Description
-
Model List:
- PC750-6 Hydraulic Excavator
- PC800-6 Hydraulic Excavator
- 1. MAIN MENU
- 2. COVER
- 3. CONTENTS
- 4. Points Regarding Local Assembly
- 5. Assembling Procedures, Applicable Equipment and Schedule
- 6. Packing Style for Transportation
- 7. List of Tools for Field Assembling
- 8. Field Assembling
- 9. Related Laws and Regulations
- 10. Fitting of Left and Right Track Frames
- 11. Arrangement of Travel Pipe
- 12. Installation of FOPS
- 13. Setting of Radiator Cover
- 14. Fitting of Rearview Mirror
- 15. Installation of Handrail
- 16. Prevention of Natural Closing of Ceiling Window
- 17. Installation of Step
- 18. Installation of Left Side Step
- 19. Setting of Muffler Tail Tube
- 20. Sticking of Sheet (to Counterweight)
- 21. Installation of Counterweight
- 22. Installation of Radio Antenna
- 23. Installation of Cab Top Light
- 24. Fitting of Stopper (on Hydraulic Tank)
- 25. Extension of Track Frame Gauge (Only when 3split packages are transported) (l/3)
- 26. Setting of Travel Pipe Cover
- 27. Adjustment of Track Tension
- 28. Inspection of Oil Amount and Water Amount
- 29. Boom Foot Pin and Boom Cylinder Foot Pin
- 30. Boom Assembly
- 31. Relieving Remaining Pressure from Hydraulic Circuit
- 32. Installation of Boom Cylinder Foot
- 33. Arrangement of Boom Cylinder Hose
- 34. Boom Cylinder
- 35. Arm Cylinder
- 36. Arrangement of Arm Cylinder Hose
- 37. Installation of Arm Assembly
- 38. Arrangement of Bucket Cylinder Hose between Boom and Bucket Cylinder
- 39. Bucket Cylinder Hose between Boom and Bucket Cylinder
- 40. Lubrication Piping to Work Equipment
- 41. Air Bleeding from Cylinder
- 42. Wiring of Work Equipment
- 43. Inspection of Oil Level in Hvdraulic Tank and Refill
- 44. Replacement of Return Filter (Standard Filter to Flushing Filter) (l/Z)
- 45. Flushing of Hydraulic Circuit
- 46. APPENDIX
- 46.1. FIELD ASSEMBLY INSPECTION REPORT
















Reviews
There are no reviews yet.