Description
-
Model List:
- D275A-5R Bull Dozer
- 1. Cover
- 2. Preface
- 3. Specifications
- 4. Assembly procedure, necessary equipment, and schedule
- 5. Layout of kit
- 6. Style for transportation
- 7. Tools list for field assembly
- 8. Sketch of tools
- 9. Tightening torque
- 10. Coating materials
- 11. Assembly
- 11.1. A1 Installation of chassis
- 11.2. A2 Installation of track frame
- 11.3. A3 Installation of ripper
- 11.4. A4 Adding oil to pivot chamber
- 11.5. A5 Installing track shoes
- 11.6. A6 Assembly of blade (For SemiUdozer Udozer)
- 11.7. A7 Assembly of blade (For Sigmadozer)
- 11.8. A8 Installation of blade
- 11.9. A9 Installation of operators cab
- 11.10. A10 Installation of ROPS
- 11.11. A11 Check track tension
- 11.12. A12 Check of oil and coolant levels
- 11.13. A13 Lubricating
- 11.14. A14 Bleeding air from hydraulic cylinders
- 11.15. A15 Installation of KOMTRAX antenna
- 11.16. A16 Installing lunchbox band (if equipped)
- 11.17. A16 Installing lunchbox band (if equipped)
- 12. Check and maintenance procedures after completion of assembly
- 12.1. M1 Check and adjustment of operators cab
- 12.2. M2 Inspection of machine monitor
- 13. Field assembly inspection report
















There are no reviews yet.