Description
-
Model List:
- D475A-5E0 Bull Dozer
- D475ASD-5E0 Bull Dozer
- 1. COVER
- 2. Preface
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. DISPOSAL OF REMOVED PARTS
- 7. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 8. KIT LAYOUT DIAGRAM
- 9. STYLE FOR TRANSPORTATION
- 10. TOOLS LIST FOR FIELD ASSEMBLY
- 11. SKETCH OF TOOLS
- 12. TIGHTENING TORQUE
- 13. COATING MATERIALS
- 14. Assembly
- 14.1. A1 Setting of track shoe
- 14.2. A2 Setting of the machine
- 14.3. A3 Installation of blade lift hydraulic cylinder
- 14.4. A4 Installation of undercarriage
- 14.5. A5 Adding oil to pivot chamber
- 14.6. A6 Check of oil and coolant levels
- 14.7. A7 Installation of ripper
- 14.8. A8 Installation of trunnion
- 14.9. A9 Installation of track shoe
- 14.10. A10 Check track tension
- 14.11. A11 Assembly of blade
- 14.12. A12 Installation of blade
- 14.13. A13 Installation of operators cab
- 14.14. A14 Installation of ROPS
- 14.15. A15 Installing direction of exhaust pipe
- 14.16. A16 Installation of giant ripper shank
- 14.17. A17 Adjustment of arm joint (Ublade)
- 14.18. A18 Installation of counterweight
- 14.19. A19 Procedure for adjusting blad e tilt angle limit
- 14.20. A20 Method of checking autoreset system (Superdozer)
- 14.21. A21 Installation o f ORBCOMM antenna and wiring harness
- 14.22. A22 Installing lunchbox band (if equipped)
- 14.23. A23 Greasing each part of work equipment
- 14.24. A24 Bleeding air from hydraulic cylinders
- 14.25. A25 Air bleeding from wo rk equipment pump and fan pump
- 15. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 15.1. M1 Check and adjustment of operators cab
- 15.2. M2 Inspection of machine monitor
- 15.3. M3 Noinjection cranking of engine
- 15.4. M4 Setting procedure of user adjust mode
- 15.5. M5 Replacement of return filter (Replacement of standard filter special flushing parts)
- 15.6. M6 Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders (Part 1)
- 15.7. M7 Replacement of return filter (Replacement of special flushing parts standard filter)
- 15.8. M8 Bleeding air from hydraulic cylinders
- 16. APPENDIX 1. INSTALLATION OF SPILL GUARDS
- 17. APPENDIX 2. PRECAUTIONS FOR INITIALIZATION PROCEDURES FOR VHMS CONTROLLER
- 18. FIELD ASSEMBLY INSPECTION REPORT (UDOZER SPECIFICATION)
- 19. FIELD ASSEMBLY INSPECTION REPORT (SUPERDOZER SPECIFICATION)
















Reviews
There are no reviews yet.