Description
-
Model List:
- PC1250-8R Hydraulic Excavator
- PC1250SP-8R Hydraulic Excavator
- 1. COVER
- 2. FOREWARD
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. ASSEMBLING PROCEDURES,APPLICABLE EQUIPMENT AND SCHEDULE
- 7. KIT LAYOUT DIAGRAM
- 8. TRANSPORTATION
- 9. LIST OF TOOLS FOR FIELD ASSEMBLING
- 10. TIGHTENING TORQUE
- 11. COATING MATERIALS
- 12. LIST OF PARTS SENT INDIVIDUALLY
- 13. ASSEMBLY OF CHASSIS
- 13.1. A1 Installation of Left and Right Track Frames
- 13.2. A2 Installation of Travel Piping
- 13.3. A3 Installation of Travel Piping Co
- 13.4. A3 Installation of Travel Piping Co
- 13.5. A4 Installation of Steps
- 13.6. A5 Filling Swing Circle with Grease
- 13.7. A6 Assembly of Upper Structure and Undercarriage
- 13.8. A7 Installation of Right Side Steps
- 13.9. A8 Installation of Handrails
- 13.10. A9 Installation of Swivel Travel Piping
- 13.11. A10 Installation of Cover board (To the Counterweight)
- 13.12. A11 Installation of Counterweight
- 13.13. A12 Installation of Counterweight Wiring (Connection of HID light wiring on counterweigh
- 13.14. A13 Installation of Left Side Steps (Including handrails)
- 13.15. A14 Installation of Radiator Cover
- 13.16. A15 Installation of Muffler Tail Pipe
- 13.17. A16 Changing of Mounting Position of Step Light
- 13.18. A17 Installation of Handrail to the Cab
- 13.19. A18 Installation of Left Rearview Mirror
- 13.20. A19 Installation of Right Rearview Mirrors
- 13.21. A20 Preparation for Bleeding Air from Travel Motor
- 13.22. A21 Procedure for Bleeding Air From Hydraulic Circuit
- 13.23. A22 Permanent Tightening of Swing Circle Mounting Bolts
- 13.24. A23 Testing Track Shoe Tension
- 13.25. A24 Check Fuel, Coolant and Oil Levels
- 13.26. A25 Parts to be Touched up after Field Assembly
- 14. ASSEMBLING OF WORK EQUIPMENTOF BACKHOE
- 14.1. B1 Installation of Arm Cylinder
- 14.2. B2 Installation of Arm Cylinder Hoses
- 14.3. B3 Installation of Boom Cylinder Foot
- 14.4. B4 Installation of Boom Cylinder Hoses
- 14.5. B5 Installation of Boom Foot Dust Seal
- 14.6. B6 Installation of Boom Assembly
- 14.7. B7 Installation of Boom Cylinder
- 14.8. B8 Installation of Boom Hoses (Between machine and boom)
- 14.9. B9 Installation of Arm Assembly
- 14.10. B9 Installation of Arm Assembly
- 14.11. B10 Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
- 14.12. B11 Installation of Bucket Assembly
- 14.13. B12 Clearance Standard for Installation of Work Equipment
- 14.14. B13 Installation of Work Equipment Grease Piping
- 14.15. B14 Procedure for Bleeding Air From Travel Motor
- 14.16. B15 Bleeding Air from Swing Motor
- 14.17. B16 Bleeding Air from Cylinder
- 14.18. B17 Installation of Work Equipment Wiring
- 14.19. B18 Greasing after Assembling Work Equipment
- 15. PROCEDURE FOR INSPECTION AND MAINTENANCEAFTER COMPLETION OF ASSEMBLY
- 15.1. M1 Replacement of Return Filter (Standard Filter to Flushing Filter)
- 15.2. M2 Relieving Remaining Pressure from Hydraulic Circuit
- 15.3. M3 Installation of Flushing Tubes
- 15.4. M4 Flushing of Hydraulic Circuit
- 15.5. M5 Replacement of Pilot Filter (Flushing filter to Standard filter)
- 16. FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
















Reviews
There are no reviews yet.