Komatsu PC4000-6 Hydraulic Mining Shovel Field Assembly Instruction FAM-PC4000-08205

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: FAM-PC4000-08205
  • Format: PDF
  • Size: 69.8MB
  • Number of Pages: 335

Description

  • Model List:

    • PC4000-6 Hydraulic Mining Shovel
  • 1. SAFETY
  • 1.1. SAFETY INFORMATION
  • 1.2. OVERVIEW
  • 1.3. SOUND PRESSURE LEVEL IN THE OPERATORS CAB.
  • 1.4. GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
  • 1.5. PRECAUTION FOR MAINTENANCE
  • 1.6. ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
  • 1.7. SPECIAL SAFETY EQUIPMENT
  • 1.8. ADDITIONAL SAFETY PRECAUTIONS FOR ASSEMBLY
  • 2. GENERAL
  • 2.1. GENERAL
  • 2.2. ASSEMBLY SITE REQUIREMENTS
  • 2.3. GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES
  • 3. ASSEMBLY SEQUENCE
  • 3.1. ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
  • 3.2. ASSEMBLY SEQUENCE OF BACKHOE MACHINES
  • 3.3. ASSEMBLY OF UNDERCARRIAGE
  • 3.4. MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE
  • 3.5. ASSEMBLY OF MACHINERY HOUSE ROOF
  • 3.6. MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM
  • 3.7. MOUNTING OF BATTERY BOX AND HYDRAULIC ACCESS LADDER
  • 3.8. CONNECTING ENGINE OIL RESERVE SYSTEM
  • 3.9. PREASSEMBLY OF FACE SHOVEL BOOM
  • 3.10. PREASSEMBLY OF BACKHOE BOOM
  • 3.11. MOUNTING OF COUNTERWEIGHT
  • 3.12. MOUNTING OF THE FUEL TANK
  • 3.13. ATTACHING THE CAB BASE
  • 3.14. ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE
  • 3.15. CONNECTING HYDRAULIC LINES BETWEEN MACHINERY HOUSE AND SUPERSTRUCTURE
  • 3.16. ATTACHING THE HYDRAULIC OIL RESERVOIR
  • 3.17. ATTACHING THE HYDRAULIC OIL COOLER
  • 3.18. CONNECTING SWING GEAR HYDRAULIC LINES
  • 3.19. CONNECTING THE RETURN AND PRESSURE OIL HOSES FROM VALVE BLOCK
  • 3.20. CONNECTING THE HOSE LINES OF THE TRANSFER PUMP
  • 3.21. CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT
  • 3.22. ATTACHING THE HANDRAILS, CATWALKS AND STEPS
  • 3.23. MOUNTING OF THE FIRE EXTINGUISHING TANK ASSEMBLIES
  • 3.24. CENTRAL REFILLING SYSTEM
  • 3.25. CONNECTING THE GREASE LINES OF THE AUTOMATIC LUBRICATION SYSTEMS
  • 3.26. MOUNTING THE CANNODE BOXES ONTO THE MACHINERY HOUSE ROOF
  • 3.27. PRECHECKS PRIOR TO INITIAL START UP
  • 3.28. FILLING AND BLEEDING THE HYDRAULIC SYSTEM
  • 3.29. ASSEMBLY FACE SHOVEL ATTACHMENT
  • 3.30. BLEEDING HYDRAULIC CIRCUITS
  • 3.31. ATTACHING FACE SHOVEL TO THE STICK
  • 3.32. ASSEMBLY BACKHOE ATTACHMENT
  • 3.33. BLEEDING HYDRAULIC CIRCUITS
  • 3.34. ATTACHING BACKHOE BUCKET TO THE STICK
  • 3.35. BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS
  • 4. FINAL CHECKS AND ADJUSTMENTS
  • 4.1. COMMISSIONING CHECK LIST
  • 4.2. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
  • 4.3. MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
  • 4.4. PRESSURE COMPENSATION OF SEALED COMPONENTS
  • 4.5. PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE
  • 4.6. COMMISSIONING OF THE AIR CONDITIONING
  • 4.7. PERFORM THE PMCLINIC PROCEDURE ACCORDING TO THE PMCLINIC MANUAL
  • 4.8. HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
  • 5. DISASSEMBLY OF THE MACHINE
  • 5.1. DISASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
  • 5.2. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
  • 5.3. DISASSEMBLY SEQUENCE OF BACKHOE MACHINES
  • 5.4. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
  • 5.5. DISPOSAL OF WASTE MATERIAL
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC4000-6 Hydraulic Mining Shovel Field Assembly Instruction FAM-PC4000-08205”

Your email address will not be published. Required fields are marked *