Komatsu PC80MR-3 Hydraulic Excavator Shop Manual WEBM008601

$50.00

  • Type Of Manual: Shop Manual
  • Manual ID: WEBM008601
  • Format: PDF
  • Size: 31.8MB
  • Number of Pages: 302

Description

  • Model List:

    • PC80MR-3 Hydraulic Excavator
  • 1. CONTENTS
  • 2. REVISED PAGES
  • 3. k SAFETY
  • 4. FOREWORD
  • 5. HOW TO READ THE SHOP MANUAL
  • 6. HOISTING INSTRUCTIONS
  • 7. STANDARD TIGHTENING TORQUE
  • 8. COATING MATERIALS
  • 9. ELECTRIC
  • 10. WEIGHT TABLE
  • 11. TABLE OF OIL AND COOLANT QUANTITIES
  • 12. CONVERSION TABLE
  • 13. STRUCTURE AND FUNCTION
  • 13.1. POWER TRAIN
  • 13.2. SWING CIRCLE
  • 13.3. SWING MACHINERY
  • 13.4. TRACK FRAME AND IDLER CUSHION
  • 13.5. WORK EQUIPMENT CYLINDER
  • 13.6. SOLENOID VALVE GROUP
  • 13.7. CONTROL VALVE
  • 13.8. CLSS
  • 13.9. SWING MOTOR
  • 13.10. ATTACHMENT
  • 13.11. TRAVEL PPC VALVE
  • 13.12. BLADE, BOOM SWING, 2PIECE BOOM PPC VALVES
  • 13.13. EQUIPMENT
  • 14. TESTING AND ADJUSTMENTS
  • 14.1. NORMAL OR STANDARD TECHNICAL DATA
  • 14.1.1. FOR THE ENGINE
  • 14.1.2. FOR MACHINE
  • 14.2. PUMP FEATURES
  • 14.3. CHECK POSITIONS
  • 14.4. SPECIAL TOOLS
  • 14.5. MEASURING THE ENGINE SPEED
  • 14.5.1. Measuring engine speed
  • 14.5.2. Measuring engine speed to check compression pressure
  • 14.6. CHECKING THE EXHAUST SMOKE COLOUR
  • 14.6.1. Checking with tool G1
  • 14.6.2. Checking with tool G2
  • 14.7. REMOVAL OF VALVES COVER
  • 14.8. ADJUSTING VALVE CLEARANCE
  • 14.9. MEASURING COMPRESSION PRESSURE
  • 14.10. TESTING AND ADJUSTING FUEL INJECTION TIMING
  • 14.10.1. Test
  • 14.10.2. Adjustment procedure
  • 14.11. CHECKING ENGINE OIL PRESSURE
  • 14.12. CHECKING AND REGULATING PRESSURE IN THE HYDRAULIC CIRCUITS
  • 14.13. CHECKING AND CALIBRATING PRESSURE IN THE SECONDARY VALVES
  • 14.13.1. Preparing the machine
  • 14.13.2. Checking revolving frame rotational pressure
  • 14.13.3. Adjusting general valve for revolving frame rotation and blade circuit
  • 14.13.4. Checking boom, arm, bucket, boom swing and travel pressure
  • 14.13.5. Adjusting secondary valve for boom, arm, bucket, boom swing and travel
  • 14.13.6. Checking Unloading pressure
  • 14.14. CHECKING AND ADJUSTING THE LS (Load Sensing) VALVE
  • 14.14.1. Measuring DPLS differential pressure
  • 14.14.2. With analog pressure gauge
  • 14.14.3. Adjusting the valve
  • 14.15. ADJUSTING PC VALVE
  • 14.16. CHECKING SERVOCONTROL CIRCUIT PRESSURE
  • 14.16.1. Checking
  • 14.16.2. Adjustment
  • 14.17. CHECKING PPC VALVE DELIVERY PRESSURE
  • 14.18. CHECKING SOLENOID VALVE OUTPUT PRESSURE
  • 14.19. ADJUSTING BOOM SAFETY VALVE
  • 14.20. SAFETY PRESSURE SWITCH CALIBRATION
  • 14.21. ADJUSTING PPC VALVE CLEARANCE
  • 14.22. MEASURING TRAVEL DEVIATION
  • 14.22.1. Measuring the deviation
  • 14.23. CHECKING TRAVEL SPEED
  • 14.24. ANALYSIS OF THE CAUSES OF HYDRAULIC DRIFTS
  • 14.24.1. Boom test
  • 14.24.2. Arm test
  • 14.24.3. Testing the functionality of the boom safety valve.
  • 14.24.4. Bucket test
  • 14.24.5. Boom swing test
  • 14.24.6. Blade test
  • 14.24.7. Swing motor test
  • 14.24.8. Travel motors
  • 14.25. METHODS FOR TESTING FOR LEAKAGES INSIDE THE SWIVEL JOINT
  • 14.25.1. Functionality test
  • 14.25.2. Identification of defective seal
  • 14.26. ELIMINATING PRESSURES FROM CIRCUITS
  • 14.27. MEASUREMENT OF CLEARANCE IN SWING CIRCLE BEARINGS
  • 14.28. TESTING AND ADJUSTING TRACK SHOE TENSION
  • 14.28.1. Checking
  • 14.28.2. Adjustment
  • 14.29. AIR BLEEDING FROM HYDRAULIC CIRCUITS
  • 14.29.1. Order for operations
  • 14.29.2. Bleeding air from pump
  • 14.29.3. Bleeding air from tank
  • 14.29.4. Bleeding air from LS circuits
  • 14.29.5. Bleeding air from hydraulic cylinders
  • 14.29.6. Bleeding air from swing motors
  • 14.29.7. Air bleeding from travel motors
  • 14.29.8. Bleeding air from the revolving frame servocontrol circuit
  • 14.30. TESTING THE AIRCONDITIONING UNIT
  • 14.30.1. Testing the working temperature
  • 14.30.2. Checking the unit
  • 14.31. EMPTYING THE AIRCONDITIONING UNIT
  • 15. REMOVAL AND INSTALLATION
  • 15.1. HOW TO READ THE MANUAL
  • 15.2. PRECAUTIONS TO BE TAKEN WHILE WORKING
  • 15.3. COMPLETE RADIATOR AND AIR CONDITIONING CONDENSER
  • 15.3.1. Removal
  • 15.3.2. Installation
  • 15.4. SWING MOTOR AND REDUCTION GEAR
  • 15.5. SWING REDUCTION GEAR
  • 15.6. EQUIPMENT PPC VALVES
  • 15.7. TRAVEL PPC VALVE
  • 15.7.1. Removal
  • 15.7.2. Installation
  • 15.8. ADDITIONAL EQUIPMENT AND BOOM SWING PPC VALVE
  • 15.8.1. Removal
  • 15.8.2. Installation
  • 15.9. BLADE PPC VALVE
  • 15.9.1. Removal
  • 15.9.2. Installation
  • 15.10. ACCELERATOR POTENTIOMETER
  • 15.11. SAFETY MICROSWITCH
  • 15.11.1. Removal
  • 15.11.2. Installation
  • 15.12. HYDRAULIC OIL TANK
  • 15.12.1. Removal
  • 15.12.2. Installation
  • 15.13. FUEL TANK
  • 15.13.1. Installation
  • 15.14. CONTROL MODULES (MACHINE ENGINE KOMTRAX)
  • 15.14.1. Removal
  • 15.14.2. Installation
  • 15.15. EVAPORATOR UNIT
  • 15.16. REVOLVING FRAME
  • 15.16.1. Removal
  • 15.16.2. Installation
  • 15.17. EQUIPMENT (1piece boom version)
  • 15.17.1. Removal
  • 15.17.2. Installation
  • 15.18. BOOM CYLINDER (For 1piece boom)
  • 15.19. BUCKET CYLINDER
  • 15.19.1. Removal
  • 15.19.2. Installation
  • 15.20. BOOM SWING CYLINDER
  • 15.21. COMPLETE TRAVEL ASSEMBLY
  • 15.21.1. Removal
  • 15.21.2. Installation
  • 15.22. TRACK SHOE IDLER
  • 15.23. BUMPER SPRING
  • 15.24. LOWER IDLER ROLLERS
  • 16. OTHER
  • 16.1. HYDRAULIC CIRCUIT (STANDARD VERSION)
  • 16.2. ELECTRICAL DIAGRAM
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC80MR-3 Hydraulic Excavator Shop Manual WEBM008601”

Your email address will not be published. Required fields are marked *