Description
-
Model List:
- WA800-2 Wheel Loader
- 1. MAIN MENU
- 2. COVER PAGE
- 3. TABLE OF CONTENTS
- 4. CHART OF SEPARATED UNITS
- 5. DIMENSIONS OF SEPARATED UNITS
- 6. ORDER FOR ASSEMBLY, FACILITIES TO USE, SCHEDULE FOR ASSEMBLY
- 7. WORK SPACE LAYOUT DIAGRAM
- 8. TOOLS AND EQUIPMENT TO USE
- 9. PARTS LIST FOR FIELD ASSEMBLY
- 10. PROCEDURE FOR FIELD ASSEMBLY
- 10.1. A1 SETTING BARE MACHINE ON SUPPORTS
- 10.2. A2 ASSEMBLY OF REAR AXLE
- 10.3. A3 ASSEMBLY OF FRONT AND REAR DRIVE SHAFT
- 10.4. A4 ASSEMBLY OF FRONT AXLE
- 10.5. A5 ASSEMBLY OF FUEL TANK
- 10.6. A6 ASSEMBLY OF LADDER (LEFT, RIGHT)
- 10.7. A7 ASSEMBLY OF FLOOR AND CAB ASSEMBLY
- 10.8. A8 ASSEMBLY OF HAND RAIL
- 10.9. A9 ASSEMBLY OF TIRE AND WHEEL ASSEMBLY
- 10.10. A10 ASSEMBLY OF BATTERY BOX ASSEMBLY
- 10.11. A10A ASSEMBLY OF COUNTERWEIGHT ASSEMBLY
- 10.12. A11 ASSEMBLY OF MUFFLER PIPE
- 10.13. A12 ASSEMBLY OF LIFT ARM ASSEMBLY
- 10.14. A13 ASSEMBLY OF FRONT FENDER
- 10.15. A14 ASSEMBLY OF FRONT LAMP ASSEMBLY
- 10.16. A15 ASSEMBLY OF ROPS CANOPY ASSEMBLY
- 10.17. A16 ASSEMBLY OF BUCKET
- 10.18. M1 BLEEDING AIR FROM BRAKE LINE
- 10.19. M2 GREASING WORK EQUIPMENT AND CHASSIS
- 10.20. M3 ADJUSTING BUCKET POSITIONER
- 10.21. M4 ADJUSTING BOOM KICKOUT
- 10.22. M5 INSPECTION OF ALL PARTS
- 10.23. M6 PROCEDURE FOR STARTING ENGINE
- 10.24. M7 PROCEDURE FOR BLEEDING AIR FROM PISTON PUMP
- 10.25. M8 PROCEDURE FOR BLEEDING AIR FROM WORK EQUIPMENT HYDRAULIC CIRCUIT
- 10.26. M9 CHARGING AIR CONDITIONER GAS
- 11. APPENDIX
- 11.1. FIELD ASSEMBLY INSPECTION REPORT
















There are no reviews yet.