Description
-
Model List:
- WA500-7 Wheel Loader
- 1. COVER
- 2. CONTENTS
- 3. PROCEDURE
- 3.1. Transportation posture table
- 3.2. Installation of additional weight and counterweight
- 3.3. Installation of muffler stack
- 3.4. Installation of work equipment (Installation of work equipment
- 3.5. Installation of work equipment (Installation of bucket
- 3.6. Installation of work equipment (Greasing after installation of work equipment
- 3.7. Installation of work equipment (Installation of boom potentiometer
- 3.8. Installation of work equipment (Installation of bucket potentiometer wiring harness)
- 3.9. Adjustment work after installation (Adjusting machine monitor
- 3.10. Adjustment work after installation (Greasing after adjustment of monitor
- 3.11. Installation of air cleaner cap
- 3.12. Installation of R.H. platform and handrail
- 3.13. Installation of cab (Necessary tools and General tightening torque list)
- 3.14. Installation of cab (Split cab parts list)
- 3.15. Disassembly of cab (Preparation for transportation) 1
- 3.16. Disassembly of cab (Preparation for transportation) 2
- 3.17. Disassembly of cab (Preparation for transportation) 3
- 3.18. Disassembly of cab (Preparation for transportation) 4
- 3.19. Disassembly of cab (Preparation for transportation) 5
- 3.20. Disassembly of cab (Preparation for transportation) 6
- 3.21. Disassembly of cab (Preparation for transportation) 7
- 3.22. Field assembly (Assembly of cab) 1
- 3.23. Field assembly (Assembly of cab) 2
- 3.24. Field assembly (Assembly of cab) 3
- 3.25. Field assembly (Assembly of cab) 4
- 3.26. Field assembly (Assembly of cab) 5
- 3.27. Field assembly (Assembly of cab) 6
- 3.28. Charging refrigerant
- 3.29. Final check (Operation check of accelerator, brake,and work equipment)
- 4. Appendix Field assembly inspection report
















There are no reviews yet.