Komatsu PC600-8E0, PC600LC-8E0, PC650-8E0, PC650LC-8E0, PC700LC-8E0 Hydraulic Excavator Field Assembly Instruction GEN00101-02

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00101-02
  • Format: PDF
  • Size: 10.4MB
  • Number of Pages: 211

Description

  • Model List:

    • PC600-8E0 Hydraulic Excavator
    • PC600LC-8E0 Hydraulic Excavator
    • PC650-8E0 Hydraulic Excavator
    • PC650LC-8E0 Hydraulic Excavator
    • PC700LC-8E0 Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. SPECIFICATIONS
  • 5. PRECAUTIONS FOR FIELD ASSEMBLY
  • 6. DISPOSAL OF REMOVED PARTS
  • 7. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
  • 8. KIT LAYOUT DIAGRAM
  • 9. TRANSPORTATION
  • 10. LIST OF TOOLS FOR FIELD ASSEMBLING
  • 11. TIGHTENING TORQUE
  • 12. COATING MATERIALS
  • 13. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
  • 14. ASSEMBLY OF CHASSIS
  • 14.1. A 1. Installation of Left and Right Track Frames
  • 14.2. A 2. Installation of Travel Pipe
  • 14.3. A 3. Installation of Operator Cabs Left Handrail
  • 14.4. A 4. Installation of Operator Cabs Door Stopper and Striker
  • 14.5. A 5. Installation of Rearview Mirror
  • 14.6. A 6. Installation of Handrail
  • 14.7. A 71 Installation of Step
  • 14.8. A 72 Installation of Step
  • 14.9. A 8. Installation of Left Side Step
  • 14.10. A 9. Sticking Sheet to Counterweight
  • 14.11. A10. Installation of Rear View Camera
  • 14.12. A11. Installation of Counterweight
  • 14.13. A12. Installation of Step Light
  • 14.14. A13. Bleeding of Air from Travel Motor
  • 14.15. A141 Installation of Travel Piping Cover
  • 14.16. A142 Installation of Travel Piping Cover
  • 14.17. A15. Installation of Travel Motor Guard
  • 14.18. A16. Testing Track Shoe Tension
  • 14.19. A17. Check Fuel, Coolant and Oil Levels
  • 15. ASSEMBLING OF WORK EQUIPMENT
  • 15.1. B 1. Assembly of Arm Cylinder
  • 15.2. B 2. Connection of Arm Cylinder Hoses
  • 15.3. B 3. Installation of Boom Cylinder
  • 15.4. B 4. Installation of Boom Cylinder Hoses
  • 15.5. B 5. Installation of Boom Foot Dust Seal
  • 15.6. B 6. Assembly of Boom Assembly
  • 15.7. B 7. Installation of Hoses from Chassis Along Top of Boom
  • 15.8. B 8. Connection of Boom Cylinder Head
  • 15.9. B 9. Installation of Arm Assembly
  • 15.10. B10. Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
  • 15.11. B11. Installation of Bucket
  • 15.12. B12. Connection of Work Equipment Grease Piping
  • 15.13. B13. Connection of Work Equipment Wiring
  • 15.14. B14. Greasing after Assembling Work Equipment
  • 15.15. B15. Bleeding Air from Work Equipment Circuit
  • 15.16. B16. Parts to be Touched up After Field Assembly
  • 16. Assembling of Work Equipment of Loading Shovel
  • 16.1. C 1. Releasing residual pressure in hydraulic circuit
  • 16.2. C 2. Pulling out boom foot pin and boom cylinder foot pin
  • 16.3. C 3. Installation of boom cylinder foot
  • 16.4. C 4. Installation of boom and arm assembly
  • 16.5. C 5. Installation of boom cylinder hoses
  • 16.6. C 6. Installation of boom cylinder rod pin
  • 16.7. C 7. Installation of boom cylinder
  • 16.8. C 8. Installation of arm cylinder hoses
  • 16.9. C 9. Installation of bucket cylinder
  • 16.10. C10. Installation of bucket cylinder hoses
  • 16.11. C11. Installation of connecting hoses between chassis and boom top
  • 16.12. C12. Installation of bottom dump cylinder hoses
  • 16.13. C13. Installation of bucket assembly
  • 16.14. C14. Installation of working lamps
  • 16.15. C15. Installation of work equipment grease piping
  • 16.16. C16. Greasing after assembling of work equipment
  • 16.17. C17. Bleeding air from work equipment circuit
  • 16.18. C18. Checking oil level in hydraulic tank and adding oil
  • 17. ASSEMBLING OF COUNTERWEIGHT REMOVER
  • 17.1. D 1. Sticking Sheet to Counterweight
  • 17.2. D 2. Adjustment of Shims for Counterweight
  • 17.3. D 3. Greasing
  • 17.4. D 4. Installation of Counterweight Remover
  • 17.5. D 5. Installation of Covers
  • 17.6. D 6. Installation of Clamps
  • 17.7. D 7. Installation of Hoses
  • 17.8. D 8. Bleeding Air from Counterweight Remover Circuit
  • 17.9. D 9. Installation of Counterweight
  • 17.10. D10. Installation of Accessories
  • 17.11. D11. Check of Operation
  • 18. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
  • 18.1. M 1. Inspection of Oil Level in Hydraulic Tank and Refill
  • 18.2. M 2. Replacement of Return Filter (Standard Filter to Flushing Filter)
  • 18.3. M 3. Flushing of Hydraulic Circuit
  • 18.4. M 4. Failure code
  • 18.5. M 5. Operating Method of
  • 19. Field Assembly Inspection Report (Backhoe)
  • 20. Field Assembly Inspection Report (Loading Shovel)
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC600-8E0, PC600LC-8E0, PC650-8E0, PC650LC-8E0, PC700LC-8E0 Hydraulic Excavator Field Assembly Instruction GEN00101-02”

Your email address will not be published. Required fields are marked *