Description
-
Model List:
- PC600-6 Hydraulic Excavator
- 1. MAIN MENU
- 2. COVER PAGE
- 3. TABLE OF CONTENTS
- 4. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
- 5. TRANSPORTATION
- 6. PACKING STYLE FOR TRANSPORTATION
- 7. STEPS TO TAKE BEFORE AND AFTER ASSEMBLY
- 8. TIGHTENING TORQUE
- 9. INSTALLATION OF FOG
- 10. INSTALLATION OF REARVIEW MIRROR
- 11. INSTALLATION OF REARVIEW MIRROR
- 12. INSTALLATION OF HANDRAIL
- 13. INSTALLATION OF STEP
- 14. INSTALLATION OF LEFT SIDE STEP
- 15. INSTALLATION OF DECK GUARD
- 16. STICKING SEAT TO COUNTERWEIGHT
- 17. REMOVAL OF MUFFLER TAIL PIPE
- 18. INSTALLATION OF COUNTERWEIGHT
- 19. INSTALLATION OF MUFFLER TAIL PIPE
- 20. INSTALLATION OF RADIO ANTENNA
- 21. INSTALLATION OF LIGHT ON TOP OF CAB
- 22. EXTENSION AND RETRACTION OF TRACK FRAME GUAGE
- 23. INSTALLATION OF TRAVEL PIPING COVER
- 24. BOOM FOOT PIN, BOOM CYLINDER FOOT PIN
- 25. BOOM ASSEMBLY
- 26. INSTALLATION OF BOOM CYLINDER FOOT
- 27. INSTALLATION OF BOOM CYLINDER HOSES
- 28. INSTALLATION OF HOSES FROM CHASSIS ALONG TOP OF BOOM
- 29. BOOM CYLINDER
- 30. ARM CYLINDER
- 31. INSTALLATION OF ARM CYLINDER HOSES
- 32. INSTALLATION OF ARM ASSEMBLY
- 33. INSTALLATION OF BUCKET CYLINDER HOSES BETWEEN BOOM AND BUCKET CYLINDER
- 34. WORK EQUIPMENT PIPING FOR BUCKET CYLINDER BETWEEN BOOM AND BUCKET CYLINDER
- 35. WORK EQUIPMENT GREASE PIPING
- 36. WORK EQUIPMENT WIRING
















Reviews
There are no reviews yet.