28.3. ASSEMBLY
  • 16.29. BALL BEARING PRELOAD
  • 16.29.1. ADJUSTING
  • 16.30. AXIAL CLEARANCE ON TAPERED ROLLER BEARINGS
  • 16.30.1. ADJUSTING
  • 16.31. IDLER AND RECOIL SPRING ASSEMBLY
  • 16.31.1. REMOVAL AND INSTALLATION
  • 16.32. IDLER
  • 16.32.1. DISASSEMBLY AND ASSEMBLY
  • 16.33. RECOIL SPRING GROUP AND CYLINDER
  • 16.33.1. DISASSEMBLY AND ASSEMBLY
  • 16.34. TRACK ROLLER
  • 16.34.1. REMOVAL AND INSTALLATION
  • 16.35. CARRIER ROLLER
  • 16.35.1. REMOVAL AND INSTALLATION
  • 16.36. PPC VALVE (BOOMBUCKET)
  • 16.36.1. REMOVAL
  • 16.36.2. INSTALLATION
  • 16.37. PPC VALVE (ARMSWING)
  • 16.37.1. REMOVAL
  • 16.37.2. INSTALLATION
  • 16.38. BLADE PPC VALVE
  • 16.38.1. REMOVAL AND INSTALLATION
  • 16.39. TRAVEL PEDAL CONTROL
  • 16.39.1. REMOVAL AND INSTALLATION
  • 16.40. t BOOM SWING PEDAL CONTROL
  • 16.40.1. REMOVAL AND INSTALLATION
  • 16.41. BOOM CYLINDER (FOR 1PIECE BOOM)
  • 16.41.1. REMOVAL AND INSTALLATION
  • 16.42. BOOM CYLINDER (FOR 2PIECE BOOM)
  • 16.42.1. REMOVAL
  • 16.42.2. INSTALLATION
  • 16.43. d BOOM CYLINDERS
  • 16.43.1. REMOVAL
  • 16.43.2. INSTALLATION
  • 16.44. ARM CYLINDER
  • 16.44.1. REMOVAL AND INSTALLATION
  • 16.45. BUCKET CYLINDER
  • 16.45.1. REMOVAL AND INSTALLATION
  • 16.46. BOOM SWING CYLINDER
  • 16.46.1. REMOVAL AND INSTALLATION
  • 16.47. BLADE CYLINDER
  • 16.47.1. REMOVAL AND INSTALLATION
  • 16.48. WORK EQUIPMENT CYLINDERS
  • 16.48.1. DISASSEMBLY
  • 16.48.2. ASSEMBLY
  • 16.49. WORK EQUIPMENT (FOR 1PIECE BOOM)
  • 16.49.1. REMOVAL AND INSTALLATION
  • 16.50. WORK EQUIPMENT (FOR 2PIECE BOOM)
  • 16.50.1. REMOVAL
  • 16.50.2. INSTALLATION
  • 16.51. BUCKET
  • 16.51.1. REMOVAL AND INSTALLATION
  • 16.52. BOOM (FOR 1PIECE BOOM)
  • 16.52.1. REMOVAL AND INSTALLATION
  • 16.53. t BOOM
  • 16.53.1. REMOVAL
  • 16.53.2. INSTALLATION
  • 16.54. SWING BRACKET
  • 16.54.1. REMOVAL AND INSTALLATION
  • 16.55. BLADE
  • 16.55.1. REMOVAL AND INSTALLATION
  • 17. MAINTENANCE STANDARD
  • 17.1. SWING MACHINERY
  • 17.2. SERVOCONTROL FEED UNIT
  • 17.3. TRAVEL PPC VALVE
  • 17.4. PPC VALVE
  • 17.5. BLADE SAFETY VALVE
  • 17.6. CYLINDERS
  • 17.7. WORK EQUIPMENT (1PIECE BOOM)
  • 17.8. WORK EQUIPMENT (2PIECE BOOM)
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu PC75R-2 Hydraulic Excavator Shop Manual WEBM004000”

Your email address will not be published. Required fields are marked *