Komatsu PC1250-8R, PC1250SP-8R Hydraulic Excavator Field Assembly Instruction GEN00118-00

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00118-00
  • Format: PDF
  • Size: 17.4MB
  • Number of Pages: 133

Description

  • Model List:

    • PC1250-8R Hydraulic Excavator
    • PC1250SP-8R Hydraulic Excavator
  • 1. COVER
  • 2. FOREWARD
  • 3. CONTENTS
  • 4. SPECIFICATIONS
  • 5. PRECAUTIONS FOR FIELD ASSEMBLY
  • 6. ASSEMBLING PROCEDURES,APPLICABLE EQUIPMENT AND SCHEDULE
  • 7. KIT LAYOUT DIAGRAM
  • 8. TRANSPORTATION
  • 9. LIST OF TOOLS FOR FIELD ASSEMBLING
  • 10. TIGHTENING TORQUE
  • 11. COATING MATERIALS
  • 12. LIST OF PARTS SENT INDIVIDUALLY
  • 13. ASSEMBLY OF CHASSIS
  • 13.1. A1 Installation of Left and Right Track Frames
  • 13.2. A2 Installation of Travel Piping
  • 13.3. A3 Installation of Travel Piping Co
  • 13.4. A3 Installation of Travel Piping Co
  • 13.5. A4 Installation of Steps
  • 13.6. A5 Filling Swing Circle with Grease
  • 13.7. A6 Assembly of Upper Structure and Undercarriage
  • 13.8. A7 Installation of Right Side Steps
  • 13.9. A8 Installation of Handrails
  • 13.10. A9 Installation of Swivel Travel Piping
  • 13.11. A10 Installation of Cover board (To the Counterweight)
  • 13.12. A11 Installation of Counterweight
  • 13.13. A12 Installation of Counterweight Wiring (Connection of HID light wiring on counterweigh
  • 13.14. A13 Installation of Left Side Steps (Including handrails)
  • 13.15. A14 Installation of Radiator Cover
  • 13.16. A15 Installation of Muffler Tail Pipe
  • 13.17. A16 Changing of Mounting Position of Step Light
  • 13.18. A17 Installation of Handrail to the Cab
  • 13.19. A18 Installation of Left Rearview Mirror
  • 13.20. A19 Installation of Right Rearview Mirrors
  • 13.21. A20 Preparation for Bleeding Air from Travel Motor
  • 13.22. A21 Procedure for Bleeding Air From Hydraulic Circuit
  • 13.23. A22 Permanent Tightening of Swing Circle Mounting Bolts
  • 13.24. A23 Testing Track Shoe Tension
  • 13.25. A24 Check Fuel, Coolant and Oil Levels
  • 13.26. A25 Parts to be Touched up after Field Assembly
  • 14. ASSEMBLING OF WORK EQUIPMENTOF BACKHOE
  • 14.1. B1 Installation of Arm Cylinder
  • 14.2. B2 Installation of Arm Cylinder Hoses
  • 14.3. B3 Installation of Boom Cylinder Foot
  • 14.4. B4 Installation of Boom Cylinder Hoses
  • 14.5. B5 Installation of Boom Foot Dust Seal
  • 14.6. B6 Installation of Boom Assembly
  • 14.7. B7 Installation of Boom Cylinder
  • 14.8. B8 Installation of Boom Hoses (Between machine and boom)
  • 14.9. B9 Installation of Arm Assembly
  • 14.10. B9 Installation of Arm Assembly
  • 14.11. B10 Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
  • 14.12. B11 Installation of Bucket Assembly
  • 14.13. B12 Clearance Standard for Installation of Work Equipment
  • 14.14. B13 Installation of Work Equipment Grease Piping
  • 14.15. B14 Procedure for Bleeding Air From Travel Motor
  • 14.16. B15 Bleeding Air from Swing Motor
  • 14.17. B16 Bleeding Air from Cylinder
  • 14.18. B17 Installation of Work Equipment Wiring
  • 14.19. B18 Greasing after Assembling Work Equipment
  • 15. PROCEDURE FOR INSPECTION AND MAINTENANCEAFTER COMPLETION OF ASSEMBLY
  • 15.1. M1 Replacement of Return Filter (Standard Filter to Flushing Filter)
  • 15.2. M2 Relieving Remaining Pressure from Hydraulic Circuit
  • 15.3. M3 Installation of Flushing Tubes
  • 15.4. M4 Flushing of Hydraulic Circuit
  • 15.5. M5 Replacement of Pilot Filter (Flushing filter to Standard filter)
  • 16. FIELD ASSEMBLY INSPECTION REPORT (BACKHOE)
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC1250-8R, PC1250SP-8R Hydraulic Excavator Field Assembly Instruction GEN00118-00”

Your email address will not be published. Required fields are marked *