Komatsu PC200Z-6LE Hydraulic Excavator Shop Manual CEBM001700

$50.00

  • Type Of Manual: Shop Manual
  • Manual ID: CEBM001700
  • Format: PDF
  • Size: 10.4MB
  • Number of Pages: 485

Description

  • Model List:

    • PC200Z-6LE Hydraulic Excavator
  • 1. MAIN MENU
  • 2. COVER
  • 3. CONTENTS
  • 4. GENERAL
  • 4.1. GENERAL ASSEMBLY DRAWING
  • 4.2. SPECIFICATIONS
  • 4.3. WEIGHT TABLE
  • 4.4. FUEL, COOLANT AND LUBRICANTS
  • 4.5. ENGINE OIL SPECIFICATION
  • 4.5.1. NORMAL OPERATION
  • 4.5.2. ARCTIC OPERATION
  • 4.6. COOLANT
  • 5. STRUCTURE AND FUNCTION
  • 5.1. ENGINE RELATED PARTS
  • 5.1.1. SPECIFICATIONS
  • 5.2. RADIATOR OIL COOLER
  • 5.2.1. SPECIFICATIONS
  • 5.3. ENGINE CONTROL SYSTEM
  • 5.4. SWING MACHINERY
  • 5.4.1. SPECIFICATIONS
  • 5.5. TRACK FRAME RECOIL SPRING
  • 5.5.1. SPECIFICATIONS
  • 5.6. TRACK SHOE
  • 5.6.1. STANDARD SHOE
  • 5.6.2. SELECTION OF TRACK SHOE
  • 5.7. HYDRAULIC PIPING DRAWING
  • 5.8. HYDRAULIC CIRCUIT DIAGRAM
  • 5.8.1. LS and PC valve
  • 5.9. INLINE OIL FILTER
  • 5.9.1. Outline
  • 5.10. CONTROL VALVE
  • 5.10.1. Outline
  • 5.10.2. spool valve (standard)
  • 5.11. SAFETYSUCTION VALVE FOR SERVICE VALVE
  • 5.12. SELFREDUCING PRESSURE VALVE
  • 5.12.1. Function
  • 5.12.2. Operation
  • 5.13. CLSS
  • 5.13.1. Outline of CLSS
  • 5.13.2. Operation for each function and valve
  • 5.13.3. Operation of CLSS system as a whole
  • 5.14. SWING MOTOR
  • 5.14.1. BASIC MOTOR
  • 5.14.2. Swing lock valve
  • 5.14.3. Reverse prevention valve (swing dampening)
  • 5.15. CENTER SWIVEL JOINT
  • 5.16. TRAVEL MOTOR
  • 5.16.1. Operation of parking brake
  • 5.16.2. Operation of brake valve
  • 5.17. VALVE CONTROL
  • 5.18. WORK EQUIPMENT SWING PPC VALVE
  • 5.18.1. Operation
  • 5.19. TRAVEL PPC VALVE
  • 5.19.1. Operation
  • 5.20. SERVICE PPC VALVE
  • 5.20.1. Operation
  • 5.21. ACCUMULATOR
  • 5.21.1. Function
  • 5.21.2. Operation
  • 5.22. STRAIGHTTRAVEL SYSTEM
  • 5.22.1. Function
  • 5.23. EPC SOLENOID VALVE
  • 5.23.1. Operation
  • 5.24. BOOM LOCK VALVE
  • 5.24.1. Operation
  • 5.25. ADDITIONAL FILTER FOR BREAKER
  • 5.26. WORK EQUIPMENT
  • 5.27. AIR CONDITIONER
  • 5.28. ELECTRICAL WIRING DIAGRAM
  • 5.29. ELECTRICAL CIRCUIT DIAGRAM
  • 5.29.1. ELECTRICAL CIRCUIT DIAGRAM FOR AIR CONDITIONER
  • 5.30. ELECTRIC CONTROL SYSTEM
  • 5.30.1. TOTAL SYSTEM DIAGRAM
  • 5.30.2. PUMP CONTROL FUNCTION
  • 5.30.3. SWING LOCK, PPC LOCK FUNCTION
  • 5.31. MACHINE MONITOR SYSTEM
  • 5.31.1. FUNCTION
  • 5.31.2. Monitor panel
  • 5.32. SENSORS
  • 5.32.1. Engine oil pressure sensor
  • 5.32.2. Coolant temperature sensor
  • 5.32.3. Fuel level sensor
  • 6. TESTING, ADJUSTING AND TROUBLESHOOTING
  • 6.1. TESTING AND ADJUSTING
  • 6.1.1. STANDARD VALUE TABLE
  • 6.1.2. TOOLS FOR TESTING, ADJUSTING AND TROUBLESHOOTING
  • 6.1.3. MEASURING ENGINE SPEED
  • 6.1.4. MEASURING EXHAUST GAS COLOR
  • 6.1.5. ADJUSTING VALVE CLEARANCE
  • 6.1.6. MEASURING COMPRESSION PRESSURE
  • 6.1.7. MEASURING BLOWBY PRESSURE
  • 6.1.8. TESTING AND ADJUSTING FUEL INJECTION TIMING
  • 6.1.9. MEASURE ENGINE OIL PRESSURE
  • 6.1.10. TESTING AND ADJUSTING FAN BELT TENSION
  • 6.1.11. TESTING AND ADJUSTING BELT TENSION FOR AIR CONDITIONER COMPRESSOR
  • 6.1.12. ADJUSTING SPEED SENSOR
  • 6.1.13. ADJUSTING FUEL CONTROL LEVER
  • 6.1.14. TESTING AND ADJUSTING HYDRAULIC PRESSURE IN WORK EQUIPMENT, SWING, AND TRAVEL CIRCUIT
  • 6.1.15. TESTING AND ADJUSTING PC VALVE OUTPUT PRESSURE (SERVO PISTON INPUT PRESSURE)
  • 6.1.16. TESTING AND ADJUSTING LS VALVE OUTPUT PRESSURE (SERVO PISTON INPUT PRESSURE AND LS DIFFERENTIAL PRESSURE)
  • 6.1.17. TESTING AND ADJUSTING CONTROL CIRCUIT OIL PRESSURE
  • 6.1.18. TESTING SOLENOID VALVE OUTPUT PRESSURE
  • 6.1.19. MEASURING PPC VALVE OUTPUT PRESSURE
  • 6.1.20. ADJUSTING WORK EQUIPMENT SWING PPC VALVE
  • 6.1.21. TESTING TRAVEL DEVIATION
  • 6.1.22. TESTING LOCATIONS CAUSING HYDRAULIC DRIFT OF WORK EQUIPMENT
  • 6.1.23. MEASURING OIL LEAKAGE
  • 6.1.24. RELEASING REMAINING PRESSURE IN HYDRAULIC CIRCUIT
  • 6.1.25. TESTING CLEARANCE OF SWING CIRCLE BEARING
  • 6.1.26. TESTING AND ADJUSTING TRACK SHOE TENSION
  • 6.1.27. BLEEDING AIR
  • 6.2. TROUBLESHOOTING
  • 6.2.1. POINTS TO REMEMBER WHEN TROUBLESHOOTING
  • 6.2.2. SEQUENCE OF EVENTS IN TROUBLESHOOTING
  • 6.2.3. POINTS TO REMEMBER WHEN CARRYING OUT MAINTENANCE
  • 6.2.4. CHECKS BEFORE TROUBLESHOOTING
  • 6.2.5. CONNECTOR TYPES AND MOUNTING LOCATIONS
  • 6.2.6. CONNECTION TABLE FOR CONNECTOR PIN NUMBERS
  • 6.2.7. METHOD OF USING TROUBLESHOOTING CHARTS
  • 6.2.8. TROUBLESHOOTING OF ENGINE SYSTEM (S MODE)
  • 6.2.9. TROUBLESHOOTING OF ELECTRICAL SYSTEM (E MODE)
  • 6.2.10. TROUBLESHOOTING OF HYDRAULIC AND MECHANICAL SYSTEM (H MODE)
  • 6.2.11. TROUBLESHOOTING OF MACHINE MONITOR SYSTEM (M MODE)
  • 7. DISASSEMBLY AND ASSEMBLY
  • 7.1. METHOD OF USING MANUAL
  • 7.1.1. When removing or installing unit assemblies
  • 7.1.2. General precautions
  • 7.1.3. Listing of special tools
  • 7.2. PRECAUTIONS WHEN CARRYING OUT OPERATION
  • 7.2.1. Precautions when carrying out removal work
  • 7.2.2. Precautions when carrying out installation work
  • 7.2.3. Precautions when completing the operations
  • 7.3. SPECIAL TOOL LIST
  • 7.4. SKETCHES OF SPECIAL TOOLS
  • 7.5. AIR CONDITIONER COMPRESSOR
  • 7.6. FUEL INJECTION PUMP
  • 7.7. CYLINDER HEAD ASSEMBLY
  • 7.7.1. Removal
  • 7.7.2. Installation
  • 7.8. RADIATOR, HYDRAULIC OIL COOLER ASSEMBLY
  • 7.8.1. Removal
  • 7.8.2. Installation
  • 7.9. ENGINE, MAIN PUMP
  • 7.10. CENTER SWIVEL JOINT
  • 7.11. SWING MACHINERY
  • 7.11.1. Removal
  • 7.11.2. Installation
  • 7.11.3. Disassembly
  • 7.11.4. Assembly
  • 7.12. REVOLVING FRAME
  • 7.13. IDLER RECOIL SPRING
  • 7.14. MAIN PUMP INPUT SHAFT OIL SEAL
  • 7.15. PUMP MERGEDIVIDER VALVE
  • 7.15.1. Disassembly
  • 7.15.2. Assembly
  • 7.16. MAIN RELIEF VALVE
  • 7.17. WORK EQUIPMENT SWING PPC VALVE
  • 7.17.1. Removal
  • 7.17.2. Installation
  • 7.17.3. Disassembly
  • 7.17.4. Assembly
  • 7.18. TRAVEL PPC VALVE
  • 7.18.1. Removal
  • 7.18.2. Installation
  • 7.18.3. Disassembly
  • 7.18.4. Installation
  • 7.19. BOOM LOCK VALVE
  • 7.20. BUCKET CYLINDER
  • 7.20.1. Removal
  • 7.20.2. Installation
  • 7.21. HYDRAULIC CYLINDER
  • 8. MAINTENANCE STANDARD
  • 8.1. SWING MACHINERY
  • 8.2. SWING CIRCLE
  • 8.3. FINAL DRIVE
  • 8.4. TRACK FRAME RECOIL SPRING
  • 8.5. SAFETYSUCTION VALVE FOR SERVICE VALVE
  • 8.6. SELFREDUCING PRESSURE VALVE
  • 8.7. SWING MOTOR
  • 8.8. TRAVEL MOTOR
  • 8.9. WORK EQUIPMENT SWING PPC VALVE
  • 8.10. TRAVEL PPC VALVE
  • 8.11. SERVICE PPC VALVE
  • 8.12. CENTER SWIVEL JOINT
  • 8.13. BOOM LOCK VALVE
  • 8.14. HYDRAULIC CYLINDER
  • 8.14.1. Boom cylinder
  • 8.14.2. Arm cylinder
  • 8.14.3. Bucket cylinder
  • 8.15. WORK EQUIPMENT
  • 8.16. DIMENSION OF WORK EQUIPMENT
  • 8.16.1. Arm portion
  • 8.16.2. Bucket portion
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC200Z-6LE Hydraulic Excavator Shop Manual CEBM001700”

Your email address will not be published. Required fields are marked *