Komatsu D575A-2 Bull Dozer Operation and Maintenance Manual SEAM000205T

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: SEAM000205T
  • Format: PDF
  • Size: 8.8MB
  • Number of Pages: 199

Description

  • Model List:

    • D575A-2 Bull Dozer
  • 1. COVER
  • 2. FOREWORD
  • 3. SAFETY INFORMATION
  • 4. INTRODUCTION
  • 5. LOCATION OF PLATES,TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 6. CONTENTS
  • 7. SAFETY
  • 7.1. GENERAL PRECAUTIONS
  • 7.2. PRECAUTIONS DURING OPERATION
  • 7.2.1. BEFORE STARTING ENGINE
  • 7.2.2. OPERATING MACHINE
  • 7.2.3. BATTERY
  • 7.3. PRECAUTIONS FOR MAINTENANCE
  • 7.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 7.3.2. DURING MAINTENANCE
  • 7.4. POSITION FOR ATTACHING SAFETY LABELS
  • 7.4.1. POSITION FOR ATTACHING SAFETY LABELS
  • 7.4.2. CONTENT AND USE OF WARNING PLATES
  • 8. OPERATION
  • 8.1. GENERAL VIEW
  • 8.1.1. GENERAL VIEW OF MACHINE
  • 8.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 8.2. EXPLANATION OF COMPONENTS
  • 8.2.1. MONITOR PANEL
  • 8.2.2. SWITCHES
  • 8.2.3. CONTROL LEVERS AND PEDALS
  • 8.2.4. FUSE BOX
  • 8.2.5. DOOR LOCK
  • 8.2.6. CAP WITH LOCK
  • 8.2.7. OPERATING THE CAR STEREO
  • 8.2.8. OPERATING THE AIR CONDITIONER
  • 8.3. OPERATION
  • 8.3.1. CHECK BEFORE STARTING ENGINE
  • 8.3.2. STARTING ENGINE
  • 8.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
  • 8.3.4. MOVING MACHINE
  • 8.3.5. SHIFTING GEAR
  • 8.3.6. SHIFTING BETWEEN FORWARD AND REVERSE
  • 8.3.7. STEERING MACHINE
  • 8.3.8. STOPPING MACHINE
  • 8.3.9. PRECAUTIONS FOR OPERATION
  • 8.3.10. WORK POSSIBLE USING BULLDOZER
  • 8.3.11. EFFECTIVE METHOD OF OPERATION FOR DUAL TILT DOZER
  • 8.3.12. OPERATING RIPPER
  • 8.3.13. ADJUSTMENT OF WORK EQUIPMENT
  • 8.3.14. PARKING MACHINE
  • 8.3.15. CHECK AFTER FINISHING WORK
  • 8.3.16. STOPPING ENGINE
  • 8.3.17. CHECK AFTER STOPPING ENGINE
  • 8.3.18. LOCKING
  • 8.3.19. TIPS FOR LONGER UNDERCARRIAGE LIFE
  • 8.4. HANDLING ACCUMULATOR
  • 8.5. COLD WEATHER OPERATION
  • 8.5.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 8.5.2. AFTER COMPLETION OF WORK
  • 8.5.3. AFTER COLD WEATHER
  • 8.6. LONGTERM STORAGE (MORE THAN ONE MONTH)
  • 8.6.1. BEFORE STORAGE
  • 8.6.2. DURING STORAGE
  • 8.6.3. AFTER STORAGE
  • 8.7. TROUBLESHOOTING
  • 8.7.1. AFTER RUNNING OUT OF FUEL
  • 8.7.2. IF BATTERY IS DISCHARGED
  • 8.7.3. OTHER TROUBLE
  • 9. MAINTENANCE
  • 9.1. GUIDES TO MAINTENANCE
  • 9.2. OUTLINES OF SERVICE
  • 9.2.1. OUTLINE OF OIL,FUEL,COOLANT
  • 9.2.2. RELATING TO ELECTRIC SYSTEM
  • 9.3. WEAR PARTS LIST
  • 9.4. USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 9.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 9.5.1. INTRODUCTION OF NECESSARY TOOLS
  • 9.5.2. TORQUE LIST
  • 9.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 9.7. MAINTENANCE SCHEDULE CHART
  • 9.8. SERVICE PROCEDURE
  • 9.8.1. INITIAL 250 HOURS SERVICE
  • 9.8.2. WHEN REQUIRED
  • 9.8.3. CHECK BEFORE STARTING
  • 9.8.4. EVERY 250 HOURS SERVICE
  • 9.8.5. EVERY 500 HOURS SERVICE
  • 9.8.6. EVERY 1000 HOURS SERVICE
  • 9.8.7. EVERY 2000 HOURS SERVICE
  • 9.8.8. EVERY 4000 HOURS SERVICE
  • 10. SPECIFICATIONS
  • 10.1. SPECIFICATIONS
  • 11. OPTIONS,ATTACHMENTS
  • 11.1. GENERAL PRECAUTIONS
  • 11.1.1. PRECAUTIONS RELATED TO SAFETY
  • 11.2. USING SEAT BELT
  • 11.2.1. FASTEN THE BELT AND REMOVE IT IN THE FOLLOWING MANNER
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu D575A-2 Bull Dozer Operation and Maintenance Manual SEAM000205T”

Your email address will not be published. Required fields are marked *