Komatsu PC950-11E0, PC950LC-11E0 Hydraulic Excavator Field Assembly Manual GEN00268-00

$30.00

  • Type Of Manual: Field Assembly Manual
  • Manual ID: GEN00268-00
  • Format: PDF
  • Size: 31.0MB
  • Number of Pages: 202

Description

  • Model List:

    • PC950-11E0 Hydraulic Excavator
    • PC950LC-11E0 Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. SAFETY INFORMATION
  • 4.1. SAFETY NOTICE FOR OPERATION
  • 4.2. PRECAUTIONS TO PREVENT FIRE
  • 4.3. ACTIONS IF FIRE OCCURS
  • 4.4. PRECAUTIONS FOR DISPOSING OF WASTE MATERIALS
  • 4.5. ACTIONS TAKEN TO MEET EXHAUST GAS REGULATIONS
  • 4.6. PRECAUTIONS FOR DEF
  • 4.7. STORE AdBlue/DEF
  • 4.8. PRECAUTIONS FOR HANDLING HYDRAULIC EQUIPMENT
  • 4.9. PRECAUTIONS FOR DISCONNECTION AND CONNECTION OF PIPINGS
  • 4.10. PRECAUTIONS FOR HANDLING ELECTRICAL EQUIPMENT
  • 4.11. PRECAUTIONS FOR HANDLING FUEL SYSTEM EQUIPMENT
  • 5. HANDLING OF TIEOFF ANCHOR POINTS
  • 6. BE CAREFUL NOT TO HIT BUCKET WHEN RETRACTING WORK EQUIPMENT
  • 7. SPECIFICATIONS
  • 8. PRECAUTIONS FOR FIELD ASSEMBLY
  • 9. DISPOSAL OF REMOVED PARTS
  • 10. ASSEMBLY PROCEDURE, FACILITY USED, AND SCHEDULE
  • 11. KIT LAYOUT DIAGRAM
  • 12. FLOW OF MAIN FIELD ASSEMBLY
  • 13. TRANSPORTATION PACKING STYLE
  • 14. FIELD ASSEMBLY TOOLS LIST
  • 15. TIGHTENING TORQUE
  • 16. COATING MATERIALS
  • 17. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
  • 18. SELECTION OF NYLON SLINGS USED FOR ASSEMBLY
  • 19. ASSEMBLY OF CHASSIS
  • 19.1. A1 Replacement of return filter (Standard > Flushing)
  • 19.2. A2 Installation of R.H. and L.H. track frames
  • 19.3. A3 Installation of travel piping (PC950)
  • 19.4. A3 Installation of travel piping (PC950LC)
  • 19.5. A4 Installation of step
  • 19.6. A5 Sticking revolving frame sheets
  • 19.7. A6 Installation of L.H. side step
  • 19.8. A7 Installation of R.H. side step
  • 19.9. A8 Installation of handrail
  • 19.10. A9 Installation of R.H. rearview mirror
  • 19.11. A10 Installation of L.H. rearview mirror
  • 19.12. A11 Sticking counterweight sheets
  • 19.13. A12 Assembly procedure of KomVision camera
  • 19.14. A13 Installation of counterweight revolving lamp (if equipped)
  • 19.15. A14 Installation of counterweight rear lamp
  • 19.16. A15 Installation of counterweight
  • 19.17. A16 Installation of cab top step lamp
  • 19.18. A17 Installation of cab revolving lamp (if equipped)
  • 19.19. A18 Bleed air from hydraulic pump
  • 19.20. A19 Bleed air from travel motor
  • 19.21. A20 Installation of travel piping covers (PC950)
  • 19.22. A20 Installation of travel piping covers (PC950LC)
  • 19.23. A21 Installation of track frame undercovers
  • 19.24. A22 Installation of travel motor guards
  • 19.25. A23 Adjustment of track tension
  • 19.26. A24 Installation of fire extinguisher (if equipped)
  • 19.27. A25 Installation of transportation jigs (muffler)
  • 20. Assembly of work equipment
  • 20.1. B1 Release pressure remaining in hydraulic circuit
  • 20.2. B2 Installation of boom cylinder to revolving frame
  • 20.3. B3 Installation of boom cylinder hoses
  • 20.4. B4 Bleed air from cylinder
  • 20.5. B5 Installation of dust seal to boom foot
  • 20.6. B5 Installation of arm dust seal
  • 20.7. B6 Installation of boom assembly
  • 20.8. B7 Installation of boom hoses (between machine and boom)
  • 20.9. B8 Installation of boom cylinder
  • 20.10. B9 Installation of arm assembly
  • 20.11. B10 Installation of hoses between boom and bucket cylinder
  • 20.12. B11 Installation of bucket assembly
  • 20.13. B12 Clearance standard for installation of work equipment
  • 20.14. B13 Installation of work equipment grease piping
  • 20.15. B14 Installation of work equipment lamp wiring
  • 20.16. B15 Greasing after assembling work equipment
  • 21. Testing and maintenance procedures after completing assembly
  • 21.1. M1 Check hydraulic tank oil level and add oil
  • 21.2. M2 Flushing of hydraulic circuit
  • 21.3. M3 Replacement of return filter (Flushing > Standard)
  • 21.4. M4 Check of oil and coolant levels at each section
  • 21.5. M5 Places to touch up after field assembly
  • 21.6. M6 Setting of KomVision (Camera calibration)
  • 21.7. M7 Inspection method of 12 m visibility (KomVision)
  • 21.8. M8 Check display of failure code
  • 21.9. M9 Installation of fuel tank oil filler lock
  • 22. Field assembly inspection check sheet
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC950-11E0, PC950LC-11E0 Hydraulic Excavator Field Assembly Manual GEN00268-00”

Your email address will not be published. Required fields are marked *