Komatsu D85C-21 PipeLayer Operation and Maintenance Manual PEN00333-00

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: PEN00333-00
  • Format: PDF
  • Size: 5.2MB
  • Number of Pages: 225

Description

  • Model List:

    • D85C-21 PipeLayer
  • 1. COVER
  • 2. FOREWORD
  • 2.1. FOREWORD
  • 2.2. SAFETY INFORMATION
  • 2.3. INTRODUCTION
  • 2.3.1. FRONT/REAR, LEFT/RIGHT DIRECTIONS OF MACHINE
  • 2.3.2. BREAKING IN THE MACHINE
  • 2.4. NECESSARY INFORMATION
  • 2.4.1. MACHINE SERIAL NO. PLATE AND POSITION
  • 2.4.2. ENGINE SERIAL NO. PLATE AND POSITION
  • 2.4.3. WINCH NUMBER PLATE POSITION
  • 2.4.4. POSITION OF SERVICE METER
  • 2.4.5. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 2.5. CONTENTS
  • 3. SAFETY
  • 3.1. SAFETY
  • 3.2. SAFETY LABELS
  • 3.2.1. POSITIONS OF SAFETY PICTOGRAMS
  • 3.2.2. SAFETY LABELS
  • 3.3. GENERAL PRECAUTIONS
  • 3.4. PRECAUTIONS FOR OPERATION
  • 3.4.1. BEFORE STARTING ENGINE
  • 3.4.2. OPERATION
  • 3.4.3. TRANSPORTATION
  • 3.4.4. BATTERY
  • 3.4.5. TOWING
  • 3.5. PRECAUTIONS FOR MAINTENANCE
  • 4. OPERATION
  • 4.1. GENERAL VIEW
  • 4.1.1. GENERAL VIEW OF MACHINE
  • 4.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 4.2. EXPLANATION OF COMPONENTS
  • 4.2.1. MACHINE INSTRUMENT PANEL
  • 4.2.2. CAB INSTRUMENT PANEL
  • 4.2.3. CONTROL LEVERS, PEDALS, HORN SWITCH
  • 4.2.4. FUSE BOX
  • 4.2.5. ASHTRAY
  • 4.2.6. HEATER, HANDLING
  • 4.2.7. AIR CONDITIONER, HANDLING
  • 4.3. OPERATION
  • 4.3.1. CHECK BEFORE STARTING ENGINE, ADJUST
  • 4.3.2. STARTING ENGINE (NORMAL, IN COLD WEATHER)
  • 4.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE (NORMAL, IN COLD WEATHER)
  • 4.3.4. STOPPING ENGINE
  • 4.3.5. MOVING MACHINE
  • 4.3.6. STOPPING MACHINE
  • 4.3.7. SHIFTING GEAR
  • 4.3.8. SHIFTING BETWEEN FORWARD AND REVERSE
  • 4.3.9. STEERING MACHINE
  • 4.3.10. PRECAUTIONS FOR OPERATION
  • 4.3.11. PARKING MACHINE
  • 4.3.12. CHECK AFTER FINISHING WORK
  • 4.3.13. LOCKING
  • 4.3.14. TIPS FOR LONGER UNDERCARRIAGE LIFE
  • 4.4. TRANSPORTATION
  • 4.4.1. TRANSPORTATION PROCEDURE
  • 4.4.2. LOADING, UNLOADING WORK
  • 4.4.3. PRECAUTIONS FOR LOADING
  • 4.4.4. METHOD OF LIFTING MACHINE
  • 4.4.5. PRECAUTIONS FOR TRANSPORTATION
  • 4.4.6. TRAVELING ON ROADS
  • 4.4.7. PROCEDURE FOR REMOVAL AND INSTALLATION OF BOOM
  • 4.4.8. PROCEDURE FOR REMOVAL AND INSTALLATION OF COUNTERWEIGHT
  • 4.4.9. PROCEDURE FOR REMOVAL AND INSTALLATION OF CAB
  • 4.5. COLD WEATHER OPERATION
  • 4.5.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 4.5.2. AFTER COMPLETION OF WORK
  • 4.5.3. AFTER COLD WEATHER
  • 4.6. LONGTERM STORAGE
  • 4.6.1. BEFORE STORAGE
  • 4.6.2. DURING STORAGE
  • 4.6.3. AFTER STORAGE
  • 4.7. TROUBLESHOOTING
  • 4.7.1. AFTER RUNNING OUT OF FUEL
  • 4.7.2. METHOD OF TOWING MACHINE
  • 4.7.3. IF BATTERY IS DISCHARGED
  • 4.7.4. OTHER TROUBLE
  • 5. MAINTENANCE
  • 5.1. GUIDES TO MAINTENANCE
  • 5.2. OUTLINES OF SERVICE
  • 5.2.1. HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
  • 5.2.2. OUTLINE OF ELECTRIC SYSTEM
  • 5.3. WEAR PARTS
  • 5.3.1. WEAR PARTS LIST
  • 5.4. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 5.4.1. PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
  • 5.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 5.5.1. TORQUE LIST
  • 5.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 5.6.1. SAFETY CRITICAL PARTS
  • 5.7. MAINTENANCE SCHEDULE CHART
  • 5.7.1. MAINTENANCE SCHEDULE CHART
  • 5.8. SERVICE PROCEDURE
  • 5.8.1. INITIAL 250 HOURS SERVICE (ONLY AFTER THE FIRST 250 HOURS)
  • 5.8.2. WHEN REQUIRED
  • 5.8.3. CHECK BEFORE STARTING
  • 5.8.4. EVERY 250 HOURS SERVICE
  • 5.8.5. EVERY 500 HOURS SERVICE
  • 5.8.6. EVERY 1000 HOURS SERVICE
  • 5.8.7. EVERY 2000 HOURS SERVICE
  • 5.8.8. EVERY 4000 HOURS SERVICE
  • 6. SPECIFICATIONS
  • 6.1. SPECIFICATIONS
  • 6.2. LIFTING LOAD CAPACITY CURVE
  • 7. ATTACHMENTS, OPTIONS
  • 7.1. GENERAL PRECAUTIONS
  • 7.1.1. PRECAUTIONS RELATED TO SAFETY
  • 7.2. USING SEAT BELT
  • 7.2.1. HANDLING SEAT BELT
  • 7.3. SELECTION OF TRACK SHOE
  • 7.3.1. SELECTION OF TRACK SHOES
  • 7.4. CAP WITH LOCK, HANDLING
  • 7.4.1. METHOD OF OPENING AND CLOSING CAP WITH LOCK
  • 7.5. REVERSIBLE FAN, HANDLING
  • 7.5.1. REVERSING REVERSIBLE FAN
  • 7.6. EXTERNAL POWER SOURCE ENGINE PREHEATING HEATER
  • 7.6.1. PROCEDURE FOR SETTING UP EXTERNAL POWER SOURCE
  • 7.6.2. PROCEDURE FOR HANDLING EXTERNAL POWER SUPPLY
  • 8. INDEX
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu D85C-21 PipeLayer Operation and Maintenance Manual PEN00333-00”

Your email address will not be published. Required fields are marked *