Komatsu PC12R-8, PC12R-8HS, PC15R-8, PC15R-8HS Hydraulic Excavator Operation and Maintenance Manual WEAM002703

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: WEAM002703
  • Format: PDF
  • Size: 13.5MB
  • Number of Pages: 210

Description

  • Model List:

    • PC12R-8 Hydraulic Excavator
    • PC12R-8HS Hydraulic Excavator
    • PC15R-8 Hydraulic Excavator
    • PC15R-8HS Hydraulic Excavator
  • 1. EAMPC12.PDF
  • 1.1. FOREWORD
  • 1.2. INFORMATION ON SAFETY
  • 1.3. INTRODUCTION
  • 1.3.1. INTENDED USES
  • 1.3.2. IMPROPER OR UNAUTHORIZED USES
  • 1.3.3. MAIN CHARACTERISTICS
  • 1.3.4. RUNNINGIN
  • 1.4. PRODUCT IDENTIFICATION
  • 1.4.1. MACHINE SERIAL NUMBER
  • 1.4.2. MACHINE IDENTIFICATION PLATE
  • 1.4.3. ENGINE SERIAL NUMBER AND EXHAUST GAS EMISSION PLATE
  • 1.4.4. TRAVEL REDUCTION GEAR SERIAL NUMBER
  • 1.4.5. SWING REDUCTION GEAR SERIAL NUMBER
  • 1.4.6. CAB SERIAL NUMBER
  • 1.5. TABLE OF CONTENTS
  • 1.5.1. SAFETY, NOISE AND VIBRATION PLATES
  • 1.5.2. GENERAL PRECAUTIONS
  • 1.5.3. PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE
  • 1.5.4. PRECAUTIONS TO BE TAKEN WHEN WORKING
  • 1.5.5. TRANSPORTING THE MACHINE ON MOTOR VEHICLES
  • 1.5.6. BATTERY
  • 1.5.7. PRECAUTIONS FOR THE REMOVAL
  • 1.5.8. PRECAUTIONS FOR MAINTENANCE
  • 1.6. POSITION
  • 1.7. COLOUR
  • 1.8. CAPACITY (A)
  • 1.9. INVOLVED CIRCUIT
  • 1.9.1. USE OF THE MACHINE
  • 1.9.2. PARKING THE MACHINE
  • 1.9.3. STOPPING THE ENGINE
  • 1.9.4. TRANSPORTING THE MACHINE ON MOTOR VEHICLES
  • 1.9.5. LIFTING THE MACHINE
  • 1.9.6. PRECAUTIONS TO BE TAKEN IN THE COLD SEASON
  • 1.10. CHARGE PERCENTAGE
  • 1.11. FLUID TEMPERATURE
  • 1.11.1. OTHER PRECAUTIONS
  • 1.11.2. PRECAUTIONS TO BE TAKEN AT THE END OF WORK
  • 1.11.3. PRECAUTIONS TO BE TAKEN IN THE WARM SEASON
  • 1.11.4. USING THE WORK EQUIPMENT
  • 1.11.5. USING THE MACHINE WITH VARIABLE TRACK GAUGE
  • 1.11.6. LONG PERIODS OF INACTIVITY
  • 1.11.7. TROUBLESHOOTING
  • 1.11.8. GUIDE TO MAINTENANCE
  • 1.11.9. MAINTENANCE NOTES
  • 1.12. Minimum ambient temperature (C)
  • 1.13. Quantity of antifreeze (l)
  • 1.14. Quantity of water (l)
  • 1.14.1. NOTES REGARDING THE HYDRAULIC SYSTEM
  • 1.14.2. NOTES REGARDING THE ELECTRICAL SYSTEM
  • 1.14.3. NOTES REGARDING LUBRICATION
  • 1.14.4. PARTS SUBJECT TO WEAR THAT PERIODICALLY NEED CHANGING
  • 1.17. EVERY 250 HOURS
  • 1.18. YM11930535150
  • 1.20. EVERY 500 HOURS
  • 1.21. YM12455055700
  • 1.23. EVERY 500 HOURS
  • 1.24. YM12905255630
  • 1.26. EVERY 500 HOURS
  • 1.27. YM11965512560
  • 1.29. EVERY 500 HOURS
  • 1.29.1. FUEL, COOLANT AND LUBRICANTS
  • 1.30. WATER ANTIFREEZE
  • 1.31. PERMANENT COOLANT
  • 1.31.1. LUBRICATION WITH GREASE
  • 1.32. NLGI 2
  • 1.33. SUPPLIER
  • 1.34. HEES SYNTHETIC BIODEGRADABLE OIL
  • 1.34.1. DRIVING TORQUES FOR SCREWS AND NUTS
  • 1.34.2. SPECIFIC DRIVING TORQUES
  • 1.35. 0.5 5.5 0.5
  • 1.36. 5 54 5
  • 1.37. 0.5
  • 1.38.1. LUBRICATION
  • 1.38.2. PERIODICAL CHANGE OF THE COMPONENTS CONNECTED WITH SAFETY
  • 1.43. Every 2 years or 4000 hours, whichever occurs first
  • 1.43.1. MAINTENANCE PLAN
  • 1.43.2. MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER (BREAKER)
  • 1.45.1. CHECKS BEFORE STARTING
  • 1.45.2. MAINTENANCE EVERY 100 HOURS OF OPERATION
  • 1.45.3. MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION (Operations to be carried out together w…
  • 1.47.1. MAINTENANCE EVERY 250 HOURS OF OPERATION
  • 1.47.2. MAINTENANCE EVERY 500 HOURS OF OPERATION
  • 1.47.3. MAINTENANCE EVERY 1000 HOURS OF OPERATION
  • 1.48.1. MAINTENANCE EVERY 2000 HOURS OF OPERATION
  • 1.48.2. WHEN REQUIRED
  • 1.48.3. MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER (BREAKER)
  • 1.48.4. MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION (Only for machines in which the synthetic…
  • 1.48.5. MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION
  • 1.48.6. MAINTENANCE EVERY 250 HOURS OF OPERATION
  • 1.48.7. MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION (Only for machines in which the syntheti…
  • 1.48.8. MAINTENANCE EVERY 500 HOURS OF OPERATION
  • 1.48.9. MAINTENANCE EVERY 1000 HOURS OF OPERATION
  • 1.48.10. MAINTENANCE EVERY 2000 HOURS OF OPERATION
  • 1.49. TECHNICAL DATA
  • 1.49.1. STANDARD OVERALL DIMENSIONS PC12R
  • 1.49.2. TECHNICAL CHARACTERISTICS PC12R
  • 1.49.3. TOTAL MASS
  • 1.49.4. STANDARD BUCKET CAPACITY
  • 1.49.5. ENGINE
  • 1.49.6. ELECTRICAL SYSTEM
  • 1.49.7. UPPER STRUCTURE ROTATION
  • 1.49.8. SPEEDS
  • 1.49.9. TOTAL MASS
  • 1.49.10. STANDARD BUCKET CAPACITY
  • 1.49.11. ENGINE
  • 1.49.12. ELECTRICAL SYSTEM
  • 1.49.13. UPPER STRUCTURE ROTATION
  • 1.49.14. SPEEDS
  • 1.49.15. TOTAL MASS
  • 1.49.16. STANDARD BUCKET CAPACITY
  • 1.49.17. ENGINE
  • 1.49.18. ELECTRICAL SYSTEM
  • 1.49.19. UPPER STRUCTURE ROTATION
  • 1.49.20. SPEEDS
  • 1.49.21. TOTAL MASS
  • 1.49.22. STANDARD BUCKET CAPACITY
  • 1.49.23. ENGINE
  • 1.49.24. ELECTRICAL SYSTEM
  • 1.49.25. UPPER STRUCTURE ROTATION
  • 1.49.26. SPEEDS
  • 1.49.27. AUTHORIZED OPTIONAL EQUIPMENT
  • 1.49.28. (PC15RPC15R HS)
  • 1.49.29. ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC12R-8, PC12R-8HS, PC15R-8, PC15R-8HS Hydraulic Excavator Operation and Maintenance Manual WEAM002703”

Your email address will not be published. Required fields are marked *