Komatsu PC8000-6 Hydraulic Mining Shovel Field Assembly Instruction 12105up-EN-5

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: 12105up-EN-5
  • Format: PDF
  • Size: 18.3MB
  • Number of Pages: 481

Description

  • Model List:

    • PC8000-6 Hydraulic Mining Shovel
  • 1. SAFETY
  • 1.1. SAFETY INFORMATION
  • 1.2. OVERVIEW
  • 1.3. SOUND PRESSURE LEVEL IN THE OPERATORS CAB.
  • 1.4. GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
  • 1.5. PRECAUTION FOR MAINTENANCE
  • 1.6. ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
  • 1.7. SPECIAL SAFETY EQUIPMENT
  • 1.8. ADDITIONAL SAFETY PRECAUTIONS FOR ASSEMBLY
  • 2. GENERAL
  • 2.1. GENERAL
  • 2.2. ASSEMBLY SITE REQUIREMENTS
  • 2.3. LIFTING OF THE MAIN COMPONENTS
  • 2.4. GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES
  • 3. ASSEMBLY SEQUENCE
  • 3.1. ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
  • 3.2. ASSEMBLY SEQUENCE OF BACKHOE MACHINES
  • 3.3. ASSEMBLY OF UNDERCARRIAGE
  • 3.4. MOUNTING OF THE SLEW RING
  • 3.5. MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE
  • 3.6. CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT
  • 3.7. ASSEMBLY OF MACHINERY HOUSE ROOF
  • 3.8. MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM
  • 3.9. MOUNTING OF HYDRAULIC ACCESS LADDER
  • 3.10. CONNECTING ENGINE OIL RESERVE SYSTEM
  • 3.11. PREASSEMBLY OF FACE SHOVEL BOOM
  • 3.12. ATTACH BOOM TO SUPERSTRUCTRE AFRAME
  • 3.13. PREASSEMBLY OF BACKHOE BOOM
  • 3.14. ATTACH BOOM TO SUPERSTRUCTRE AFRAME
  • 3.15. MOUNTING OF THE COUNTERWEIGHT
  • 3.16. MOUNTING OF THE FUEL TANK
  • 3.17. MOUNTING OF THE CAB BASE
  • 3.18. ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE
  • 3.19. MOUNTING OF FRONT ROOF AND COVERING
  • 3.20. ATTACHING THE HYDRAULIC OIL RESERVOIR
  • 3.21. ATTACHING THE HYDRAULIC OIL COOLER
  • 3.22. ATTACHING THE HANDRAILS, CATWALKS AND STEPS
  • 3.23. ATTACHING THE SERVICE CRANE
  • 3.24. ATTACHING THE CENTRAL LUBRICATION UNIT
  • 3.25. CENTRAL REFILLING SYSTEM
  • 3.26. MOUNTING CANNODE BOXES ON MACHINERY HOUSE ROOF
  • 3.27. PRECHECKS PRIOR TO INITIAL START UP
  • 3.28. FILLING AND BLEEDING THE HYDRAULIC SYSTEM
  • 3.29. BLEEDING GEAR PUMPS FOR PTO GEAR LUBRICATION
  • 3.30. ASSEMBLY FACE SHOVEL ATTACHMENT
  • 3.31. BLEEDING THE HYDRAULIC CIRCUITS
  • 3.32. ATTACHING FACE SHOVEL TO THE STICK
  • 3.33. ATTACHING THE BACKHOE STICK TO THE BOOM
  • 3.34. BLEEDING THE HYDRAULIC CIRCUITS
  • 3.35. ATTACHING BACKHOE BUCKET TO THE STICK
  • 3.36. BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS
  • 4. FINAL CHECKS AND ADJUSTMENTS
  • 4.1. COMMISSIONING CHECK LIST
  • 4.2. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
  • 4.3. MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
  • 4.4. PRESSURE COMPENSATION OF SEALED COMPONENTS
  • 4.5. PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE
  • 4.6. COMMISSIONING OF THE AIR CONDITIONING
  • 4.7. PERFORM THE PMCLINIC PROCEDURE ACCORDING TO THE PMCLINIC MANUAL
  • 4.8. HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
  • 5. ORBCOMM INITIALIZATION
  • 5.1. ORBCOMM TERMINAL ACTIVATION
  • 5.2. WEBCARE BASIC INFORMATION FOR MACHINE REGISTRATION
  • 6. DISASSEMBLY OF THE MACHINE
  • 6.1. DISASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
  • 6.2. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
  • 6.3. DISASSEMBLY SEQUENCE OF BACKHOE MACHINES
  • 6.4. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
  • 6.5. DISPOSAL OF WASTE MATERIAL
  • 6.6. LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
  • 7. LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
  • 7.1. LIFTING OF THE MAIN COMPONENTS
  • 7.2. TRANSPORTATION OF THE MAIN COMPONENTS
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC8000-6 Hydraulic Mining Shovel Field Assembly Instruction 12105up-EN-5”

Your email address will not be published. Required fields are marked *