Description
-
Model List:
- PC160LC-7E0 Hydraulic Excavator
- PC180LC-7E0 Hydraulic Excavator
- PC180NLC-7E0 Hydraulic Excavator
- 1. FOREWORD
- 1.1. FOREWORD
- 1.2. SAFETY INFORMATION
- 1.2.1. Noise emission levels
- 1.2.2. Vibration levels
- 1.3. INTRODUCTION
- 1.3.1. DIRECTIONS OF MACHINE
- 1.3.2. BREAKINGIN THE NEW MACHINE
- 1.4. PRODUCT INFORMATION
- 1.4.1. PRODUCT IDENTIFICATION NUMBER (PIN)/MACHINE SERIAL NO. PLATE
- 1.4.2. EPA REGULATIONS, ENGINE NUMBER PLATE
- 1.4.3. SERVICE METER LOCATION
- 1.4.4. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 1.4.5. MACHINE SERIAL PLATE
- 1.4.6. DECLARATION OF CONFORMITY
- 1.4.7. ATTACHMENTS AND OPTIONS
- 1.4.8. INDEX
- 1.4.9. COLOPHON
- 2. SAFETY
- 2.1. SAFETY INFORMATION
- 2.2. SAFETY LABELS
- 2.2.1. LOCATION OF SAFETY LABELS
- 2.2.2. SAFETY LABELS
- 2.3. SAFETY INFORMATION
- 2.4. SAFETY MACHINE OPERATION
- 2.4.1. STARTING ENGINE
- 2.4.2. OPERATION
- 2.4.3. TRANSPORTATION
- 2.4.4. Turn off the battery disconnect switch to the OFF position
- 2.4.5. BATTERY
- 2.4.6. TOWING
- 2.4.7. LIFTING OBJECTS WITH BUCKET
- 2.5. SAFETY MAINTENANCE INFORMATION
- 2.5.1. REMOVING BATTERY CABLES (for machines not fitted with battery disconnect switch only)
- 3. OPERATION
- 3.1. MACHINE VIEW ILLUSTRATIONS
- 3.1.1. OVERALL MACHINE VIEW
- 3.1.2. CONTROLS AND GAUGES
- 3.2. DETAILED CONTROLS AND GAUGES
- 3.2.1. MONITORING SYSTEM
- 3.2.2. SWITCHES
- 3.2.3. CONTROL LEVERS AND PEDALS
- 3.2.4. SUN ROOF
- 3.2.5. WINDSHIELD
- 3.2.6. EMERGENCY EXIT FROM OPERATORS CAB
- 3.2.7. AIR CONDITIONER CONTROLS
- 3.2.8. AUXILIARY ELECTRIC POWER
- 3.2.9. FUSE
- 3.2.10. FUSIBLE LINK
- 3.2.11. CONTROLLER
- 3.2.12. TOOL BOX
- 3.2.13. GREASE GUN HOLDER
- 3.2.14. REFUELLING PUMP
- 3.3. MACHINE OPERATIONS AND CONTROLS
- 3.3.1. BEFORE STARTING ENGINE
- 3.3.2. STARTING ENGINE
- 3.3.3. AMBIENT TEMPERATURE RANGE FOR OPERATION AND STORAGE
- 3.3.4. AFTER STARTING ENGINE
- 3.3.5. STOPPING THE ENGINE
- 3.3.6. MACHINE OPERATION
- 3.3.7. STEERING THE MACHINE
- 3.3.8. SWINGING
- 3.3.9. WORK EQUIPMENT CONTROLS AND OPERATIONS
- 3.3.10. WORKING MODE
- 3.3.11. PROHIBITED OPERATIONS
- 3.3.12. GENERAL OPERATION INFORMATION
- 3.3.13. TRAVELLING ON SLOPES
- 3.3.14. ESCAPE FROM MUD
- 3.3.15. RECOMMENDED APPLICATIONS
- 3.3.16. BUCKET REPLACEMENT AND INVERSION
- 3.3.17. PARKING MACHINE
- 3.3.18. MACHINE INSPECTION AFTER DAILY WORK
- 3.3.19. LOCKING
- 3.4. TRANSPORTATION
- 3.4.1. TRANSPORTATION PROCEDURE
- 3.4.2. LOADING AND UNLOADING WITH TRAILER
- 3.4.3. LIFTING MACHINE
- 3.5. COLD WEATHER OPERATION
- 3.5.1. COLD WEATHER OPERATION INFORMATION
- 3.5.2. AFTER DAILY WORK COMPLETION
- 3.5.3. AFTER COLD WEATHER SEASON
- 3.6. LONG TERM STORAGE
- 3.6.1. BEFORE STORAGE
- 3.6.2. DURING STORAGE
- 3.6.3. AFTER STORAGE
- 3.6.4. STARTING MACHINE AFTER LONGTERM STORAGE
- 3.7. TROUBLES AND ACTIONS
- 3.7.1. RUNNING OUT OF FUEL
- 3.7.2. PHENOMENA THAT ARE NOT FAILURES
- 3.7.3. TOWING THE MACHINE
- 3.7.4. LIGHTWEIGHT TOWING HOLE
- 3.7.5. SEVERE JOB CONDITION
- 3.7.6. DISCHARGED BATTERY
- 3.7.7. OTHER TROUBLE
- 4. MAINTENANCE
- 4.1. MAINTENANCE INFORMATION
- 4.2. OUTLINE OF SERVICE
- 4.2.1. HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
- 4.2.2. ELECTRIC SYSTEM MAINTENANCE
- 4.2.3. EXPLANATION OF LUBRICATION CHART DECAL
- 4.3. WEAR PARTS
- 4.3.1. WEAR PARTS LIST
- 4.4. RECOMMENDED FUEL, COOLANT, AND LUBRICANT
- 4.4.1. RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
- 4.5. TIGHTENING TORQUE SPECIFICATIONS
- 4.5.1. TIGHTENING TORQUE LIST
- 4.6. SAFETY CRITICAL PARTS
- 4.6.1. SAFETY CRITICAL PARTS LIST
- 4.7. MAINTENANCE SCHEDULE
- 4.7.1. MAINTENANCE SCHEDULE CHART
- 4.7.2. MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
- 4.8. MAINTENANCE PROCEDURE
- 4.8.1. INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
- 4.8.2. INITIAL 500 HOURS MAINTENANCE (ONLY AFTER THE FIRST 500 HOURS)
- 4.8.3. WHEN REQUIRED
- 4.8.4. CHECK BEFORE STARTING
- 4.8.5. EVERY 100 HOURS MAINTENANCE
- 4.8.6. EVERY 250 HOURS MAINTENANCE
- 4.8.7. EVERY 500 HOURS MAINTENANCE
- 4.8.8. EVERY 1000 HOURS MAINTENANCE
- 4.8.9. EVERY 2000 HOURS MAINTENANCE
- 4.8.10. EVERY 4000 HOURS MAINTENANCE
- 4.8.11. EVERY 5000 HOURS MAINTENANCE
- 4.8.12. EVERY 8000 HOURS MAINTENANCE
- 4.9. END OF SERVICE LIFE
- 5. SPECIFICATIONS
- 5.1. SPECIFICATIONS
- 5.1.1. PC160LC7E0, PC180LC7E0,PC180NLC7E0
- 5.1.2. WORKING RANGE 1PC BOOM
- 5.1.3. WORKING RANGE 2PC BOOM
- 5.2. EXPLANATION OF LIFTING CAPACITY CHART
- 5.2.1. MONOBOOM (PC160LC 7E0, PC180LC7E0, PC180NLC7E0)
- 5.3. EXPLANATION OF LIFTING CAPACITY CHART
- 5.3.1. PIECE BOOM (PC160LC 7E0, PC180lc7E0, PC180NLC7E0)
- 5.4. SPECIFICATIONS
- 5.4.1. PC160LGP7E0
- 6. ATTACHMENTS AND OPTIONS
- 6.1. ATTACHMENTS AND OPTIONS GENERAL INFORMATION
- 6.1.1. SAFETY FIRST
- 6.2. SPECIFICATIONS
- 6.2.1. Hydraulic specifications
- 6.2.2. ARM/PIN INFORMATION PC160/1807E0
- 6.2.3. ATTACHMENT INSTALLATION
- 6.3. BUCKET WITH HOOK
- 6.3.1. HOOK CONDITION
- 6.3.2. PROHIBITED OPERATIONS
- 6.4. MACHINES READY FOR ATTACHMENTS
- 6.4.1. EXPLANATION OF COMPONENTS
- 6.4.2. HYDRAULIC CIRCUIT
- 6.4.3. ATTACHMENT REMOVAL AND INSTALLATION
- 6.4.4. ATTACHMENT OPERATIONS
- 6.4.5. LONG TERM STORAGE
- 6.5. ATTACHMENT GUIDE
- 6.5.1. OTHER ATTACHMENTS
- 6.5.2. ATTACHMENT COMBINATIONS
- 6.5.3. BUCKET TEETH SELECTION
- 6.6. RECOMMENDED ATTACHMENT OPERATIONS
- 6.6.1. HYDRAULIC BREAKER
- 6.7. HANDLING MACHINES EQUIPPED WITH KOMTRAX
- 6.7.1. BASIC PRECAUTIONS
- 6.8. HYDRAULIC QUICK COUPLER PIPING
- 6.8.1. LOCATIONS
- 6.8.2. OPERATION
- 6.9. PC160LC7E0 PC180LC7E0 PC180NLC7E0 2PC BOOM
- 6.9.1. FEATURES OF 2PIECE BOOM ARM
- 6.9.2. OPERATION
- 6.9.3. TRANSPORTATION
- 6.9.4. LUBRICATING
















Reviews
There are no reviews yet.