Komatsu WA500-6 Wheel Loader Field Assembly Instruction GEN00089-00

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00089-00
  • Format: PDF
  • Size: 4.9MB
  • Number of Pages: 77

Description

  • Model List:

    • WA500-6 Wheel Loader
  • 1. COVER
  • 2. CONTENTS
  • 3. INSTALLATION AND ADJUSTMENT OF PARTS OTHER THAN OPERATORS CAB
  • 3.1. INSTALLATION OF ADDITIONAL AND STANDARD WEIGHTS (1/5)(5/5)
  • 3.2. INSTALLATION OF FLOOR MAT
  • 3.3. INSTALLATION OF LIFT ARM AND BELL CRANK ASSEMBLY
  • 3.4. INSTALLATION OF BUCKET CYLINDER (BELL CRANK SIDE)
  • 3.5. INSTALLATION OF BUCKET (1/2), (2/2)
  • 3.6. INSTALLATION OF RIM AND TIRE ASSEMBLY
  • 3.7. GREASING (1ST TIME)
  • 3.8. INSTALLATION OF LIFT ARM POSITIONER
  • 3.9. SETTING OF MACHINE MONITOR
  • 3.10. DELETION OF ELECTRICAL SYSTEM FAULT HISTORY (1/2), (2/2)
  • 3.11. SELECTION OF OPTIONS (1/3), (2/3), (3/3)
  • 3.12. ADJUSTMENT OF WORK EQUIPMENT CONTROLLER LIFT ARM ANGLE
  • 3.13. ADJUSTMENT OF LOAD METER LIFT ARM ANGLE (1/2), (2/2)
  • 3.14. ADJUSTMENT OF WORK EQUIPMENT EPC LEVER DETENT POSITION (1/2), (2/2)
  • 3.15. ADJUSTMENT OF WORK EQUIPMENT EPC STARTING CURRENT (1/2), (2/2)
  • 3.16. ADJUSTMENT OF BUCKET POSITIONER (1/2), (2/2)
  • 3.17. ADJUSTMENT OF LOAD METER EMPTY CALIBRATION (1/2), (2/2)
  • 3.18. GREASING (2ND TIME)
  • 3.19. TOUCHUP WORK
  • 4. INSTALLATION OF OPERATORS CAB
  • 4.1. NECESSARY TOOLS
  • 4.2. SEPARATELY PACKED SPLIT CAB PARTS LIST
  • 4.3. SPLIT DUMMY FIXING PARTS SET
  • 4.4. PARTS INSTALLED AFTER DISASSEMBLY OF SPLIT CAB (PACKED TOGETHER)
  • 4.5. ASSEMBLY PROCEDURE TABLE FOR SPLIT CAB
  • 4.6. PREPARATION REMOVAL OF VINYL SHEETS (1/9)
  • 4.7. PREPARATION REMOVAL OF COVERS (2/9)
  • 4.8. PREPARATION REMOVAL OF PIPING AND HOSE FIXING BOLTS (3/9)
  • 4.9. PREPARATION REMOVAL OF PIPING AND HOSE FIXING PLATES (4/9)
  • 4.10. PREPARATION REMOVAL OF PARKING BRAKE SWITCH FIXING BRACKET (5/9)
  • 4.11. PREPARATION REMOVAL OF REAR COVER (6/9)
  • 4.12. PREPARATION REMOVAL OF CONTROLLER FIXING COVER AND PLATE (7/9)
  • 4.13. PREPARATION LOOSENING OF CONTROLLER FIXING BRACKET BOLTS (8/9)
  • 4.14. PREPARATION REMOVAL OF PILLARS, MONITOR AND FOOT COVER IN CAB (9/9)
  • 4.15. INSTALLATION OF CAB PREPARATION OF CAB MOUNTING BOLTS AND STICKING OF SEALS (1/19)
  • 4.16. INSTALLATION OF CAB INSTALLATION OF CAB (2/19)
  • 4.17. INSTALLATION OF CAB INSTALLATION OF CAB FIXING BOLTS (3/19)
  • 4.18. INSTALLATION OF CAB INSTALLATION OF BOLTS OF COVER IN CAB (4/19)
  • 4.19. INSTALLATION OF CAB TIGHTENING OF CAB FIXING BOLTS (5/19)
  • 4.20. INSTALLATION OF CAB FIXING OF AIR CONDITIONER UNIT (6/19)
  • 4.21. INSTALLATION OF CAB CONNECTION OF WIRING CONNECTORS (7/19)
  • 4.22. INSTALLATION OF CAB INSTALLATION OF CAB FRONT COVER (9/19)
  • 4.23. INSTALLATION OF CAB INSTALLATION OF MONITOR DASHBOARD COVER (10/19)
  • 4.24. INSTALLATION OF CAB INSTALLATION OF RIGHT AND LEFT PILLAR COVERS IN CAB (11/19)
  • 4.25. INSTALLATION OF CAB FIXING OF RIGHT CONSOLE (12/19)
  • 4.26. INSTALLATION OF CAB CONNECTION OF REAR WIPER CONNECTOR AND REAR WASHER HOSE (13/19)
  • 4.27. INSTALLATION OF CAB INSTALLATION OF LUNCH BOX AND REAR COVER (14/19)
  • 4.28. INSTALLATION OF CAB INSTALLATION OF FLOOR MAT (15/19)
  • 4.29. INSTALLATION OF CAB INSTALLATION OF AIR CONDITIONER PIPING AND HEATER HOSE FIXING PLATE (16/19)
  • 4.30. INSTALLATION OF CAB FIXING OF RESERVOIR TANK AND SUBTANK HOSE (17/19)
  • 4.31. INSTALLATION OF CAB INSTALLATION OF RIGHT AND LEFT COVERS UNDER HYDRAULIC TANK (18/19)
  • 4.32. INSTALLATION OF CAB INSTALLATION OF EXTERNAL AIR FILTER (19/19)
  • 5. FIELDASSEMBLED MACHINE CHECK SHEET
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu WA500-6 Wheel Loader Field Assembly Instruction GEN00089-00”

Your email address will not be published. Required fields are marked *