Komatsu PC25-1, PC30-1, PC40-1, PC45-1 Hydraulic Excavator Operation and Maintenance Manual SEAM006600

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: SEAM006600
  • Format: PDF
  • Size: 9.2MB
  • Number of Pages: 213

Description

  • Model List:

    • PC25-1 Hydraulic Excavator
    • PC30-1 Hydraulic Excavator
    • PC40-1 Hydraulic Excavator
    • PC45-1 Hydraulic Excavator
  • 1. MAIN MENU
  • 2. COVER
  • 3. FOREWORD
  • 4. SAFETY INFORMATION
  • 5. INTRODUCTION
  • 5.1. INTENDED USE
  • 5.2. FEATURES
  • 5.3. BREAKING IN THE MACHINE
  • 6. LOCATION OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 6.1. MACHINE SERIAL NO. PLATE POSITION
  • 6.2. ENGINE SERIAL NO. PLATE POSITION
  • 6.3. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 7. CONTENTS
  • 8. SAFETY
  • 8.1. GENERAL PRECAUTIONS
  • 8.2. PRECAUTIONS DURING OPERATION
  • 8.2.1. BEFORE STARTING ENGINE
  • 8.2.2. OPERATING MACHINE
  • 8.2.3. TRANSPORTATION
  • 8.2.4. BATTERY
  • 8.2.5. TOWING
  • 8.2.6. BUCKET WITH HOOK
  • 8.3. PRECAUTIONS FOR MAINTENANCE
  • 8.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 8.3.2. DURING MAINTENANCE
  • 8.4. POSITION FOR ATTACHING SAFETY LABELS
  • 9. OPERATION
  • 9.1. GENERAL VIEW
  • 9.1.1. GENERAL VIEW OF MACHINE
  • 9.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 9.2. EXPLANATION OF COMPONENTS
  • 9.2.1. MACHINE MONITOR
  • 9.2.2. SWITCHES
  • 9.2.3. CONTROL LEVERS AND PEDALS
  • 9.2.4. ENGINE HOOD
  • 9.2.5. FRONT WINDOW (MACHINES EQUIPPED WITH CAB)
  • 9.2.6. DOOR LOCK
  • 9.2.7. FUSE
  • 9.2.8. FUSIBLE LINK
  • 9.2.9. CAP, COVER WITH LOCK
  • 9.2.10. CANOPY (MACHINES EQUIPPED WITH CANOPY)
  • 9.3. OPERATION
  • 9.3.1. CHECK BEFORE STARTING ENGINE
  • 9.3.2. STARTING ENGINE
  • 9.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
  • 9.3.4. MOVING MACHINE OFF
  • 9.3.5. STEERING MACHINE
  • 9.3.6. STOPPING MACHINE
  • 9.3.7. SWINGING
  • 9.3.8. OPERATION OF WORK EQUIPMENT
  • 9.3.9. PROHIBITIONS FOR OPERATION
  • 9.3.10. PRECAUTIONS FOR OPERATION
  • 9.3.11. PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
  • 9.3.12. HOW TO ESCAPE MUD
  • 9.3.13. WORK POSSIBLE USING HYDRAULIC EXCAVATOR
  • 9.3.14. REPLACEMENT OF BUCKET
  • 9.3.15. PARKING MACHINE
  • 9.3.16. CHECK AFTER FINISHING WORK
  • 9.3.17. STOPPING ENGINE
  • 9.3.18. CHECK AFTER STOPPING ENGINE
  • 9.3.19. LOCKING
  • 9.3.20. HANDLING RUBBER SHOES (RUBBER SHOES ONLY)
  • 9.4. TRANSPORTATION
  • 9.4.1. LOADING, UNLOADING WORK
  • 9.4.2. METHOD OF LIFTING MACHINE
  • 9.4.3. PRECAUTIONS FOR LOADING
  • 9.4.4. PRECAUTIONS FOR TRANSPORTATION
  • 9.5. COLD WEATHER OPERATION
  • 9.5.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 9.5.2. PRECAUTIONS AFTER COMPLETION OF WORK
  • 9.5.3. PREPARING THE CAB HEATER (MACHINES EQUIPPED WITH CAB)
  • 9.5.4. AFTER COLD WEATHER
  • 9.6. LONGTERM STORAGE
  • 9.6.1. BEFORE STORAGE
  • 9.6.2. DURING STORAGE
  • 9.6.3. AFTER STORAGE
  • 9.7. TROUBLESHOOTING
  • 9.7.1. PHENOMENA THAT ARE NOT FAILURES
  • 9.7.2. METHOD OF TOWING MACHINE
  • 9.7.3. PRECAUTIONS ON PARTICULAR JOBSITES
  • 9.7.4. IF BATTERY IS DISCHARGED
  • 9.7.5. OTHER TROUBLE
  • 10. MAINTENANCE
  • 10.1. GUIDES TO MAINTENANCE
  • 10.2. OUTLINES OF SERVICE
  • 10.2.1. OUTLINE OF OIL, FUEL, COOLANT
  • 10.2.2. OUTLINE OF ELECTRIC SYSTEM
  • 10.2.3. OUTLINE OF HYDRAULIC SYSTEM
  • 10.3. WEAR PARTS LIST
  • 10.4. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 10.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 10.5.1. INTRODUCTION OF NECESSARY TOOLS
  • 10.5.2. TORQUE LIST
  • 10.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 10.7. MAINTENANCE SCHEDULE CHART
  • 10.7.1. MAINTENANCE SCHEDULE CHART
  • 10.7.2. MAINTENANCE INTERVAL WHEN USING HYDRAULIC BREAKER
  • 10.8. SERVICE PROCEDURE
  • 10.8.1. INITIAL 250 HOURS SERVICE
  • 10.8.1.1. CHECK ENGINE VALVE CLEARANCE, ADJUST
  • 10.8.2. WHEN REQUIRED
  • 10.8.2.1. CHECK, CLEAN AND REPLACE AIR CLEANER ELEMENT
  • 10.8.2.2. CLEAN INSIDE OF COOLING SYSTEM
  • 10.8.2.3. DRAIN WATER, SEDIMENT FROM FUEL TANK
  • 10.8.2.4. CLEAN WATER SEPARATOR ELEMENT
  • 10.8.2.5. CHECK ELECTRIC WIRINGS
  • 10.8.2.6. CHECK RUBBER SHOES (MACHINE EQUIPPED WITH RUBBER SHOES)
  • 10.8.2.7. CHECK AND ADJUST TRACK TENSION (MACHINE EQUIPPED WITH RUBBER SHOES)
  • 10.8.2.8. REPLACE RUBBER SHOES (MACHINE EQUIPPED WITH RUBBER SHOES)
  • 10.8.2.9. CHECK AND ADJUST TRACK TENSION (MACHINE EQUIPPED WITH STEEL SHOES)
  • 10.8.2.10. REPLACE BUCKET TEETH (VERTICAL PIN TYPE)
  • 10.8.2.11. INSPECTION OF BUCKET PLAY ADJUSTMENT MECHANISM
  • 10.8.3. CHECK BEFORE STARTING
  • 10.8.3.1. CHECK COOLANT LEVEL, ADD WATER
  • 10.8.3.2. CHECK OIL LEVEL IN ENGINE OIL PAN, ADD OIL
  • 10.8.3.3. CHECK FUEL LEVEL, ADD FUEL
  • 10.8.3.4. CHECK OIL LEVEL IN HYDRAULIC TANK, ADD OIL
  • 10.8.3.5. CHECK DUST INDICATOR
  • 10.8.3.6. CHECK WATER SEPARATOR
  • 10.8.4. EVERY 100 HOURS SERVICE
  • 10.8.4.1. LUBRICATING
  • 10.8.4.1.1. SWING PINION (1POINT)
  • 10.8.4.1.2. SWING CIRCLE (1POINT)
  • 10.8.4.1.3. BOOM SWING CYLINDER FOOT PIN (1POINT)
  • 10.8.4.1.4. BOOM SWING CYLINDER ROD END (1POINT)
  • 10.8.4.1.5. BOOM CYLINDER FOOT PIN (1POINT)
  • 10.8.4.1.6. BLADE CYLINDER FOOT PIN (1POINT)
  • 10.8.4.1.7. BLADE FOOT PIN (2 POINTS)
  • 10.8.4.1.8. BLADE CYLINDER ROD END (1POINT)
  • 10.8.4.1.9. BOOM FOOT PIN (2 POINTS)
  • 10.8.4.1.10. BOOM SWING BRACKET PIN (2 POINTS)
  • 10.8.4.1.11. ARM CYLINDER FOOT PIN (1POINT)
  • 10.8.4.1.12. BOOM CYLINDER ROD END (1POINT)
  • 10.8.4.1.13. BOOMARM COUPLING PIN (1POINT)
  • 10.8.4.1.14. ARM CYLINDER ROD END PIN (1POINT)
  • 10.8.4.1.15. BUCKET CYLINDER FOOT PIN (1POINT)
  • 10.8.4.1.16. BUCKET CYLINDER ROD END PIN (1POINT)
  • 10.8.4.1.17. LINK COUPLING PIN (1POINT)
  • 10.8.4.1.18. BUCKETLINK COUPLING PIN (2 POINTS)
  • 10.8.4.1.19. ARMBUCKET COUPLING PIN (1POINT)
  • 10.8.4.1.20. ARMLINK COUPLING PIN (1POINT)
  • 10.8.5. EVERY 250 HOURS SERVICE
  • 10.8.5.1. CHANGE OIL IN ENGINE OIL PAN, REPLACE ENGINE OIL FILTER CARTRIDGE
  • 10.8.5.2. CHECK OIL LEVEL IN FINAL DRIVE CASE, ADD OIL
  • 10.8.5.3. CHECK LEVEL OF BATTERY ELECTROLYTE
  • 10.8.5.4. REPLACE HYDRAULIC FILTER ELEMENT
  • 10.8.5.5. CHECK FAN BELT TENSION, ADJUST
  • 10.8.6. EVERY 500 HOURS SERVICE
  • 10.8.6.1. REPLACE FUEL FILTER CARTRIDGE
  • 10.8.6.2. CLEAN, CHECK RADIATOR FINS
  • 10.8.7. EVERY 1000 HOURS SERVICE
  • 10.8.7.1. CHANGE OIL IN SWING MACHINERY CASE
  • 10.8.7.2. CHANGE OIL IN FINAL DRIVE CASE
  • 10.8.8. EVERY 2000 HOURS SERVICE
  • 10.8.8.1. CHANGE OIL IN HYDRAULIC TANK CLEAN STRAINER
  • 10.8.8.2. CHECK ALTERNATOR, STARTING MOTOR
  • 10.8.8.3. CHECK ENGINE VALVE CLEARANCE, ADJUST
  • 11. SPECIFICATIONS
  • 11.1. SPECIFICATIONS
  • 12. OPTIONS, ATTACHMENTS
  • 12.1. GENERAL PRECAUTIONS
  • 12.1.1. PRECAUTIONS RELATED TO SAFETY
  • 12.1.2. PRECAUTIONS WHEN INSTALLING ATTACHMENTS
  • 12.2. HANDLING BUCKET WITH HOOK
  • 12.2.1. CHECKING FOR DAMAGE TO BUCKET WITH HOOK
  • 12.2.2. PROHIBITED OPERATIONS
  • 12.2.3. PRECAUTIONS DURING OPERATIONS
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC25-1, PC30-1, PC40-1, PC45-1 Hydraulic Excavator Operation and Maintenance Manual SEAM006600”

Your email address will not be published. Required fields are marked *