Description
-
Model List:
- HD325-8 Dump Truck
- HD405-8 Dump Truck
- 1. Cover
- 2. Outline of separation (only for main components)
- 3. Dimensions of main components, Sales code 7HC16
- 4. Dimensions of main components, Sales code 7HC61
- 5. Dimensions of main components, Sales code 7HC62
- 6. Rough schedule of assembling and welding (for normal disassembly packing)
- 7. Layout of work space
- 8. Facility, jig and consumable parts list
- 9. Field assembly procedure
- 9.1. Oil, grease and coolant
- 9.2. Amount of oil, grease and coolant
- 9.3. Installation of tire and wheel assembly (front)
- 9.4. Installation of rear tires and wheel assembly HD325
- 9.5. Installation of rear tires and wheel assembly HD405
- 9.6. Installation of R.H. side mirror
- 9.7. Installation of R.H. platform mudguard HD325
- 9.8. Installation of R.H. platform mudguard HD405
- 9.9. Installation of R.H. platform antenna pole
- 9.10. Installation of R.H. platform antenna
- 9.11. Installation of bumper step
- 9.12. Installation of front under mirror
- 9.13. Installation of wheel chocks
- 9.14. Installation of L.H. catwalk mount
- 9.15. Installation of L.H. catwalk assembly
- 9.16. Fixing and connection of L.H. catwalk harness
- 9.17. Installation of wiring harness for mirror with heater at L.H. catwalk
- 9.18. Installation of L.H. catwalk harness cover
- 9.19. Connection of PLM harness
- 9.20. Installation of fender mudguard
- 9.21. Mounting of dump body
- 9.22. Removal of hoist cylinder fixing jig
- 9.23. Installation and shim adjustment of dump body pad
- 9.24. Shim adjustment of dump body securing pad
- 9.25. Installation of dump body mudguard HD325
- 9.26. Installation of dump body mudguard HD405
- 9.27. Installation of dump body rock ejector and lock pin
- 9.28. Connection and adjustment of dump angle sensor
- 9.29. Dump body control calibration
- 9.30. Air bleeding of hoist cylinder
- 9.31. Sticking of dump body decal HD325
- 9.32. Sticking of dump body decal HD405
- 9.33. Adjustment of mirror angle 1/2
- 9.34. Adjustment of mirror angle 2/2
- 9.35. Check and adding of each oil, etc.
- 9.36. Adjustment of suspension gas
- 10. Welding procedure
- 10.1. C0010 Preparation of dump body welding
- 10.2. C0020 Assembly work of dump body
- 10.3. C0030 Tack welding of dump body
- 10.4. C0040 Dump body welding
- 10.5. C0050 Dump body welding procedure 1
- 10.6. C0060 Dump body welding procedure 2
- 10.7. C0070 Dump body welding procedure 3
- 10.8. C0080 Dump body welding procedure 4
- 10.9. C0090 Turning over of dump body
- 10.10. C0100 Welding of dump body protector
- 10.11. C0110 Weld finishing and painting of dump body
- 10.12. C0120 Welding of dump body protector
- 10.13. B010 Installation of subassembly of the dump body CAB guard
- 10.14. B020 Installation of subassembly of the dump body platform guard 6HM57T
- 10.15. B030 Installation of subassembly of the dump body 150 CM spill guard
















Reviews
There are no reviews yet.