Komatsu LW250-3 Rough Terrain Crane Operation and Maintenance Manual SEAM002800

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: SEAM002800
  • Format: PDF
  • Size: 17.6MB
  • Number of Pages: 352

Description

  • Model List:

    • LW250-3 Rough Terrain Crane
  • 1. COVER
  • 2. FOREWORD
  • 3. SAFETY INFORMATION
  • 4. INTRODUCTION
  • 5. LOCATION OF PLATES,TABLE TO ENTER SERIAL NUMBER AND DISTRIBUTOR
  • 6. CONTENTS
  • 7. SAFETY
  • 7.1. GENERAL PRECAUTIONS
  • 7.2. PRECAUTIONS DURING OPERATION
  • 7.2.1. BEFORE STARTING ENGINE
  • 7.2.2. OPERATING MACHINE
  • 7.2.3. PRECAUTIONS WHEN TRAVELING
  • 7.2.4. PRECAUTIONS WHEN USING CRANE
  • 7.2.5. BATTERY
  • 7.2.6. TOWING
  • 7.3. PRECAUTIONS FOR MAINTENANCE
  • 7.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 7.3.2. DURING MAINTENANCE
  • 7.3.3. TIRES
  • 7.4. POSITION FOR ATTACHING SAFETY LABELS
  • 8. OPERATION
  • 8.1. GENERAL LOCATIONS
  • 8.1.1. GENERAL VIEW OF MACHINE
  • 8.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 8.2. EXPLANATION OF COMPONENTS
  • 8.2.1. OUTLINE OF INSIDE OF OPERATORS COMPARTMENT
  • 8.2.2. FRONT PANEL GROUP
  • 8.2.3. TOP PANEL GROUP
  • 8.2.4. SIDE PANEL GROUP
  • 8.2.5. PEDAL GROUP
  • 8.2.6. LEFT REAR COVER GROUP
  • 8.2.7. EXTERNAL CONTROL GROUP
  • 8.2.8. TACHOGRAPH
  • 8.2.9. ACCELERATOR LEVER
  • 8.2.10. OUTRIGGER CONTROL PANEL
  • 8.2.11. OPERATORS SEAT
  • 8.2.12. STEERING WHEEL
  • 8.2.13. ASSISTANTS SEAT
  • 8.2.14. SEAT BELT
  • 8.2.15. FUSE BOX
  • 8.2.16. DOOR OPEN LOCK
  • 8.2.17. CAR RADIO
  • 8.2.18. CAR COOLER
  • 8.2.19. CAR HEATER
  • 8.2.20. OSS EXTERNAL PILOT LAMP (OPTION)
  • 8.3. OPERATION
  • 8.3.1. CHECK BEFORE STARTING ENGINE
  • 8.3.2. STARTING ENGINE
  • 8.3.3. OPERATIONS,CHECKS AFTER STARTING ENGINE
  • 8.3.4. PREPARATIONS BEFORE MOVING MACHINE OFF (WHEN TRAVELING ON PUBLIC ROADS)
  • 8.3.5. MOVING MACHINE OFF
  • 8.3.6. SHIFTING GEAR
  • 8.3.7. TRAVELING DOWNHILL
  • 8.3.8. STEERING MACHINE
  • 8.3.9. STOPPING MACHINE
  • 8.3.10. TRAVELING ON ROUGH GROUND
  • 8.3.11. SWITCHING 4WHEEL DRIVE,HILOW (4WHEEL DRIVE,LO)
  • 8.3.12. SPECIAL TRAVEL
  • 8.3.13. SWITCHING BETWEEN FORWARD AND REVERSE
  • 8.3.14. PRECAUTIONS WHEN TRAVELING
  • 8.3.15. PRECAUTIONS BEFORE CRANE OPERATIONS
  • 8.3.16. OUTLINE OF CRANE OPERATIONS
  • 8.3.17. OUTRIGGER OPERATIONS
  • 8.3.18. WHEN OUTRIGGERS ARE NOT USED (ONTIRE OPERATIONS)
  • 8.3.19. MAIN WINCH OPERATIONS
  • 8.3.20. AUXILIARY WINCH OPERATIONS
  • 8.3.21. BOOM HOIST OPERATIONS
  • 8.3.22. BOOM TELESCOPE OPERATIONS
  • 8.3.23. BOOM TELESCOPE SELECTOR OPERATIONS
  • 8.3.24. SWING OPERATIONS
  • 8.3.25. POWER TILT JIB HOIST OPERATIONS
  • 8.3.26. ADJUSTING OPERATING SPEED
  • 8.3.27. PRECAUTIONS FOR OPERATION
  • 8.3.28. PARKING MACHINE
  • 8.3.29. CHECKS AFTER FINISHING OPERATION
  • 8.3.30. STOPPING ENGINE
  • 8.3.31. CHECK AFTER STOPPING ENGINE
  • 8.3.32. LOCKING
  • 8.3.33. HANDLING JIB
  • 8.3.34. HANDLING SINGLE TOP
  • 8.3.35. HANDLING WIRE ROPE
  • 8.3.36. SETTING OVERLOAD SAFETY SYSTEM(OSS)
  • 8.4. COLD WEATHER OPERATION
  • 8.4.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 8.4.2. PRECAUTIONS AFTER COMPLETION OF WORK
  • 8.4.3. AFTER COLD WEATHER
  • 8.5. LONGTERM STORAGE
  • 8.5.1. BEFORE STORAGE
  • 8.5.2. DURING STORAGE
  • 8.5.3. AFTER STORAGE
  • 8.6. TROUBLESHOOTING
  • 8.6.1. WHEN MACHINE RUNS OUT OF FUEL
  • 8.6.2. EMERGENCY TRAVEL OPERATION
  • 8.6.3. IF BATTERY IS DISCHARGED
  • 8.6.4. OTHER TROUBLE
  • 9. MAINTENANCE
  • 9.1. GUIDES TO MAINTENANCE
  • 9.2. OUTLINES OF SERVICE
  • 9.2.1. OUTLINE OF OIL,FUEL,COOLANT
  • 9.2.2. OUTLINE OF ELECTRIC SYSTEM
  • 9.3. WEAR PARTS LIST
  • 9.4. USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 9.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 9.5.1. INTRODUCTION OF NECESSARY TOOLS
  • 9.5.2. TORQUE LIST
  • 9.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 9.7. MAINTENANCE SCHEDULE CHART
  • 9.7.1. MAINTENANCE SCHEDULE CHART
  • 9.8. SERVICE PROCEDURE
  • 9.8.1. INITIAL 250 HOURS SERVICE
  • 9.8.2. WHEN REQUIRED
  • 9.8.3. CHECK BEFORE STARTING
  • 9.8.4. EVERY 50 HOURS SERVICE
  • 9.8.5. EVERY 100 HOURS SERVICE
  • 9.8.6. EVERY 250 HOURS SERVICE
  • 9.8.7. EVERY 500 HOURS SERVICE
  • 9.8.8. EVERY 1000 HOURS SERVICE
  • 9.8.9. EVERY 2000 HOURS SERVICE
  • 9.8.10. EVERY 4000 HOURS SERVICE
  • 10. SPECIFICATIONS
  • 10.1. SPECIFICATIONS
  • 11. OPERATIONS WITH ATTACHMENTS
  • 11.1. OPERATIONS WITH ATTACHMENTS
  • 11.2. HANDLING LEADER
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu LW250-3 Rough Terrain Crane Operation and Maintenance Manual SEAM002800”

Your email address will not be published. Required fields are marked *