Description
-
Model List:
- WA380-3 Avance Wheel Loader
- 1. COVER
- 2. FORWARD
- 3. SAFETY INFORMATION
- 4. INTRODUCTION
- 5. LOCATION OF PLATESTABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 6. CONTENTS
- 7. SAFETY
- 7.1. GENERAL PRECAUTIONS
- 7.2. PRECAUTIONS DURING OPERATION
- 7.2.1. BEFORE STARTING ENGINE
- 7.2.2. OPERATING MACHINE
- 7.2.3. TRANSPORTATION
- 7.2.4. BATTERY
- 7.2.5. TOWING
- 7.3. PRECAUTIONS FOR MAINTENANCE
- 7.3.1. BEFORE CARRYING OUT MAINTENANCE
- 7.3.2. DURING MAINTENANCE
- 7.3.3. TIRE
- 7.4. POSITION FOR ATTACHING SAFETY LABELS
- 7.4.1. POSITION FOR ATTACHING SAFETY LABELS
- 8. OPERATION
- 8.1. GENERAL VIEW
- 8.1.1. GENERAL VIEW OF MACHINE
- 9. EXPLANATION OF COMPONENTS
- 9.1. METER,LAMPS
- 9.2. SWITCHES
- 9.3. CONTORL LEVERS,PEDALS
- 9.4. CAP WITH LOCK
- 9.5. SAFETY BAR
- 9.6. TOWING PIN
- 9.7. GREASE PUMP
- 9.8. BACKUP ALARM
- 9.9. FUSE
- 9.10. SLOWBLOW FUSE
- 10. OPERATION
- 10.1. CHECK BEFORE STARTING ENGINE
- 10.2. STARTING ENGINE
- 10.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
- 10.4. MOVING MACHINE OFF
- 10.5. CHANGING GEAR SPEED
- 10.6. CHANGING DIRECTION
- 10.7. TURING
- 10.8. STOPPING MACHINE
- 10.9. OPERATION OF WORK EQUIPMENT
- 10.10. WORK POSSIBLE USING WHEEL LOADER
- 10.11. PRECAUTIONS FOR OPERATION
- 10.12. ADJUSTING WORK EQUIPMENT POSTURE
- 10.13. PARKING MACHINE
- 10.14. CHECKS AFTER COMPLETION OF OPERATION
- 10.15. STOPPING ENGINE NOTICE
- 10.16. CHECEK AFTER STOPPING ENGINE
- 10.17. LOCKING
- 10.18. HANDLING THE TIRES
- 11. TRANSPORTATION
- 11.1. LOADING,UNLOADING WORK
- 11.2. PRECAUTIONS FOR LOADING
- 11.3. PRECAUTIONS FOR TRANSPORTATION
- 12. COLD WEATHER OPERATION
- 12.1. PRECAUTIONS FOR LOW TEMPERATURE
- 12.2. PRECAUTIONS AFTER COMPLETION OF WORK
- 12.3. AFTER COLD WEATHER
- 13. LONGTERM STORAGE
- 13.1. BEFORE STORAGE
- 13.2. DURING STORAGE
- 13.3. AFTER STORAGE
- 14. TROUBLESHOOTING
- 14.1. WHEN MACHINE RUNS OUT OF FUEL
- 14.2. TOWING THE MACHINE
- 14.3. IF BATTERY IS DISCHARGED
- 14.4. OTHER TROUBLE
- 15. MAINTENANCE
- 15.1. GUIDES TO MAINTENANCE
- 15.2. OUTLINES OF SERVICE
- 15.2.1. OUTLINE OF OIL,FUEL,COOLANT
- 15.2.2. OUTLINE OF ELECTRIC SYSTEM
- 15.3. WEAR PARTS LIST
- 15.4. USE OF FUEL,COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
- 15.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 15.5.1. INTRODUCTION OF NECESSARY TOOLS
- 15.5.2. TORQUE LIST
- 15.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 15.7. MAINTENANCE SCHEDULE CHART
- 15.7.1. MAINTENANCE SCHEDULE CHART
- 15.8. SERVICE PROCEDURE
- 15.8.1. INITIAL 250 HOURS SERVICE
- 15.8.2. WHEN REQUIRED
- 15.8.3. CHECK BEFORE STARTION
- 15.8.4. EVERY 50 HOURS SERVICE
- 15.8.5. EVERY 100 HOURS SERVICE
- 15.8.6. EVERY 250 HOURS SERVICE
- 15.8.7. EVERY 500 HOURS SERVICE
- 15.8.8. EVERY 1000 HOURS SERVICE
- 15.8.9. EVERY 2000 HOURS SERVICE
- 15.8.10. EVERY 4000 HOURS SERVICE
- 16. SPECIFICATIONS
- 16.1. SPECIFICATIONS
- 17. OPTIONS,ATTACHMENTS
- 17.1. AIR CONDITIONER
- 17.1.1. GENERAL LOCATIONS AND FUNCTION OF CONTROL PANEL
- 17.1.2. METHOD OF OPERATION
- 18. PROPOSAL
















There are no reviews yet.