Description
-
Model List:
- LW250-3 Rough Terrain Crane
- 1. COVER
- 2. FOREWORD
- 3. SAFETY INFORMATION
- 4. INTRODUCTION
- 5. LOCATION OF PLATES,TABLE TO ENTER SERIAL NUMBER AND DISTRIBUTOR
- 6. CONTENTS
- 7. SAFETY
- 7.1. GENERAL PRECAUTIONS
- 7.2. PRECAUTIONS DURING OPERATION
- 7.2.1. BEFORE STARTING ENGINE
- 7.2.2. OPERATING MACHINE
- 7.2.3. PRECAUTIONS WHEN TRAVELING
- 7.2.4. PRECAUTIONS WHEN USING CRANE
- 7.2.5. BATTERY
- 7.2.6. TOWING
- 7.3. PRECAUTIONS FOR MAINTENANCE
- 7.3.1. BEFORE CARRYING OUT MAINTENANCE
- 7.3.2. DURING MAINTENANCE
- 7.3.3. TIRES
- 7.4. POSITION FOR ATTACHING SAFETY LABELS
- 8. OPERATION
- 8.1. GENERAL LOCATIONS
- 8.1.1. GENERAL VIEW OF MACHINE
- 8.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 8.2. EXPLANATION OF COMPONENTS
- 8.2.1. OUTLINE OF INSIDE OF OPERATORS COMPARTMENT
- 8.2.2. FRONT PANEL GROUP
- 8.2.3. TOP PANEL GROUP
- 8.2.4. SIDE PANEL GROUP
- 8.2.5. PEDAL GROUP
- 8.2.6. LEFT REAR COVER GROUP
- 8.2.7. EXTERNAL CONTROL GROUP
- 8.2.8. TACHOGRAPH
- 8.2.9. ACCELERATOR LEVER
- 8.2.10. OUTRIGGER CONTROL PANEL
- 8.2.11. OPERATORS SEAT
- 8.2.12. STEERING WHEEL
- 8.2.13. ASSISTANTS SEAT
- 8.2.14. SEAT BELT
- 8.2.15. FUSE BOX
- 8.2.16. DOOR OPEN LOCK
- 8.2.17. CAR RADIO
- 8.2.18. CAR COOLER
- 8.2.19. CAR HEATER
- 8.2.20. OSS EXTERNAL PILOT LAMP (OPTION)
- 8.3. OPERATION
- 8.3.1. CHECK BEFORE STARTING ENGINE
- 8.3.2. STARTING ENGINE
- 8.3.3. OPERATIONS,CHECKS AFTER STARTING ENGINE
- 8.3.4. PREPARATIONS BEFORE MOVING MACHINE OFF (WHEN TRAVELING ON PUBLIC ROADS)
- 8.3.5. MOVING MACHINE OFF
- 8.3.6. SHIFTING GEAR
- 8.3.7. TRAVELING DOWNHILL
- 8.3.8. STEERING MACHINE
- 8.3.9. STOPPING MACHINE
- 8.3.10. TRAVELING ON ROUGH GROUND
- 8.3.11. SWITCHING 4WHEEL DRIVE,HILOW (4WHEEL DRIVE,LO)
- 8.3.12. SPECIAL TRAVEL
- 8.3.13. SWITCHING BETWEEN FORWARD AND REVERSE
- 8.3.14. PRECAUTIONS WHEN TRAVELING
- 8.3.15. PRECAUTIONS BEFORE CRANE OPERATIONS
- 8.3.16. OUTLINE OF CRANE OPERATIONS
- 8.3.17. OUTRIGGER OPERATIONS
- 8.3.18. WHEN OUTRIGGERS ARE NOT USED (ONTIRE OPERATIONS)
- 8.3.19. MAIN WINCH OPERATIONS
- 8.3.20. AUXILIARY WINCH OPERATIONS
- 8.3.21. BOOM HOIST OPERATIONS
- 8.3.22. BOOM TELESCOPE OPERATIONS
- 8.3.23. BOOM TELESCOPE SELECTOR OPERATIONS
- 8.3.24. SWING OPERATIONS
- 8.3.25. POWER TILT JIB HOIST OPERATIONS
- 8.3.26. ADJUSTING OPERATING SPEED
- 8.3.27. PRECAUTIONS FOR OPERATION
- 8.3.28. PARKING MACHINE
- 8.3.29. CHECKS AFTER FINISHING OPERATION
- 8.3.30. STOPPING ENGINE
- 8.3.31. CHECK AFTER STOPPING ENGINE
- 8.3.32. LOCKING
- 8.3.33. HANDLING JIB
- 8.3.34. HANDLING SINGLE TOP
- 8.3.35. HANDLING WIRE ROPE
- 8.3.36. SETTING OVERLOAD SAFETY SYSTEM(OSS)
- 8.4. COLD WEATHER OPERATION
- 8.4.1. PRECAUTIONS FOR LOW TEMPERATURE
- 8.4.2. PRECAUTIONS AFTER COMPLETION OF WORK
- 8.4.3. AFTER COLD WEATHER
- 8.5. LONGTERM STORAGE
- 8.5.1. BEFORE STORAGE
- 8.5.2. DURING STORAGE
- 8.5.3. AFTER STORAGE
- 8.6. TROUBLESHOOTING
- 8.6.1. WHEN MACHINE RUNS OUT OF FUEL
- 8.6.2. EMERGENCY TRAVEL OPERATION
- 8.6.3. IF BATTERY IS DISCHARGED
- 8.6.4. OTHER TROUBLE
- 9. MAINTENANCE
- 9.1. GUIDES TO MAINTENANCE
- 9.2. OUTLINES OF SERVICE
- 9.2.1. OUTLINE OF OIL,FUEL,COOLANT
- 9.2.2. OUTLINE OF ELECTRIC SYSTEM
- 9.3. WEAR PARTS LIST
- 9.4. USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
- 9.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 9.5.1. INTRODUCTION OF NECESSARY TOOLS
- 9.5.2. TORQUE LIST
- 9.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 9.7. MAINTENANCE SCHEDULE CHART
- 9.7.1. MAINTENANCE SCHEDULE CHART
- 9.8. SERVICE PROCEDURE
- 9.8.1. INITIAL 250 HOURS SERVICE
- 9.8.2. WHEN REQUIRED
- 9.8.3. CHECK BEFORE STARTING
- 9.8.4. EVERY 50 HOURS SERVICE
- 9.8.5. EVERY 100 HOURS SERVICE
- 9.8.6. EVERY 250 HOURS SERVICE
- 9.8.7. EVERY 500 HOURS SERVICE
- 9.8.8. EVERY 1000 HOURS SERVICE
- 9.8.9. EVERY 2000 HOURS SERVICE
- 9.8.10. EVERY 4000 HOURS SERVICE
- 10. SPECIFICATIONS
- 10.1. SPECIFICATIONS
- 11. OPERATIONS WITH ATTACHMENTS
- 11.1. OPERATIONS WITH ATTACHMENTS
- 11.2. HANDLING LEADER
















Reviews
There are no reviews yet.