Description
-
Model List:
- PC4000 Hydraulic Mining Shovel
- 1. MAIN MENU
- 2. COVER
- 3. GENERAL CONTENT
- 4. OVERVIEWS
- 4.1. OVERVIEW SUPERSTRUCTURE
- 4.2. OVERVIEW ENGINE HOUSE
- 5. GENERAL
- 5.1. DELIVERY OF THE EXCAVATOR
- 5.2. ASSEMBLING OF THE EXCAVATOR
- 5.3. TRANSPORTATION AND LIFTING
- 5.4. MANPOWER/ASSEMBLY TIME
- 5.5. ASSEMBLY SITE REQUIREMENTS
- 5.6. SPACE AND PLACING REQUIREMENTS
- 5.7. PREPARATION FOR ASSEMBLY
- 5.8. BASIC MEASUREMENTS AND WEIGHTS
- 5.9. TRANSPORT DIMENSIONS AND WEIGHTS
- 6. ASSEMBLY SEQUENCE
- 6.1. ASSEMBLY OF UNDERCARRIAGE
- 6.2. ASSEMBLY OF SUPERSTRUCTURE ONTO THE UNDERCARRIAGE
- 6.3. ASSEMBLY OF ENGINE HOUSE
- 6.4. MOUNTING OF BOOM
- 6.5. MOUNTING OF HYDRAULIC OIL TANK
- 6.6. MOUNTING OF HYDRAULIC OIL COOLER
- 6.7. MOUNTING OF FUEL TANK
- 6.8. MOUNTING OF HYDRAULIC ACCESS LADDER
- 6.9. MOUNTING OF CAB BASE
- 6.10. MOUNTING OF COUNTERWEIGHT
- 6.11. MOUNTING OF HANDRAILS, STEPS AND GRATINGS
- 6.12. MOUNTING OF CAB WITH SUPPORT FRAME
- 6.13. MOUNTING OF BUCKET CYLINDERS
- 6.14. FILLING UP HYDRAULIC TANK AND FUEL TANK
- 6.15. MOUNTING OF STICK
- 6.16. PRECHECKS PRIOR TO STARTUP
- 6.17. MOUNTING OF STICK CYLINDERS TO THE STICK
- 6.18. ASSEMBLY OF BULLCLAM BUCKET TO THE STICK
- 6.19. MOUNTING OF THE PIN SEALS
- 6.20. CONNECTION OF THE CABLE HARNESSES TO THE TERMINAL RAILS IN THE SWITCH BOX X2
- 6.21. PUTTING THE CENTRAL LUBRICATION SYSTEM INTO OPERATION
- 6.22. STANDARD APPLICATION TORQUE CHART
















Reviews
There are no reviews yet.