Description
-
Model List:
- D475A-3 Bull Dozer
- 1. COVER
- 2. TABLE OF CONTENTS
- 3. ASSEMBLY PROCEDURE TIME SCHEDULE
- 4. EQUIPMENT AND TOOLS TO BE USED
- 5. DIMENSIONS AND DISASSEMBLY DRAWINGS OF D475A3
- 6. TRANSPORTATION POSTURE
- 7. ASSEMBLY
- 7.1. INSTALLATION OF UNDERCARRIAGE
- 7.2. INSTALLATION OF TILT HOSE AND TRUNNION
- 7.3. INSTALLATION OF TRACK SHOE ASSY
- 7.4. INSTALLATION OF CAB
- 7.5. ASSEMBLY OF BLADE ASSY
- 7.6. INSTALLATION OF BLADE ASSY
- 7.7. INSTALLATION OF COUNTERWEIGHT
- 7.8. ADJUSTMENT OF UNDERCARRIAGE
- 7.9. INSTALLATION OF ROPS
- 7.10. ADJUSTMENT OF POTENTIONER ROD
- 7.11. SUPPLYING GREASE TO BLADE
- 7.12. INSTALLATION OF RIPPER
- 7.13. PROCEDURE MANUAL FOR INITIAL SETTING OF TILTING RESTRICTION SYSTEM
- 7.14. HOW TO CHECK AUTOMATIC RESETTING SYSTEM
- 8. BLEEDING AIR FROM HYDRAULIC CYLINDERS
- 9. USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
- 10. COATING MATERIALS
- 11. STANDARD TIGHTENING TORQUE
- 12. ADJUST CONTROL LOGIC TO SPECIFICATION
- 13. HOW TO MEASURE ENGINE RPM
- 14. ERROR CODE
- 15. HOW TO MEASURE FRONT PUMP PRESSURE
- 16. DRAWING OF JIGS
- 17. DIMENSION OF SHACKLE
- 18. ANNEX DATA 1
- 19. ANNEX DATA 2
- 20. FIELD ASSEMBLY INSPECTION REPORT(FOR U OR SEMI U TILT DOZER)
- 21. FIELD ASSEMBLY INSPECTION REPORT(FOR SUPER DOZER)
















There are no reviews yet.